Loading...
22-105154City or Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax:(253)835-2609 Project Name: THE WOODLANDS AT REDONDO CREEK LOT 59 Project Address: 30328 19TH AVE S Building - Single Family Permit #:22-105154-00-SF Inspection Request Line: (253) 835-3050 Parcel Number: 952651 0590 Project Description: BLUEBEAM - Construction of a 2535 square foot, 2-story, single family residence with a 60 square foot covered entry and a 421 square foot attached garage. Includes plumbing and mechanical. Owner Applicant Contractor Lender SSHI LLC DBA D R HORTON JESS BOSANCUD R HORTON D R HORTON OWNER IS LENDER 11241 SLATER AVE NE SUITE 12C 11241 SLATER AVE NE SUITE 120 11241 SLATER AVE NE SUITE 120 KIRKLAND WA 98033 KIRKLAND WA 98033 KIRKLAND WA 98033 Census Category: 101 - New Single Family House Includes: #1 #2 #3 #4 Occupancy Class: R-3 Construction Type: Type V - B Occupancy Load: Floor Area (sq. 11.) 2,535.00 Additional Permit Information New / Additional Sq. Feet - 1 st Floor ..................... 1139 New / Additional Sq. Feet - 3rd Floor ..................... 0 New / Additional Sq. Feet - Basement .................... 0 Occupancy #1 - Construction Type ......................... Type V - B New / Additional Sq. Feet - Garage ........................ 421 Plumbing Work Valuation? ..................................... 25000 Number of Stories ................................................... 2 Plumbing to be Included? ...........................:............ Yes Will Certificate of Occupancy be Issued? ............... Yes Comprehensive Plan Designation ........................... SF - High -Density Residential Total Valuation: 335,236.39 Ducting Gas Piping Bathtubs Lavatories Water Closets New / Additional Sq. Feet - 2nd Floor .................... 1396 Occupancy #1 - Area (Sq. Feet) .............................. 2535 BasicPlan?........................................................... No New / Additional Sq. Feet - Deck ........................... 0 Mechanical to be Included? ..................................... Yes Mechanical Work Valuation? .................................. 20000 New / Additional Sq. Feet - Other ........................... 60 New / Additional Sq. Feet - Total ........................... 3016 Occupancy #1 - Use ................. Residence (1 or 2 family) Zoning Designation ................................................. RS 5.0 1 Fans 1 Gas Pipe Outlets R. Plumbing Fixtures 2 Dishwashers 4 Showers 3 Water Heaters 6 Furnaces l 2 1 1 Laundry Washer Outlets 1 2 Sinks 1 1 Hose Bibbs 2 PERMIT EXPIRES Monday, 7 August, 2023 Permit Issued on Wednesday, February 8, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washin d he City of. Federal Way. Owner or agent: Date: City of Federal Way Certificate of Occupancy This Certificate issued pursuant to the requirements of Section 111 of the International Building Code or Section R110 of the International Residential Code is certifying that at the time of issuance, this structure was in compliance with the various ordinances of the City regulating building construction or use. This certificate is valid ONLY when endorsed by City staff. Tenant Name: THE WOODLANDS AT REDONDO CREEK LOT Permit # 22-105154-00-SF Address: 30328 19TH AVE S Includes: #1 #2 #3 #4 Occupancy Class: R-3 Construction Type: Type V - B Occupancy Load: Floor Area (sq. ft.) 2,535.00 Owner Name: SSHI LLC DBA D R HORTON Owner Address: 11241 SLATER AVE NE SUITE 120 KIRKLAND WA 98033 Date The priority focus in t ri review and inspection made by the City prior to issuance of this Certificate was on those matters which experience has shown most severely affect the health and safety of the general public. Although the City has made as complete a review and inspection as is reasonably possible (within budgetary time and personnel limitations), the City neither guarantees nor warrants to the owner/occupant or to any other person that this Certificate evidences strict compliance with each and every ordinance or regulation of the City or the State of Washington affecting the construction or use of said structure or the land upon which it is situated. Such compliance is the responsibility of the owner and/ or occupant of the premises. 4%�' V�deraI Way THIS CARD IS TO REMAIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 22 105154 00 Address: 30328 19TH AVE S Project: D R HORTON FEDERAL WAY WA 98003 �dufed inspections may be railed irthis card is not on -site. DO NOT LOSE 11I15 CARD. Inspections are listed as close to sequential order as possible Work not be covered until it is approved. Check with your inspector if Scri must ; d left to right. top to bottom). Please schedule inspections as appropriate. are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. Q SWM Precon Site Mtg (4400) 0 Site Assessment (Erosion) (4365) 0 Footings/Setback (4110) Approved To be done PRIOR to breaking ground Approved to place concrete Date By Date By I o / 7Z �O Date GG Sy Foundation Wall (4115) 0 Drainage/Downspout (4040) ® Plumbing Groundwork (4190) + y IJ� 4� Approved to place concrete Approved to backfill Approved to cover C� Date G By 4 Date Z By Date y� 87� Slab/Concrete Floor (4255) ® Underfloor Framing (4285) 0 Floor Sheathing (4105) Approved to place concrete Approved to sheath floor �� iLa Approved to install flooring �7 dj Date By Date By Date G sy ❑ Shear Walls (4245) 11 Roof Sheathing (4220) Rough Plumbing (4230) z Approved to install siding Approved to install roofing Approved Date J �' By Date 4q.LZ'J By Date sy Mechanical Rough -in (4165) 14 Gas Piping (4125) Q Fire/Draft Stops (4095) Approved Approved 415 Approved to release test �]�� By /1 --77 0 Date Date By Date ji 6Y 5 Interim Erosion Control (4370) Prior to scheduling a Framing inspection; 17 Framing (4120) Approved Electrical, Plumbing & Mechanical Rough -in and Fire/Draft Stop inspections must be signed- Approved to insulate off and approved. IBC 109.3.4 By (�jj Date [jvrj� Date 18 Insulation (4150) 19 Gypsum Wallboard Nailing (4130) '] Final Erosion Control (4375) Approved to instal I wallb d Approved to install mud & tape Approved By �� Date i Z By 11 Date - By Date Final - Mechanical (4065) 22 Final - Plumbing (4075) z3 Final - Building (4050) ('� Approved '�%� " By Approved JG Date l 2' By Approved Date By ,V Date�� ) Final Electrical Right of Way Approved Rough Electrical Approved Approved By Date By Date I By Date ` Federal Way Building Division 33325 Eighth Avenue South Federal Way, WA 98003-6325 Phone 253-835-2607 Fax 253-835-2609 CORRECTION NOTICE ADDRESS: PERMIT#: IF YOU HAVE QUESTIONS CALL (253) 835- _262_-,T WHEN CORRECTIONS HAVE BEEN MADE, CALL (253) 8 -3050 FOR RE -INSPECTION. SEE BACK OF CARD FOR DETAILS. NOTE: ELECTRICAL CORRECTIONS ARE REQUIRED TO BE MADE WITHIN 15 DAYS. DATE INSPECTOR DO NOT REMOVE THIS NOTICE Page of 1Federal Way CITY OF Building Division 33325 Eighth Avenue South Federal Way, WA 98003-6325 Phone 253-835-2607 Fax 253-835-2609 CORRECTION NOTICE af"Ve-11 —60ADDRESS: IF YOU HAVE QUESTIONS CALL , p rI n% (253) 835- Z' WHEN CORRECTIONS HAVE BEEN MADE, CALL (253) 835-3050 FOR RE -INSPECTION. SEE BACK OF CARD FOR DETAILS. NOTE: ELECTRICAL CORRECTIONS ARE REQUIRED TO BE MADE WITHIN 15 DAYS. ATE TO INSPECTOR DO NOT REMOVE THIS NOTICE Page of