Project Name: THE WOODLANDS AT REDONDO CREEK LOT 59
Project Address: 30328 19TH AVE S
Building - Single Family
Permit #:22-105154-00-SF
Inspection Request Line: (253) 835-3050
Parcel Number: 952651 0590
Project Description: BLUEBEAM - Construction of a 2535 square foot, 2-story, single family residence with a 60
square foot covered entry and a 421 square foot attached garage. Includes plumbing and
mechanical.
Owner
Applicant
Contractor
Lender
SSHI LLC DBA D R HORTON
JESS BOSANCUD R HORTON
D R HORTON
OWNER IS LENDER
11241 SLATER AVE NE SUITE 12C
11241 SLATER AVE NE SUITE 120
11241 SLATER AVE NE SUITE 120
KIRKLAND WA 98033
KIRKLAND WA 98033
KIRKLAND WA 98033
Census Category: 101 - New Single Family House
Includes:
#1
#2
#3
#4
Occupancy Class:
R-3
Construction Type:
Type V - B
Occupancy Load:
Floor Area (sq. 11.)
2,535.00
Additional Permit Information
New / Additional Sq. Feet - 1 st Floor .....................
1139
New / Additional Sq. Feet - 3rd Floor .....................
0
New / Additional Sq. Feet - Basement ....................
0
Occupancy #1 - Construction Type .........................
Type V - B
New / Additional Sq. Feet - Garage ........................
421
Plumbing Work Valuation? .....................................
25000
Number of Stories ...................................................
2
Plumbing to be Included? ...........................:............
Yes
Will Certificate of Occupancy be Issued? ...............
Yes
Comprehensive Plan Designation ........................... SF - High -Density
Residential
Total Valuation: 335,236.39
Ducting
Gas Piping
Bathtubs
Lavatories
Water Closets
New / Additional Sq. Feet - 2nd Floor ....................
1396
Occupancy #1 - Area (Sq. Feet) ..............................
2535
BasicPlan?...........................................................
No
New / Additional Sq. Feet - Deck ...........................
0
Mechanical to be Included? .....................................
Yes
Mechanical Work Valuation? ..................................
20000
New / Additional Sq. Feet - Other ...........................
60
New / Additional Sq. Feet - Total ...........................
3016
Occupancy #1 - Use .................
Residence (1 or 2
family)
Zoning Designation .................................................
RS 5.0
1 Fans
1 Gas Pipe Outlets
R. Plumbing Fixtures
2 Dishwashers
4 Showers
3 Water Heaters
6 Furnaces l
2
1
1 Laundry Washer Outlets 1
2 Sinks 1
1 Hose Bibbs 2
PERMIT EXPIRES Monday, 7 August, 2023
Permit Issued on Wednesday, February 8, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washin d he City of. Federal Way.
Owner or agent: Date:
City of Federal Way
Certificate of Occupancy
This Certificate issued pursuant to the requirements of Section 111 of the International Building Code or Section
R110 of the International Residential Code is certifying that at the time of issuance, this structure was in
compliance with the various ordinances of the City regulating building construction or use. This certificate is valid
ONLY when endorsed by City staff.
Tenant Name: THE WOODLANDS AT REDONDO CREEK LOT Permit # 22-105154-00-SF
Address: 30328 19TH AVE S
Includes: #1 #2 #3 #4
Occupancy Class: R-3
Construction Type: Type V - B
Occupancy Load:
Floor Area (sq. ft.) 2,535.00
Owner Name: SSHI LLC DBA D R HORTON
Owner Address: 11241 SLATER AVE NE SUITE 120
KIRKLAND WA 98033
Date
The priority focus in t ri review and inspection made by the City prior to issuance of this Certificate was on those matters which
experience has shown most severely affect the health and safety of the general public. Although the City has made as complete
a review and inspection as is reasonably possible (within budgetary time and personnel limitations), the City neither guarantees
nor warrants to the owner/occupant or to any other person that this Certificate evidences strict compliance with each and every
ordinance or regulation of the City or the State of Washington affecting the construction or use of said structure or the land upon
which it is situated. Such compliance is the responsibility of the owner and/ or occupant of the premises.
4%�'
V�deraI Way
THIS CARD IS TO REMAIN ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 22 105154 00
Address: 30328 19TH AVE S
Project: D R HORTON
FEDERAL WAY WA 98003
�dufed
inspections may be railed irthis card is not on -site. DO NOT LOSE 11I15 CARD. Inspections are listed as close to sequential order as possible
Work not be covered until it is approved. Check with your inspector if
Scri must
; d left to right. top to bottom). Please schedule inspections as appropriate.
are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on
the back of this card.
Q
SWM Precon Site Mtg (4400)
0
Site Assessment (Erosion) (4365)
0
Footings/Setback (4110)
Approved
To be done PRIOR to breaking ground
Approved to place concrete
Date
By
Date
By
I o / 7Z
�O Date GG
Sy
Foundation Wall (4115)
0
Drainage/Downspout (4040)
®
Plumbing Groundwork (4190) + y
IJ� 4�
Approved to place concrete
Approved to backfill
Approved to cover
C� Date G
By
4 Date Z
By
Date y�
87�
Slab/Concrete Floor (4255)
®
Underfloor Framing (4285)
0
Floor Sheathing (4105)
Approved to place concrete
Approved to sheath floor
��
iLa
Approved to install flooring �7
dj
Date
By
Date
By
Date G
sy
❑
Shear Walls (4245)
11
Roof Sheathing (4220)
Rough Plumbing (4230)
z
Approved to install siding
Approved to install roofing
Approved
Date J �'
By
Date 4q.LZ'J
By
Date
sy
Mechanical Rough -in (4165)
14
Gas Piping (4125)
Q
Fire/Draft Stops (4095)
Approved
Approved
415
Approved to release test
�]��
By
/1 --77
0 Date
Date
By
Date ji
6Y
5
Interim Erosion Control (4370)
Prior to scheduling a Framing inspection;
17
Framing (4120)
Approved
Electrical, Plumbing & Mechanical Rough -in
and Fire/Draft Stop inspections must be signed-
Approved to insulate
off and approved. IBC 109.3.4
By
(�jj Date [jvrj�
Date
18
Insulation (4150)
19
Gypsum Wallboard Nailing (4130)
']
Final Erosion Control (4375)
Approved to instal I wallb d
Approved to install mud & tape
Approved
By
�� Date i Z
By
11 Date -
By
Date
Final - Mechanical (4065)
22
Final - Plumbing (4075)
z3
Final - Building (4050)
('� Approved '�%�
" By
Approved
JG Date l 2'
By
Approved
Date
By
,V Date��
)
Final Electrical
Right of Way
Approved
Rough Electrical
Approved
Approved
By
Date
By
Date
I By
Date
` Federal Way
Building Division
33325 Eighth Avenue South
Federal Way, WA 98003-6325
Phone 253-835-2607 Fax 253-835-2609
CORRECTION NOTICE
ADDRESS: PERMIT#:
IF YOU HAVE QUESTIONS CALL (253) 835-
_262_-,T
WHEN CORRECTIONS HAVE BEEN MADE, CALL (253) 8 -3050 FOR RE -INSPECTION. SEE BACK OF CARD
FOR DETAILS. NOTE: ELECTRICAL CORRECTIONS ARE REQUIRED TO BE MADE WITHIN 15 DAYS.
DATE INSPECTOR
DO NOT REMOVE THIS NOTICE
Page of
1Federal Way
CITY OF
Building Division
33325 Eighth Avenue South
Federal Way, WA 98003-6325
Phone 253-835-2607 Fax 253-835-2609
CORRECTION NOTICE
af"Ve-11 —60ADDRESS:
IF YOU HAVE QUESTIONS CALL , p rI n% (253) 835- Z'
WHEN CORRECTIONS HAVE BEEN MADE, CALL (253) 835-3050 FOR RE -INSPECTION. SEE BACK OF CARD
FOR DETAILS. NOTE: ELECTRICAL CORRECTIONS ARE REQUIRED TO BE MADE WITHIN 15 DAYS.
ATE
TO
INSPECTOR
DO NOT REMOVE THIS NOTICE
Page of