Loading...
23-103329Electrical City ofFederal Way Permit #:23-103329-00-EL Community Development Dept. FILE 33325 8th Ave S Federal Way, WA 98003 Inspection Request Line: (253) 835-3050 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: LUIS Project Address: 32402 LOTH PL S Parcel Number: 150240 0120 Project Description: Provide (1) like -for -like 200A panel update; install (4) 15-20A circuits (one each for kitchen, lighting, bathroom, and washer) Owner Applicant Contractor MORRIS LUIS CORY HESSELTINEN R G SERVICES LLC ECO ELECTRIC (ELECTRICAL) 32402 LOTH PL S dba ECO ELECTRIC ECOELE*842DN (3/15/24) FEDERAL WAY WA 98003 126 S SPOKANE ST PO BOX 468 USA SEATTLE WA 98134 MERCER ISLAND WA 98040 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes .Cal Alt. Serv./Feeder: 0 to 200 aml 1 Circuits - Residential 4 PERMIT EXPIRES Sunday, 24 December, 2023 Permit Issued on Tuesday, June 27, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: _ I ! ■ I P Dale G17.Y or Federal Way TMS CARD IS TO REM_4IN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 335-30-50 Scheduled inspections nua; be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right. top to bottom). Please schedule inspections as appropriate. 'Work must not be covered until it is approved Check with flour inspector if you are unsure about anv of the inspections or the inspection sequence. Oa -going inspections are logged on the back of this card. ELECTRICAL Q By LTIR Ground (4295) Approved Date ❑ By Ditch cover (4030) Approved Date ❑ By Slab/Concrete Floor (4255) Approved to place concrete Date ❑ Pool Bonding (4195) ❑ Temporary Power (4275) ❑ Semite (4235) Approved Approved' ? Approved By Date By Date By y y Date�� ✓`/ ❑ Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) 0 Ceiling Cover (4020) Approved Approved Approved By Date By Date By Date El Final - Electrical (4055) roved By Date' MECHANICAL ❑ Mechanical Rough -in (4165) ❑ Gas Piping (4125) "❑ Final - Mechanical (4065) Approved Approved to release test Approved By- Date By Date By Date PLUMBING Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) ❑ Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date By Date