23-103651City of Federal Way
FILE
Community Development Dept.
33325 Sth Ave 5
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: SAEPAN
Project Address: 31819 LOTH PL SW
Electrical
Permit #:23-103651-00-EL
Inspection Request Line: (253) 835-3050
Project Description: New Dedicated Circuit for Car Charger and Treadmill.
Parcel Number: 555730 0450
Owner
Applicant
Contractor
WESLEY & JENNY SAEPAN
BEKAH SWANSONSEATOWN ELECTRIC
SEATOWN ELECTRIC CORP (EL 02)
31819 LOTH PL SW
CORP
SEATOEC860RB (12/2/24
FEDERAL WAY WA 98023
3431 BROADWAY
3431 BROADWAY
EVERETT WA 98201
USA
EVERETT WA 98201
Additional Permit Information
Is this an Online or O.T.C. application? .................. Yes
Circuits - Residential
Electrical Fixtures
2
PERMIT EXPIRES Sunday, 14 January, 2024
Permit Issued on Tuesday, July 18, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washirrgtcn and t4 `City of Federal Way.
Owner or agent:
Date
GIT.Y OT '•-doll
Federal Way
THIS CARD IS TO RE\LEI\ ON -SITE
Construction Inspection Record
I\SPECTIO\ REQUESTS: (253) 335-3050
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE TMS CARD. Inspections are listed as close to sequential order as possible
(read Ieft to right. top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Cheri: with your inspector if
you are unsure about any of the inspections or the inspection sequence_ On -going inspections are logged on the back of this card.
ELECTRICAL
Q
B}-
LIFER Ground (4295)
Approved
Date
Q
By
Ditch cover (4030)
Apprm-ed
Date
❑
By
Slab/Concrete Floor (4255)
Approved to place concrete
Date
0
Pool Bonding (4195)
❑
Temporary Power (4275)
❑
Service (4235)
Approved
Approved
Approved
By
Date
By
Date
By
Date
❑
Feeders/Sub-panels (4045)
❑
Rough Electrical (4215)
Ceiling Cover (4020)
Approved
Approved
Approved
By
Date
By
Date
By
Date
El
Final - Electrical (4055)
Approved
By
Og5 Date cZ,/
MECHANICAL
❑
Mechanical Rough -in (4165)
❑
Gas Piping (4125)
0
Final - Mechanical (4065)
Approved
Approved to release test
Approved
By
Date
By
Date
By
Date
PLUMBING
❑ Plumbing Groundwork (4190)
❑
Rough Plumbing (4230)
❑
Final - Plumbing (4075)
Approved to cover
Approved
Approved
By Date
By
Date
By
Date