Loading...
23-102661City of Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: METAW/SHIBESHI Project Address: 32413 6TH AVE SW Electrical Permit #:23-102661-0.0-EL FI LF Inspection Request Line: (253) 835-3050 Parcel Number: 926490 2250 Project Description: Wire unfinished basement 2 bathrooms & 2 bedrooms, 100A subpanel Owner Applicant Contractor KEBRET METAW ROGER STEWARTCASCADE LIGHTS LLC CASCADE LIGHTS LLC 32413 6TH AVE SW 12718 118TH ST E CASCALL884136 (4/26/24) FEDERAL WAY WA 98023 PUYALLUP WA 98374 12718 118TH ST E PUYALLUP WA 98374 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes Electrical Fixtures Alt. Serv./Feeder: 0 to 200 aml 1 Circuits - Residential 7 PERMIT EXPIRES Wednesday, 15 November, 2023 Permit Issued on Friday, May 19, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: a NNE 1 I Date. CITY or - Federal Way THIS CARD IS TO REALM\ ON -SITE Construction Inspection Record INSPEC'TION REQUESTS: (253) 33-5-30:50 Scheduled inspections rttaz: be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right. top to bottom). Please schedule inspections as appropriate Fork must not be cohered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. ELECTRICAL ❑ LTFER Ground (4295) ❑ Ditch cover (4030) Q Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date Bg Date ❑ Pool Bonding (4195) ❑ Temporary Porter (4275) ❑ Service (4235) Approved Approved Approved By Date By Date B} Date ❑ Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) 0 Ceiling Cover (4020) pprorrd Approved Approved By Date, By Date�� By Date 0 Final - Electrical (4055) Approved By Date MECHANICAL ❑ Mechanical Rough -in (4165) l Gas Piping (4125) Q Final - Mechanical (4065) Approved Approved to release test Approved By Date B}Date By Date PLUMBING '❑ Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) ❑ Final - Plumbing (4075) Approved to corer Approved Approved By Date By Date BS- Date