Loading...
23-103116City of Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: PRATHER-WEDDERBURN Project Address: 30509 7TH AVE SW Electrical Permit #:23-103116-00-EL Inspection Request Line: (253) 835-3050 Project Description: BLUEBEAM - 3.20 kW DC roof mounted PV solar system. Parcel Number: 178880 0170 Owner Applicant Contractor CHRYSTAL PRATHER-WEDDERBURN JESUS FAMILIALUMIO LUMIO HX INC 635-A BALTIC ST 1550 W DIGITAL DR LUMIOHI784K4 (5/24/24) BROOKLYN NY 11217 LEHI UT 84043 1550 W DIGITAL DR LEHI UT 84043 Additional Permit Information Is this an Online or O.T.C. application? .................. No Electrical Fixtures Alt. Serv./Feeder: 0 to 200 aml CONDITIONS: FIRE APPROVAL CONDITIONS: Upon completion of installation, the following photographs shall be emailed to planreview@southkingfire.org and alarms@southkingfire.org - Finished installation showing 36" access from the ground and 18" clearance at roof peak. - Location of shutoff switch with signage. - Photo of the front of the house showing the address or street side view. Email the photographs at least 2 business days before requesting electrical final. Due to size limitations, save photos on a single page and save as a .pdf before sending. You will receive a response back from SKFR once the permit has been approved by SKFR so you can schedule your electrical final inspection. If no resvouse from SKFR within 2 business days. call 253-946-7348 to check status. PERMIT EXPIRES Wednesday, 27 December, 2023 Permit Issued on Friday, June 30, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of W shingtor4-and laeIG- ity of Federal Way. Owner or agent: Date: THIS CARD IS TO REMAIN ON -SITE CITY OF �r Construction Inspection Record Federal Way INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 23 103116 00 Address: 30509 7TH AVE SW Project: CHRYSTAL PRATHER-WEDDERBI FEDERAL WAY WA 98023-3922 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. 0 UFER Ground (4295) Ditch cover (4030) ❑ Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date Q Pool Bonding (4195) ❑ Temporary Power (4275) ❑ Service (4235) Approved Approved Approved By Date By Date By Date ❑ Feeders/Sub-panels (4045) Rough Electrical (4225) 0 Final - S K F & R (4060) Approved Approved Approved By Date By Date By Date 1 F�c Ceiling Cover (4020) Final - Electrical (4055) Approved By Date By Approved ❑ Rough Electrical ❑ Final Electrical Right of Way Approved Approved Approved By Date By Date By Date