Loading...
23-102899Electrical City of Federal Way Community Development Dept 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: DO Project Address: 410 S 306TH ST Project Description: BLUEBEAM - 4.4 kW PV solar system, roof mounted. Permit #:23-102899-00-EL Inspection Request Line: (253) 835-3050 Parcel Number: 241330 0440 Owner Applicant Contractor QUAN DO BRS PERMITTING B R S FIELD OPS LLC 410 S 306TH ST 1403 N RESEARCH WAY BRSFIF0820N3 (8/23/24) FEDERAL WAY WA.98003 OREM UT 84097 1403 N RESEARCH WAY OREM UT 84097 Additional Permit Information Is this an Online or O.T.C. application? .................. No ?'ixtu res Alt. Serv./Feeder: 0 to 200 aml CONDITIONS: FIRE APPROVAL CONDITIONS: Upon completion of installation, the following photographs shall be emailed to planreview@southkiingfire.org and alarms@southkiingfire.org - Finished installation showing 36" access from the ground and 18" clearance at roof peak. - Location of shutoff switch with signage. - Photo of the front of the house showing the address or street side view. Epiail the photographs at least 2 business days before requesting electrical final. Due to size limitations, save photos on a single page and save as a .pdf before sending. You will receive a response back from SKFR once the permit has been approved by SKFR so you can schedule your electrical final inspection. If no response from SKFR within 2 business da>-s, call 253-946-7348 to check status. PERMIT EXPIRES Saturday, 23 December, 2023 Permit Issued on Monday, June 26, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with -the laws, rules and regulations of the State of Wa4firigt6n aid the City of Federal Way. = r REPRIMED / Owner or agent: - Date r,;z 1 9094 THIS CARD IS TO REMAIN ON -SITE C,"oF V'^�-� Construction Inspection Record Federal Way INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 23 102899 00 Address: 410 S 306TH ST Project: QUAN DO FEDERAL WAY WA 98003-4067 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. ❑ UFER Ground (4295) 0 Ditch cover (4030) 0 Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date F1 Pool Bonding (4195) 0 Temporary Power (4275) Q Service (4235) Approved Approved Approved By Date By Date By Date 0 Feeders/Sub-panels (4045) Rough Electrical (4225) 0 Final - S. K F & R (4060) Approved Approved Approved By Date By Date By Date Ceiling Cover (4020) El Final - Electrical (4055) Approved Approved 3y Date By Date Rough Electrical LlFinal Electrical L3Right of Way Approved Approved Approved fly Date By Date By Date