Loading...
23-101037City of Federal Way Community Development A835-2609 33325 8th Ave S Federal Way, WA 980 Ph: (253) 835-2607 Fax: (253) Project Name: FOUNTAIN PLAZA II -SUITE 230 Project Address: 501 S 336TH ST Mechanical Permit #:23-101037-00-ME Inspection Request Line: (253) 835-3050 Parcel Number: 926480 0240 Project Description: BLUEBEAM - Modify ductwork to accommodate tenant improvements. Add/relocate GRDs. Owner Applicant Contractor RH FOUNTAIN PLAZA ASSOC LLC VAN DUONGPERFORMANCE PERFORMANCE MECHANICAL GROUP PO BOX 5003 MECHANICAL GROUP (GENERAL) BELLEVUE WA 98009 1012 CENTRAL AVE S PERFOHA150RT (4/30/23) KENT WA 98032 1012 CENTRAL AVE S KENT WA 98032 Additional Permit Information Mechanical Work Valuation? .................................. 5345 Is this an Online or O.T.C. application?.................. No Ducting CONDITIONS: rate electrical permit required for thermostats. PERMIT EXPIRES Monday, 4 September, 2023 Permit Issued on Wednesday, March 8, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Wash I L the City of Federal Way. 6. Owner or agent: Date: E :- F� vke.k THIS CARD IS TO REMAIN ON -SITE CITY OF Construction Inspection Record Federal Way INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 23 101037 00 Address: 501 S 336TH ST Suite 230 Project: RH FOUNTAIN PLAZA ASSOC LLC FEDERAL WAY WA 98003 Scheduled inspections may be failed if this card is not on -site. DO No'l' LOSE THIS CARD, Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. 0 Mechanical Rough -in (4165) 0 Gas Piping (4125) 0 Final - Mechanical (4065) Approved Approved to release test Approved By Date By Date By Date 1 Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date