Loading...
23-102509City of Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 FILE Electrical Permit #:23-102509-00-EL Inspection Request Line: (253) 835-3050 Project Name: GARROW/JULYAN Project Address: 30206 27TH AVE S Parcel Number: 798480 0120 Project Description: gas furnace replacement with heat pump add on / new tstat / new circuit / new gfci outlet Owner Applicant Contractor KATHLEEN GARROW TAYLER MANNINGPACIFIC HEATING & PACIFIC HEATING & COOLING 30206 27TH AVE S COOLING (ELECTRICAL) FEDERAL WAY WA 98003 8607 DURANGO ST SW SUITE A PACIFHC798DR (4/12/25) TACOMA WA 98499 8607 DURANGO ST SW SUITE A TACOMA WA 98023 Additional Permit Information Is this an Online or O.T.C. application?...... ........... . Yes 1 Electrical Fixtures Circuits - Residential 4 Thermostat 1 PERMIT EXPIRES Tuesday, 7 November, 2023 Permit Issued on Thursday, May 11, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of hi g n a e of Federal Way. N L N Owner or agent: Date: CITY OF Federal Way THIS CARD IS TO REII_JI\ ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253)3355-30-50 Scheduled inspections inay be failed if this card is not on -site. DO NOT LOSE TIM CARD. Inspections are listed as close to sequential order as possible (read left to right. top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. ELECTRICAL ❑ UFER Ground (429) Q Ditch corer (4030) Q Slab/Concrete Floor (4255) Approved Approved Approved to place concrete B}' Date By Date By Date ❑ By Pool Bonding (4195) 3pgrored Date ❑ Temporary Power (4275) Approved Date By Service (4235) Approved Date 0 Feeders/Sub-panels (4045) 0 Rough Electrical (4225) ❑ Ceiling Corer (4020) Approved Approved Approved By Date By Date By Date 0 Final - Electrical (4055) Approved By Date'00�/� MECHANICAL ❑ Mechanical Rough -in (4165) ❑ Gas Piping (4125) ❑ -Final - Mechanical (4065) Approved Approved to release test Approved By Date By Date By Date PLUMBING 0 Plumbing Groundwork (4190) 0 Rough Plumbing (4230) ❑ Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date By Date