Loading...
23-101136City of Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 FILE Project Name: FOUNTAIN PLAZA I - SUITE 325 Project Address: 505 S 336TH ST Electrical Permit #:23-101136-00-EL Inspection Request Line: (253) 835-3050 Project Description: Install 3 new thermostats & relocate 2 existing thermostats. Parcel Number: 926480 0270 Owner Applicant Contractor RH FOUNTAIN PLAZA ASSOC LLC VAN DUONGPerformance Mechanical Group PERFORMANCE HEATING & A/C (EL 06) PO BOX 5003 1012 CENTRAL AVE S PERFOHAO05BS (2/01/24) BELLEVUE WA 98009 KENT WA 98032 1012 CENTRAL AVE S KENT WA 98032 Additional Permit Information Is this an Online or O.T.C. application? ................ . Yes Electrical Fixtures Thermostat 5 PERMIT EXPIRES Wednesday, 30 August, 2023 Permit Issued on Friday, March 3, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of 'Wal Inon an the City -of Federal Way. . t . Owner or agent: � Date CRY Of ;A, Federal Way THIS CARD IS TO RE\LEI\ ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 Scheduled inspections may be failed if this cud is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right. top to bottom). Please schedule inspections as appropriate. Work mist not be covered until it is approved. Check with your inspector if unsure you are about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. ELECTRICAL 0 UFER Ground (4295) ❑ Ditch cover (4030) ❑ Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date ❑ Pool Bonding (4195) ❑ Temporary Power (4275) ❑ Service (4235) Approved Approved Approved By Date By Date By Date Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) ® Ceiling Cover (4020) Approved Approved Approved By Date By Date By Date ❑ Final - Electrical (4055) Approved By 1-0e MECHANICAL ❑ Mechanical Rough -in (4165) 0 Gas Piping (4125) ❑ Final -Mechanical (4065) Approved Approved to release test Approved By Date By Date By Date PLUMBING El Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) 3❑ Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date By Date