23-101139City of Federal Way
Community Development Dept. i
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253)835-2609
Project Name: FOUNTAIN PLAZA II - SUITE 203
Project Address: 501 S 336TH ST
Project Description: Relocate 2 existing thermostats.
Electrical
Permit #:23-101139-00-EL
Inspection Request Line: (253) 835-3050
Parcel Number: 926480 0240
Owner
Applicant
Contractor
RH FOUNTAIN PLAZA ASSOC LLC
VAN DUONGPerformance Mechanical Group
PERFORMANCE HEATING & A/C (EL 06)
PO BOX 5003
1012 CENTRAL AVE S
PERFOHAO05BS (2/01/24)
BELLEVUE WA 98009
KENT WA 98032
1012 CENTRAL AVE S
KENT WA 98032
Additional Permit Information
Is this an Online or O.T.C. application? ................. Yes
Electrical Fixtures
Thermostat 2
PERMIT EXPIRES Wednesday, 30 August, 2023
Permit Issued on Friday, March 3, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: Date:
_4k
CITY of
Federal Way
THIS CARD IS TO RE\IAL\ ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 335-3050
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE TIi:15 C _ARD. Inspections are listed as close to sequential order as possible
(read left to right. top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
ELECTRICAL
❑
UFER Ground (4295)
Q
Ditch cover (4030)
❑
Slab/Concrete Floor (4255)
Approved
Approved
Approved to place concrete
By
Date
By
Date
By
Date
Q
Pool Bonding (4195)
❑ Temporary Power (4275)
❑
Service (4235)
Approved
Approved
Approved
By
Date
By
Date
By
Date
❑
Feeders/Sub-panels (4045)
❑
Rough Electrical (4225)❑
Ceiling Cover (4020)
Approved
Approved
Approved
Bp
Date
By
Date
By
Date
Final - Electrical (4055)
Approved
By
Dater
MECHANICAL
❑
Mechanical Rough -in (4165)
❑
Gas Piping (4125)
❑
Final - Mechanical (4065)
Approved
Approved to release test
Approved
By
Date
By
Date
By
Date
PLUMBING
❑
Plumbing Groundwork (4190)
❑
Rough Plumbing (4230)
❑3
Final - Plumbing (4075)
Approved to cover
Approved
Approved
By
Date
By
Date
By
Date