Loading...
23-102856City of Federal Way Community Development Dept 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: JONES FILE Electrical Permit #:23-102856-00-EL Inspection Request Line: (253) 835-3050 Project Address: 2343 SW 342ND ST Parcel Number: 330630 0520 Project Description: gas furnace and ac replacement / new tstat / new gfci outlet Owner Applicant Contractor JAMAR & DESIREE JONES TAYLER MANNINGPACIFIC HEATING & PACIFIC HEATING & COOLING 2343 SW 342ND ST COOLING (ELECTRICAL) FEDERAL WAY WA 98023 8607 DURANGO ST SW SUITE A PACIFHC798DR (4/12/25) TACOMA WA 98499 8607 DURANGO ST SW SUITE A TACOMA WA 98023 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes Electrical Fixtures Circuits - Residential 3 Thermostat ! PERMIT EXPIRES Tuesday, 28 November, 2023 Permit Issued on Thursday, June 1, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date: CITY or Federal Way THIS CARD IS TO RE--II_A.I\ ON` -SITE Construction Inspection Record INSPECTION REQUESTS: (2153) 335-3050 Scheduled inspections amy be failed if this card is not on -site. DO'NOT LOSE THIS CARD, Inspections are listed as close to sequential order as,possible (read Ieft to right. top to bottom). Please schedule inspections as appropriate. Pork untst not be covered until it is approved. Check With your inspector if you are unsure about any of the inspections or the inspection sequence. on -going inspections are logged on the back of this card. ELECTRICAL ❑ LIFER Ground (4295) ❑ Ditch cover (4030) ❑ Slab/Concrete Floor (4255) Approved Approved Approved to place concrete B� Date By Date By Date ❑ Pool Bonding (4195) ❑ Temporary Power (4275) ❑ Service (4235) Approved Approved Approved By Date By Date By Date ❑ Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) ID Ceiling Cover (4020) Approved Approved Approved By Date By Date By Date I D Final - Electrical (4055) Approved By Dat MECHANICAL ❑ 'Mechanical Rough -in (4165) ❑ Gas Piping (4125) El Final - Mechanical (4065) Approved Approved to release test Approved B`• Date By Date By Date PLUMBING ❑ Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) ❑ Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date BY Date