Loading...
22-103590Electrical FILE_ City or Federal Way _ Permit #.22-103590 00 EL Community Development Dept. 33325 8th Ave S Inspection Request Line: (253) 835-3050 Federal Way, WA 98003 Ph: (253) B35-2607 Fax: (253) 835-2609 Project Name: FEDERAL WAY MIXED USE @ 348TH - BUILDING J Project Address: 34816 1ST AVE S Parcel Number: 912940 0040 Project Description: Wire 1 12 Unit Apartment Building Owner Applicant Contractor X MARKS THE SPOT LLC JON WHITESELEVERGREEN STATE EVERGREEN STATE ELECTRIC INC 2711 WEST VALLEY HWY SUITE 200 ELECTRIC INC EVEROSE0663A (4/l/24) AUBURN WA 98001 2105 W INTER AVE PO BOX 849 PUYALLUP WA 98372 SUMNER WA 98390 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes Electrical Fixtures Feeder: 201 - 400 amps (Multi 1 Feeder: 0 to 200 amps (Multi-f Temp. Service: 101 - 200 amp: 1 12 New Service: 601 - 800 amps ( 1 PERMIT EXPIRES Wednesday, 1 February, 2023 Permit Issued on Friday, August 5, 2022 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: 01\11- Date Uv � REPRINTED / SAX 15 2M CITY of Federal Way THIS CARD IS TO REALAIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 Scheduled inspections mat- be failed if this card is not on -site. DO NOT LOSE TBIS C A.RD. Inspections are listed as close to sequential order as possible (read left to right. top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are iuisure about any of the inspections or the inspection sequence. Chi -going inspections are logged on the back of this card. ELECTRICAL El UFER Ground (4295) ❑ Ditch corer (4030) 0 Slab/Concrete Floor (4255) Approved Approved- Approved to place concrete By Date By Date By Date Pool Bonding (4195) ❑ Temporary Power (4275) Q Service (4235) Approved Approved Approved By Date By Date Date Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) Q Ceiling Corer (4020) Approved Approved Approved By Date B� Date Bj Date J�ual - Electrical (4055) Approved By Dat d �1 �l MECHANICAL 0 Mechanical Rough -in (4165) Approved B} Date Gas Piping (4125) Approved to release test BV Date 0 •Final - Mechanical (4065) Approved By Date PLUMBING El Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) ❑ Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date By Date City of Federal Way I Community Development Dept. E 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: FEDERAL WAY MIXED USE @ 348TH - BUILDING J Project Address: 34816 1ST AVE S Project Description: Wire 112 Unit Apartment Building Electrical Permit #:22-103590-00-EL Inspection Request Line: (253) 835-3050 Parcel Number: 912940 0010 Owner Applicant Contractor X MARKS THE SPOT LLC JON WHITESELEVERGREEN STATE EVERGREEN STATE ELECTRIC INC 2711 WEST VALLEY HWY SUITE 200 ELECTRIC INC EVERGSE066JA (4/1/24) AUBURN WA 98001 2105 W INTER AVE PO BOX 849 PUYALLUP WA 98372 SUMNER WA 98390 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes Electrical Fixtures Feeder: 201 - 400 amps (Multi 1 Feeder: 0 to 200 amps (Multi-t 12 New Service: 601 - 800 amps Temp. Service: 101 - 200 amp! 1 PERMIT EXPIRES Wednesday, 1 February, 2023 Permit Issued on Friday, August 5, 2022 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washin ton and the City of Federal Way. Owner or agent: N L I NJ F' Date: REPRINTED / JAN "L 5 2073 At, CITY OF Federal Way THIS CARD IS TO REMAIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 22 103590 00 Address: 3it/4, 1ST AVE S Bldg J Project: X MARKS THE SPOT LLC FEDERAL WAY WA 98003 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. 0 UFER Ground (4295) 2❑ Ditch cover (4030) Slab/Concrete Floor (4255) Approved Approved Approved to place concrete Date By Date By Date By ® Pool Bonding (4195) ® Temporary Power (4275) Service (4235) Approved Approved By Date Approved I By / By Date LAIDate/� Q Feeders/Sub-panels (4045) ® Rough Electrical (4225) ® Ceiling Cover (4020) Approved Approved �J Approved By Date r �J By Date "," � By Date 10 Final - Electrical (4055) Approved By Date Rough Electrical ElFinal Electrical ❑ Right of Way Approved Approved Approved By Date By Date By Date