Loading...
23-103731Electrical City ofFederal Way Permit #:23-103731-00-EL Community Development Dept. 33325 8th Ave S FILE Federal Way, WA 98003 Inspection Request Line: (253) 835-3050 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: KRUEGER Project Address: 113 SW 299TH PL Parcel Number: 513710 0100 Project Description: ADD/ALTER (2) CIRCUITS - INSTALLING ELECTRICAL TO ODU, FURNACE DISCO/RECO Owner Applicant Contractor RAY KRUEGER MERIDIAN CENTER ELECTRIC MERIDIAN CENTER ELECTRIC INC (01) 113 SW 299TH PL 11109 66TH AVE E MERIDCE318SG (2/28/25) FEDERAL WAY WA 98023-3572 PUYALLUP WA 98373 11109 66TH AVE E PUYALLUP WA 98373 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes Electrical Fixtures No Circuits - Residential 2 Thermostat PERMIT EXPIRES Wednesday, 17 January, 2024 Permit Issued on Friday, July 21, 2023 I hereby certify that the above information is correct and that the construction on thb above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of s ng o and. the City of: Federal Way. Owner or agent: '— . Date: c rrr or ItA Federal Way THIS CARD IS TO RE\I_AIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 335-3050 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS C ARD. Inspections are listed as close to sequential order as possible (read left to right. top to bottom). Please schedule inspections as appropriate Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. ELECTRICAL ❑ By UFER Ground (4295) Approved Date ❑ By Ditch cover (4030) Appra%ed Date ❑ By Slab/Concrete Floor (4255) Approved to place concrete Date Q Pool Bonding (4195) ❑ Temporary Power (4275) ❑ Service (4235) Approved Approved Approved By Date By Date By Date ❑ Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) ❑ Ceiling Cover (4020) Approved Approved Approved By Date By Date By Date Final - Electrical (4055) Approved By f Date ( - MECHANICAL ❑ Mechanical Rough -in (4165) ❑ Gas Piping (4125) Q Final - Mechanical (4065) Approved Approved to release test Approved By Date By Date I By Date PLUMBING ❑ Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) 0 Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date By Date