23-103787City Federal Way
FILE
Communityy Development Dept
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: FAIRWAY 7 TERRACE CONDOMINIUMS; Unit B-9
Project Address: 2810 SW 327TH ST
Project Description: Zinsco panel replacement with new NIB panel
Electrical
Permit #:23-103787-00-EL
Inspection Request Line: (253) 835-3050
Parcel Number: 246950 0090
Owner
Applicant
Contractor
THOMAS GIRVAN
TAYLOR NANCEMAUNA ELECTRIC LLC
MAUNA ELECTRIC LLC
2810 SW 327TH ST #139
17810 110TH STREET CT E
MAUNAEL809CJ (2/11/24)
FEDERAL WAY WA
BONNEY LAKE WA 98391
17810 110TH ST CT E
98023
BONNEY LAKE WA 98391
Additional Permit Information
Is this an Online or O.T.C. application? .................. Yes
Alt. Serv./Feeder: 0 to 200 am]
Electrical Fixtures
PERMIT EXPIRES Sunday, 21 January, 2024
Permit Issued on Tuesday, July 25, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
' gt and h Ci ederal Way.
Owner or agent: � Date:
9 -
{,TV 0,
Federal Warr
THIS CARD IS TO REM_JkI\ ON -SITE
Construction Inspection Record
I\SPECTIO\ REQUESTS: (253) S355-3050
Scheduled inspections ma-: be failed if this card is not on -site. DO NOT LOSE TBI.S CARD. L*spections are listed as close to sequm6al order as possible
(read left to right. top to bottom), Please schedule inspections as appropriate. Work must not be cowered until it is approved. Check with your inspector if
you are unsure about an-..- ofthe inspections or the inspection sequence. On -going inspections are logged on the back of this card.
ELECTRICAL
0
LFER Ground (4295)
❑
Ditch cover (4030)
3❑
Slab/Concrete Floor (4255)
Approved
Approved
Approved to place concrete
By
Date
By
Date
By
Date
❑
Pool Bonding (4195)
❑
Temporary Power (4275)
❑
Service (4235)
Approved
Approved
Approved
By
Date
By
Date
By
Date
Feeders/Sub-panels (404-5)
❑
Rough Electrical (4225)
El
Ceiling Cover (4020)
Approved
Appro;rd
Approved
B`°
Date
By
Date
By
Date
El
Final - Electrical (4055)
Approved
Bv
Datei
MECHANICAL
❑ Mechanical Rough -in (4165) ❑ Gas Piping (4125) Q -Final - Mechanical (4065)
Approved Approved to release test :approved
B� Date By Date By Date
PLUMBING
❑ Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) 0 Final - Plumbing (4075)
Approved to cotter Approved Approved
By Date By Date By Date