Loading...
23-103787City Federal Way FILE Communityy Development Dept 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: FAIRWAY 7 TERRACE CONDOMINIUMS; Unit B-9 Project Address: 2810 SW 327TH ST Project Description: Zinsco panel replacement with new NIB panel Electrical Permit #:23-103787-00-EL Inspection Request Line: (253) 835-3050 Parcel Number: 246950 0090 Owner Applicant Contractor THOMAS GIRVAN TAYLOR NANCEMAUNA ELECTRIC LLC MAUNA ELECTRIC LLC 2810 SW 327TH ST #139 17810 110TH STREET CT E MAUNAEL809CJ (2/11/24) FEDERAL WAY WA BONNEY LAKE WA 98391 17810 110TH ST CT E 98023 BONNEY LAKE WA 98391 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes Alt. Serv./Feeder: 0 to 200 am] Electrical Fixtures PERMIT EXPIRES Sunday, 21 January, 2024 Permit Issued on Tuesday, July 25, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of ' gt and h Ci ederal Way. Owner or agent: � Date: 9 - {,TV 0, Federal Warr THIS CARD IS TO REM_JkI\ ON -SITE Construction Inspection Record I\SPECTIO\ REQUESTS: (253) S355-3050 Scheduled inspections ma-: be failed if this card is not on -site. DO NOT LOSE TBI.S CARD. L*spections are listed as close to sequm6al order as possible (read left to right. top to bottom), Please schedule inspections as appropriate. Work must not be cowered until it is approved. Check with your inspector if you are unsure about an-..- ofthe inspections or the inspection sequence. On -going inspections are logged on the back of this card. ELECTRICAL 0 LFER Ground (4295) ❑ Ditch cover (4030) 3❑ Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date ❑ Pool Bonding (4195) ❑ Temporary Power (4275) ❑ Service (4235) Approved Approved Approved By Date By Date By Date Feeders/Sub-panels (404-5) ❑ Rough Electrical (4225) El Ceiling Cover (4020) Approved Appro;rd Approved B`° Date By Date By Date El Final - Electrical (4055) Approved Bv Datei MECHANICAL ❑ Mechanical Rough -in (4165) ❑ Gas Piping (4125) Q -Final - Mechanical (4065) Approved Approved to release test :approved B� Date By Date By Date PLUMBING ❑ Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) 0 Final - Plumbing (4075) Approved to cotter Approved Approved By Date By Date By Date