22-105078r t.
r t
r Electrical
City ofFeder
opment FILE
Permit #:22-105078-00-EL
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003 Inspection Request Line: (253) 835-3050
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: CABRERA
Project Address: 5333 SW DASH POINT RD Parcel Number: 321020 0341
Project Description: New electrical installation throughout the house
Owner
Applicant
Contractor
JESUS CABRERA
JESUS CABRERA
OWNER
17104 163RD PL
17104 163RD PL
OWNER
RENTON WA 98058
RENTON WA 98058
Additional Permit Information
Is this an Online or O.T.C. application?........... ....... Yes
Electrical Fixtures
Circuits - Residential 14 Low Voltage - Fire Alarm (Re; 1 Outbuilding/ Garage - Sep. Ins 1
New Service: Residential 1 Temp. Service: 101 - 200 amp! 1 Thermostat 1
Yard Pole Meter Loop 1
PERMIT EXPIRES Wednesday, 3 May, 2023
Permit Issued on Friday, November 4, 2022
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: 0Date:
Appl�coL�k- 1�.S�Co�
Sr}�e
CITYCIF
Federal Way
PERMIT #: 22 105078 00
THIS CARD IS TO REMAIN ON -SITE
Construction Inspection Record
INSPECTION RE, QU ESTS: (253) 835-3050
Address: 5333 SW DASH POINT RD
Project: JESUS CABRERA FEDERAL WAY WA 98023
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE TILLS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
0
UFER Ground {4295
Q
Ditch cover (4030)
Slab/Concrete Floor (4255)
Approved
Approved to place concrete
By47KAppprrjved
b'
By
Date
By
Date
0
Pool Bonding (4195)
0
Temporary Power (4275)
0
Service (4235)
Approved
Approved
I
By
� Approved
Date r 6/
By
Date
By
Date
] Feeders/Sub-panels (4045)
Q Rough Electrical (4225)
°� Ceiling Cover (4020)
pproved
proved
Approved
By Date�p{i/�I y
By eT,. Date r�"r
By Date
Final - Electrical (4055)
4 Approved �
By Datevo4
Rough Electrical
Final Electrical
Right of Way
Approved
Approved
Approved
By
Date
By
Date
By
Date
i� CITY
Way
OF
Building Division
3332.5 Eighth<Avenue South
Federal Way, WA 98003-6325
Phone 253-835-2607 Fax 253-835-2609
CORRECTION NOTICE
IF YOU HAVE QUESTIONS CALL
(253) 835-
WHEN CORRECTIONS HAVE BEEN MADE, CALL (253) 835-3050 FOR RE -INSPECTION. SEE BACK OF CARD
FOR DETAILS. NOTE: ELECTRICAL CORRECTIONS ARE REQUIRED TO BE MADE WITHIN 15 DAYS.
_'- ��l
DATE
INSPECTOR
DO NOT REMOVE THIS NOTICE
Page of
1Federal Way
A '
Building Division
33325 Eighth Avenue South
Federa�Way, WA 98003-6325
Phone 253-835-2607 Fax 253-835-2609
CORRECTION NOTICE
ADDRESS:. ✓���� ��� �� ��/'PERMIT#:
IF YOU HAVE QUESTIONS CALL
(253) 835-
WHEN CORRECTIONS HAVE BEEN MADE, CALL (253) 835-3050 FOR RE -INSPECTION. SEE BACK OF CARD
FOR DETAILS. -NOTE: ELECTRICAL CORRECTIONS ARE REQUIRED TO BE MADE WITHIN 15 DAYS.
!.
DATE INSPECTOR
DO NOT REMOVE THIS NOTICE
Page of