Loading...
23-102265Electrical City of Federal Way Permit #:23-102265-00-EL Community Development Dep4 FILL 33325 8[h Ave S Federal Way, WA 98003 Inspection Request Line: (253) 835-3050 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: MCANALLOY Project Address: 29816 MARINE VIEW DR SW Parcel Number: 515320 0116 Project Description: We will be installing a circuit for a ac unit outside and we will run Thermostat wire from ac unit to furnace. Owner Applicant Contractor GEOFFERY Z MCANALLOY ANATOLIY KOSIUKCHIEFTAN ELECTRIC CHIEFTAIN ELECTRIC LLC 29816 MARIVE VIEW DR SW 8321 266TH ST E CHIEFEL772C2(2/22/25) FEDERAL WAY WA GRAHAM WA 98338 8321 266TH ST E 98023 GRAHAM WA 98338 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes Electrical Fixtures Circuits - Residential 1 Thermostat 1 PERMIT EXPIRES Tuesday, 24 October, 2023 Permit Issued on Thursday, April 27, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the;City of Federal Way. Owner or agent: [ Date: CITY w Federal Way THIS CARD IS TO REALM\ O's-SITE Construction Inspection Record I\SPEC'TION REQITSTS. (253) 835-3050 Scheduled inspections mar be faiW if this card is not oa-site. DO NOT LOSE TB18 C=kRD. Iuspecttons are: listed as close to sequeural order as possible (read left to riebt. top to bottom). Please schedule inspecUons as appropriate. Work must not be covered until it is approved. Check with your k4-ecror if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. ELECTRICAL ❑ UFER Ground (4295) ❑ Ditch cover (4030) Q Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date El Pool Bonding (4195) ❑ Temporary Power (4275) ❑ Sen•ice (4235) Approved Approved Approved By Date By Date By Date ❑ Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) ❑ Ceiling Cover (4020) Approved Approved Approved By Date By Date BS Date 0 Final - Electrical (4055) Approved By Date MECHANICAL ❑ Mechanical Rough -in (4165) Gas Piping (4125) 0 •Final - \lechanical (4065) Approved Approved to release test Approved By Date By Date By Date PLUMBING 0 Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) 0 Final - Plumbing (4075) Approved to crner Approved Approved By Date By Date BY Date