23-103910Electrical
Cityof Federal Way
FILE
Permit #:23 103910 00 EL
Community Development Dept.
33325 Sth Ave S
Federal Way, WA 98003
Inspection Request Line: (253) 835-3050
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: HEALY
Project Address: 513 SW 302ND ST
Parcel Number: 039580 0030
Project Description: Septic pumping system and 2 additional circuits
Owner
Applicant
Contractor
SEAN & LAKIONSHA HEALY
DAVE HUDSONCLS SEPTICS
COLUMBIA LAND SERVICES INC
513 SW 302ND ST
PO BOX 127
(ELECTRICAL)
FEDERAL WAY WA 98023
RAVENSDALE WA 98051
COLUMLS771CN(2/9/25)
PO BOX 127
RAVENSDALE WA 98051
Additional Permit Information
Is this an Online or O.T.C. application? ...............
Yes
Electrical Fixtures
Circuits - Residential 2
PERMIT EXPIRES Saturday, 27 January, 2024
Permit Issued on Monday, July 31, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: KI I I N1 P Date
_�k
CITY ow
Federal Way
THIS CARD IS TO RE\I_AI\ ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 835-3050
Scheduled inspections ma.; be failed if this card is not on -site. DO \ OT LO.SL IHI.S CARD. L+tspectiom are listed as close to sequential order as possible
(read leis to right. top to bottom). Please schedule inspections as appropriate 'Work nntst not be covered until it is approved. Check with yowr inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
ELECTRICAL
❑
L'FER Ground (4295)
❑
Ditch corer (4030)
®
Slab/Concrete Floor (4255)
Approved
Approved
Approved to place concrete
By
Date
By
Date
By
Date
❑
Pool Bonding (4195)
❑
Temporary Power (4275)
❑
Service (4235)
Approved
Approved
Approved
By
Date
By
Date
By
Date
❑
Feeders/Sub-panels (4045)
❑
Rough Electrical (4225)
Q
Ceiling Cover (4020)
Approved
Approved
Approved
By
Date
By
Date
By
Date
Final - Electrical (4055)
By
X/Approved
Date ,�
MECHANICAL
r El
By
-Mechanical Rough -in (416S)
Approved
Date
❑
By
Gas Piping (4125)
Approved to release test
Date
Q
By
Final -Mechanical (4065)
Approved
Date
PLUMBING
Plumbing Groundwork (4190)
0
Rough Plumbing (4230)
❑
Final - Plumbing (4075)
Approved to cover
Approved
Approved
By
Date
By
Date
BY
Date