23-102855City of Federal Way
Community Development Dept
FILE
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: JONES
Project Address: 2343 SW 342ND ST
Project Description: gas furnace and ac replacement
Mechanical
Permit #:23-102855-00-ME
Inspection Request Line: (253) 835-3050
Parcel Number: 330630 0520
Owner
Applicant
Contractor
JAMAR & DESIREE JONES
TAYLER MANNINGPACIFIC HEATING &
PACIFIC AIR SYSTEMS (GENERAL)
2343 SW 342ND ST
COOLING
PACIFAS093KA (9/8/23)
FEDERAL WAY WA 98023
8607 DURANGO ST SW SUITE A
12811 PACIFIC HWY SW
TACOMA WA 98499
LAKEWOOD WA 98499
Additional Permit Information
Mechanical Work Valuation?......... ......................... 12462 Is this an Online or O.T.C. application?.................. Yes
Mechanical Fixtures
Air Conditioners - Stand Alont 1 Furnaces 1
PERMIT EXPIRES Tuesday, 28 November, 2023
Permit Issued on Thursday, June 1, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washing(op and toe qty: ef:Federal Way.
J.
Owner or agent: b Date:
r
CITY or f
Federal Way
THIS C A-RD IS TO REALAI\ ON` -SITE
Construction Inspection Record
I\SPECTION REQUESTS: (253) 335-30-50
Scheduled inspections ",ry be failed if this card is not on -site. DO -NOT LOSE MS CARD. Inspections are listed as close to sequential order as possible
(read Ieft to right. top to bottom), Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with -your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
ELECTRICAL
❑
LrFER Ground (4295)
a❑
Ditch cover (4030)
❑
Slab/Concrete Floor (42-55)
Approved
Approved
Approved to place concrete
B}
Date
By
Date
By
Date
❑
Pool Bonding (4195)
❑
Temporary Power (4275)
❑
Service (4235)
Approved
Approved
Approved
By
Date
By
Date
By
Date
❑
Feeders[Sub-panels (4045)
❑
Rough Electrical (4225)
❑
Ceiling Cover (4020)
Approved
Approved
Approved
B-;•
Date
By
Date
By
Date
Final - Electrical (4055)
Approved
By
Date
MECHANICAL
❑ -Mechanical Rough -in (4165) ❑ Gas Piping (4125) Q Final - Mechanical (4065)
Approved Approved to release test Approved
B`- Date By Date By AA Date
PLUMBING
❑ Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) ❑ Final - Plumbing (4075)
Approved to cover Approved Approved
By Date By Date BY Date