Loading...
23-101663City of Federal Way Community Development Dept. SAve S ; FILE-] Federalal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: COLEMAN Project Address: 1725 S 376TH ST Project Description: (3) Bathrooms Plumbing Permit #:23-101663-00-PL Inspection Request Line: (253) 835-3050 Parcel Number: 721265 0770 Owner Applicant Contractor ROBERT COLEMAN TARYN SEARSRENEWAL REMODELS & PARRETTA PLUMBING & ROOTER LLC 1725 S 376TH ST ADDITIONS (PLUMBING) FEDERAL WAY WA 98003-7575 14110 E CANYON RD E PARREPR799NR (8/17/23) PUYALLUP WA 98373 23008 161ST AVE E GRAHAM WA 98338 Plumbing Fixtures Bathtubs 1 Lavatories 5 Showers 1 Water Closets 3 PERMIT EXPIRES Saturday, 30 September, 2023 Permit Issued on Monday, April 3, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: i`• Date: CITY or '{ Federal Way THIS CARD IS TO REALM\ O\-SITE Construction Inspection Record I\SPECTIO\ REQUESTS: (253) 33_5-30_50 Scheduled inspections mad° be failed if this card is not on -site. DO NOT LOSE THIS C kRD. Inspections are listed as close to sequential order as possible (read left to right. top to bottom). Please schedule inspections as appropriate. work must not be covered until it is approved. Check with vote inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. ELECTRICAL ❑ LIFER Ground (4295) ❑ Ditch cover (4030) ❑ Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date Pool Bonding (4195) ❑ Temporary Power (4275) 0 Service (4235) Approved Approved Approved By Date By Date By Date ❑ Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) ❑ Ceiling Cover (4020) Approved Approved Approved By Date By Date By Date E 3 Final - Electrical (4055) Approved By Date MECHANICAL Mechanical Rough -in (4165) Q Gas Piping (4125) Q Final - Mechanical (4065) Approved Approved to release test Approved By Date By Date Bv Date PLUMBING ❑ Plumbing Groundwork (4190) 0 Rough Plumbing (4230) Q Final - Plumbing (4075) Approved to cover Approved Approved By Date By G Date 2lz� By � Date g