Loading...
23-103727Mechanical City of Federal Way Community Development Dept. FILE Permit #.23-103727-00-ME 33325 8th Ave S Federal Way, WA 98003 Inspection Request Line: (253) 835-3050 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: HO Project Address: 34307 13TH CT SW Parcel Number: 640370 0370 Project Description: like for like furnace replacement and like for like hot water tank replacement Owner Applicant Contractor HIEN HO LUCINDA HONEYCUTTBOB'S HEATING BOB'S HEATING & A/C INC (PLUMBING) 34307 13TH CT SW & A/C INC' BOBSHHA796RD (11/12/23) FEDERAL WAY WA 98023-7070 14148 190TH ST NE 14148 NE 190TH ST WOODINVILLE WA 98072 WOODINVILLE WA 98072 Additional Permit Information Mechanical Work Valuation?....... ... :..... ............ 9000 Is this an Online or O.T.C. application?.................: Yes Mechanical Fixtures Furnaces I Hot Water Tanks 1 PERMIT EXPIRES Wednesday, 17 January, 2024 Permit Issued on Friday, July 21, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and th-. use will be in accordance with the laws, rules and regulations of the State of Washljhgtoq a9d tp4-£ity of Federal Way. Owner or agent: '' l Date: CITY o1 Federal Way THIS C -kRD IS TO REAI_AIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 335-3050 Scheduled inspections ntav be failed if this card is not on -site. DO NOT LOSE TMS CARD. Inspections are listed as close to sequential order as possible (read left to right. top to bottom). Please schedule inspections as appropriate. Work nntst not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence_ On -going inspections are logged on the back of this card_ ELECTRICAL ❑ By LTFER Ground (4295) Approved Date ❑ By Ditch cover (4030) Approved Date ❑ By Slab/Concrete Floor (4255) Approved to place concrete Date ❑ By Temporarn Poorer (4275) Approved Date ❑ Bv Service (4235) Approved Date 0 Pool Bonding (4195) Approved By Date El By Feeder JSab-panels (4045) Approved Date ❑ By Rough Electrical (4225) Approved Date ❑ By Ceiling Cover (4020) Approved Date Final - Electrical (4055) Approved By Date MECHANICAL ❑ '_Mechanical Rough -in (4165) ❑ Gas Piping (4125) ❑3 -Final - -Mechanical (4065) Approved Approved to release test Approved By Date By Date By J �/ Date I �� PLUMBING ❑ Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) 0 Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date B3- Date