Loading...
23-103189Mechanical FILE Permit #.23-103189 00 ME City of Federal Way Community Development Dept. 33325 8th Ave S Inspection. Request Line: (253) 835-3050 Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: RISE Project Address: 29921 4TH AVE SW Parcel Number: 720500 0070 Project Description: RISE 158394866 - FURNACE SWAP Owner Applicant Contractor SAMUEL & ALLISON RISE JENAH BARLOWMM COMFORT HOME COMFORT ALLIANCE 29921 4TH AVE SW SYSTEMS (GENERAL) FEDERAL WAY WA 98023 18103 NE 68TH ST SUITE C-200 HOMECCA785BD (1/4/24) REDMOND WA 98052 18103 NE 68TH ST SUITE C-200 REDMOND WA 98052 Additional Permit Information Mechanical Work Valuation?.. 3500 Is this an Online or O.T.C. application? .................. Yes Furnaces Mechanical Fixtures PERMIT EXPIRES Sunday, 17 December, 2023 Permit Issued on Tuesday, June 20, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of W.ashin ton and the City of Federal Way. Owner or agent: Date: -4k CITY of Federal Way THIS CLRD IS TO REALAIN ON -SITE Construction Inspection Record I\SPECTT01 REQUESTS: (253) 835-3050 Scheduled inspections my be failed if this card is not oa-site_ DO NOT LOSE TFUS CARD. Inspections are listed as close to sequential order as possible {read left to right. top to bottonl). Please schedule inspections as appropriate. IVork nutrst not be covered until it k, approved. Cbeck 1sith your inspector if you are unsure about any of the inspection or the inspection sequence. Chu -going inspections are logged on the back of this card. ELECTRICAL ❑ LIFER Ground (4295) Approved By Date u By Ditch toyer (4030) Approved Date ❑ Slab/Concrete Floor (4255) Approved to place concrete By Date ❑ Pool Bonding (4195) ❑ Temporary Power (4275) ❑ Service (4235) Approved Approved Approved By Date By Date By Date ❑ Feeders/Sub-panels (404' ❑ Approved By Date B`- ED Final - Electrical (4055) Approved By Date ❑ Mechanical Rough -in (4165) Approved By Date t❑ Plumbing Groundwork (4190) Approved to cover By Date Rough Electrical (4225) Approved Date MECHANICAL ❑ Gas Piping (4125) Approved to re]ease test By Date PLUMBING 0 Rough Plumbing (4230) Approved By Date ❑ Ceiling Cover (4020) Approved By Date Q Final -Mechanical (4065) Approved By ^ � � Date -7 A ❑ Final - Plumbing (407-5) Approved BY Date