Loading...
14-102980CITY OF . Federal July 24, 2014 John Parsaie Morgan Design Group LLC 11207 Fremont Avenue North Seattle, WA 98133 Way CITY HALL "'LE 33325 8th Avenue South Federal Way, WA 98003-6325 (253) 835-7000 www.cityoffederalway.com RE: File #14-102980-00-PC; PREAPPLICATION CONFERENCE SUMMARY Federal Way Senior Living, Federal Way Dear Mr. Parsaie: Thank you for participating in the preapplication conference with the City of Federal Way's Development Review Committee (DRC) held July 10, 2014. We hope that the information discussed at that meeting was helpful in understanding the general requirements for your project as submitted. This letter summarizes comments given to you at the meeting by the members of the DRC. The members who reviewed your project and provided comments include staff from the City's Planning and Building Divisions, Public Works Department, representatives from Midway Sewer District and Highline Water District and South King Fire and Rescue. Some sections of the Federal Way Revised Code (FWRC) and relevant information handouts are enclosed with this letter. Please be advised, this letter does not represent all applicable codes. In preparing your formal application, please refer to the complete FWRC and other relevant codes for all additional requirements that may apply to your project. The key contact for your project is Stacey Welsh, 253-835-2634, stacey.welsh@cityoffederalway.com. For specific technical questions about your project, please contact the appropriate DRC representative as listed below. Otherwise, any general questions about the preapplication and permitting process can be referred to your key contact. PROJECT DESCRIPTION Applicant proposes to construct an affordable senior living community with approximately 197 residential units along with 118 parking stalls, as well as indoor and outdoor community recreation spaces. The project will consist of a single building, 5 stories of Type VA over one level of Type IA plus partial basement. Site improvements such as parking and landscaping are also proposed. MAJOR ISSUES Outlined below is a summary of the major issues of your project based on the plans and information submitted for preapplication review. These issues can change due to modifications and revisions in the plans. These major issues only represent comments that the DRC consider most significant to your project and do not include the majority of the comments provided. The major issues section is only provided as a means to highlight critical requirements or issues. Please be sure to read the entire department comments made in the next section of this letter. Mr. Parsaie: July 24, 2014 Page 2 • Public Works Development Services Division o The project site lies within a Flood Problem Flow Control Area; therefore, surface water runoff control will be required to meet the Level 3 Flow Control requirements of the 2009 King County Surface Water Design Manual (KCSWDM) and the City of Federal Way Addendum to the 2009 KCSWDM. o It is uncertain, at this level of review, whether or not it will be possible to utilize the existing stormwater detention pond for this project. The pond provides detention for 3 of the adjacent, previously developed parcels that lie to the west of this site, and was designed under different criteria than is required for this project. While the pond may not currently provide an adequate level of detention required for this project, it may be possible that it can be re -configured in order to provide the necessary flow control. o Assuming the project meets the thresholds necessary to require water quality treatment, the existing pond does not provide an adequate level of water quality protection that is required for this project. o The City has the original Technical Information Report (TIR) that was used for the design of the detention/water quality pond, and a copy of this report can be made available to the applicant's civil engineer. Contact the Development Services Division representative, listed below, to obtain a copy. o A stormwater system development charge will be required based on the amount of new impervious area draining in to the City of Kent. The current 2014 rate is $0.838648/sf of new impervious area. The amount of impervious area is to be documented via detailed calculations (TIR/Storm Report). Coordination for collection and payment details of this charge is yet to be determined. ■ Public Works Traffic Division o A Transportation Concurrency permit is required per FWRC Chapter 19.90. o Traffic Impact Fee (TIF) payment per FWRC 19.91. o Street frontage improvements and right-of-way (ROW) dedication along the property frontage on S 272nd Street may be required. DEPARTMENT COMMENTS Outlined below are the comments made by the representatives of each department present at the preapplication conference. Each section should be read thoroughly. If you have questions, please contact the representative listed for that section. PLANNING DIVISION (Stacey Welsh, 253-835-2634, stacey.welsh@cityoffederalway.com) 1. Zoning Designation and Use — The subject property is within the Community Business (BC) zone. Senior Citizen Housing is a permitted use in the BC zone subject to regulations set forth in FWRC 19.220.080. 2. Land Use Application — The proposed affordable senior housing project is subject to Use Process III review pursuant to FWRC 19.220.080. Process III land use review is conducted administratively, with a written decision issued by the Director of Community Development following review. Process III land use approval is valid for a period of five years and extensions to the land use approval may be granted if criteria are met. Per FWRC 19.15.045, vesting occurs at the time the 14-102980 Doc LD. 65926 Mr. Parsaie July 24, 2014 Page 3 Process III application is determined to be complete. Enclosed are a master land use application, development requirements checklist, and other applicable handouts. Refer to the Development Requirements checklist, Bulletin #014, for specific submittal requirements. State Environmental Policy Act (SEPA) — The project is subject to environmental review under SEPA for the proposed actions: development of more than 20 dwelling units; construction of a new building greater than 12,000 square feet; and parking lots with more than 40 parking spaces. The environmental review is a component of the Process III land use application and a complete environmental checklist with notice materials will be required. The city does utilize the optional DNS notice procedures for applications that include a SEPA checklist. The optional DNS process allows a combined project and anticipated environmental determination public notice period that expedites the overall land use application process. An environmental threshold determination made by the Director of Community Development must be issued prior to land use or building permit approval. 4. Public Notification — Process III applications and SEPA determinations require a public notice and 14-day comment period. Within 14 days of issuing the Letter of Complete Application, a Notice of Application and Optional DNS will be published in the Federal Way Mirror, mailed to persons within 300 feet of the subject property, posted on the subject property, and placed at the City's three designated notice boards. Land Use Review Timeframes — The city makes every effort to issue land use decisions within 120 days of a complete application. However, the review timeframe is suspended at any time that additional information is requested by the city. The applicant must submit requested information within a 180-day timeframe, unless an extension is granted pursuant to FWRC 19.15.050(2). 6. Application Fees — Please contact the Permit Center at 253-835-2607 for updated fee schedules for Process III Master Land Use application, SEPA checklist, concurrency, engineering review, and building permit. 7. Key Development Regulations — All site improvements must comply with the applicable FWRC development regulations. The following general regulations will apply to the proposal. (a) Required Yard and Lot Coverage — Required yards for senior citizen housing is 0 foot front and 5 feet side and rear yards. No maximum lot coverage applies. The buildable area will be determined by other requirements for landscaping, required yards, etc. (b) Maximum Building Height —The height allowed is 65 feet above average building elevation (ABE). Average building elevation is defined in the zoning code as follows: FWRC 19.05.010(A) Definitions: "Average building elevation (ABE) " means the average of the highest and lowest existing or proposed elevations, whichever is lowest, taken at the base of the exterior walls of the structure, or it means five feet above the lowest of the existing or proposed elevations, whichever is lowest. ABE is the elevation from which building height is measured. FWRC 19.110.060 Exceptions. The following modifications apply to the height limitations of this title: 14-102990 Doc. I.D. 65926 Mr. Parsaie July 24, 2014 Page 4 (1) Unless otherwise provided in subsections (2) and (3) of this section: (a) Rooftop appurtenances may exceed the applicable height limitation by a maximum of four feet, if the area of all appurtenances and screening does not exceed 10 percent of the total area of the building footprint. These appurtenances must be located in such a way as to minimize view blockage. (b) Appurtenances that do not meet the standards of subsection (1) (a) of this section may be permitted using process I if the director determines that, based on accurate graphic representations provided by the applicant, views from adjacent properties will not be significantly affected. (c) Any appurtenance, other than chimneys and antennas, must be screened from all streets and nearby properties. See FWRC 19.110.070. FWRC 19.110.070 Rooftop appurtenances —Required screening. (1) Generally. Except as specified in subsection (2) of this section, vents, mechanical penthouses, elevator equipment and similar appurtenances that extend above the roofline must be surrounded by a solid sight -obscuring screen that meets the following criteria: (a) The screen must be integrated into the architecture of the building. (b) The screen must obscure the view of the appurtenances from adjacent streets and properties. (2) Exemptions. The following shall be exempted from the provisions of this section: (a) Rod, wire and dish antennas allowed under FWRC 19.110.060 are exempt from the requirements of this section, if the screening would interfere with the effective operation of the antenna. (b) A painted appurtenance is exempt from the requirements of this section if the director of community development determines that painting will be as effective in minimizing rooftop clutter as would a solid sight -obscuring screen. Additionally, under FWRC 19.220.080 (notes #1 & 2), rooflines must be designed to avoid a predominantly flat and featureless appearance through variations in roof height, forms, angles, and materials. Building height may not exceed 30 ft. above ABE for the portion of the building located within 20 ft. of a residential zone. The property located to the east is zoned residential (RM 1800). (c) Parking — Required parking is 0.5 parking spaces per dwelling unit. The plan depicts 197 residential units; a total of 99 spaces are required. The proposal is for structured parking with 37 spaces on the P-1 level and 81 spaces on the L-1 level of the multi -story building. See enclosed code section for dimensional requirements for parking stalls. (d) Open Space — Under FWRC 19.220.080 (note #5), open space requirements for senior citizen housing is determined on a case -by -case basis. With your application, please provide a written description of those areas intended as recreational open space. Include on submittal drawings the size and location of each recreation area, the intended users, and indicate whether it is internal or external. 8. Clearing, Grading, and Tree and Vegetation Retention — The Process III application must include a clearing and grading plan consistent with FWRC 19.120.040(1). Clearing and grading plans are reviewed and approved in conjunction with land development permit associated with the 14_102990 Doc. I.D. 65926 Mr. Parsaie July 24, 2014 Page 5 proposed development. Approval and Notice to Proceed shall be required prior to commencing clearing and grading activities on the site. Reference FWRC 19.120.060(2). A tree and vegetation retention plan as required under FWRC 19.120.040(2) must also be submitted with the Process III application. The tree and vegetation retention/replacement plan must be prepared by a certified arborist or certified landscape architect. The standards require each development to maintain a minimum tree unit density. The minimum tree density in the BC zone is 20 tree units per acre. The subject property's density would be 50 tree units (20 tree units x 2.52 acres). A tree unit is a value assigned to existing trees retained on the property or replacement trees. The larger the tree, the greater value it is assigned. Required tree density can be composed of retained trees and replacement plantings per FWRC 19.120.130. (Note: required landscaping trees may be counted in tree density). The tree and vegetation plan must clearly show where the 50 tree units are to be located. The formal landscape plan must detail information about tree unit credits and replacement. If an applicant cannot provide for the minimum tree units per acre on site, off -site mitigation or fee - in -lieu payment to the city's urban forestry account may be approved by the director. See FWRC 19.120.140 for off -site mitigation and fee -in -lieu payment requirements. Landscaping - The Process III application must include a preliminary landscape plan, prepared by a licensed landscape architect, in accordance with the landscape requirements contained in FWRC Chapter 19.125 "Outdoors, Yards, and Landscaping. " Following are the key landscape requirements for the project. (a) Perimeter Landscape Buffers — Type III perimeter landscape buffers a minimum of five feet in width are required along all property lines. Type III landscaping shall be a mixture of evergreen and deciduous trees interspersed with large shrubs and groundcover. Tree, shrub, and groundcover spacing shall be appropriate for the species type, and the intent of the code section. (b) Type I landscaping 15 feet in width shall be provided along the perimeter of property abutting a residential zoning district, which in this case is the east property line. Type I landscaping consists of evergreen trees, large shrubs and groundcover, which will provide a 100 percent sight -obscuring screen within three years from the time of planting; or a combination of approximately 75 percent evergreen and 25 percent deciduous trees, with an allowable five percent variance; with large shrubs, and groundcover backed by a 100 percent sight -obscuring fence. Tree, shrub, and groundcover spacing shall be appropriate for the species type, and consistent with the intent of the code section. Per FWRC 19.125.100., any proposed landscape modifications will be reviewed and decided upon in conjunction with Process III. A request for a landscape modification must include a written narrative of how the proposal meets the applicable modification criteria. 10. Community Design Guidelines — Review of the proposal under the city's design guidelines, FWRC Chapter 19.115, is required for the project and will occur in conjunction with the Process III decision. The principal applicable guidelines for the project are noted below. However, this does not necessarily include all applicable guidelines, and project designers must consult the guidelines in their entirety in preparing an application. The application must include a written narrative identifying how the proposal complies with the applicable design guidelines, as detailed. 14-102980 Doc I D 65926 Mr. Parsaie July 24, 2014 Page 6 a. FWRC 19.115.010(2) CPTED — Implement Crime Prevention through Environmental Design (CPTED) principles to reduce opportunities for criminal activities to occur. The city's Police Department and Planning Division will evaluate the formal application and review for compliance with CPTED principles. Special consideration to incorporate principles to all pedestrian routes of travel, courtyard or plaza areas, and the parking garage is strongly encouraged. A completed CPTED checklist must be submitted with your application. i. Natural Surveillance — Promote visibility of public spaces and areas. ii. Access Control — Identify techniques that deter unauthorized access and/or inappropriate access. iii. Ownership — Reduce perception of areas as ownerless. b. FWRC 19.115.050 Site Design — Refer to all sections of this chapter for site design standards. Key sections include: i. (1) General Criteria (b), (c), (d), (e), (f), and (g) ii. (3) Parking Structures (a), (b), (c), (d), (e), (f), (g) and (h) iii. (4) Pedestrian Circulation and Public Spaces (a), (b), (c), (e) and (f) 1. (b) Pedestrian pathways and pedestrian areas should be delineated by separate paved routes using a variation in paved texture and color, and protected from abutting vehicle circulation areas with landscaping. iv. (5) Landscaping v. (7) Miscellaneous (a) c. FWRC 19.115.060 Building Design — Key design requirements of this section apply to the project as follows. Note that the requirements of this section apply to the north, west and east sides of the building. i. (2) All building facades that are both longer than 60 feet and are visible from either a right-of-way or residential use must incorporate a minimum of two out of four design options intended to break up the mass of large buildings. These design options include fagade modulation, landscaping, canopy or arcade, and associated pedestrian plazas. ii. (3) Building facades shall also include methods of articulation and accessory elements, for example display windows, window openings with visible trim material, vertical trellis, artwork, decorative masonry or metal patterns or grillwork, relief, material variations, etc. d. FWRC 19.115.070 Building and Pedestrian Orientation — Design requirements of this section apply to the project as follows: (1) (a-c). e. FWRC 19.115.090(1) District Guidelines for BC — Key design requirements of this section apply to the project (FWRC 19.115.090(1)(b)-(r)). i. FWRC 19.115.090(I)(p): Building facades that exceed 120 feet in length and are visible from an adjacent residential zone, right-of-way, public park, or recreation area shall incorporate a significant structural modulation (offset). The minimum depth of the modulation shall be approximately equal to 10 percent of the total length of the subject facade and the minimum width shall be approximately twice the minimum depth. The modulation shall be integral to the building structure from base to roofline. [This applies to the east and west facades.] 14-102980 Do4 LD. 65926 Mr. Parsaie July 24, 2014 Page 7 ii. FWRC 19.115.090 Subsections (1)(g) through (r) apply to residential uses. Please provide a design narrative with the formal application to detail how the senior housing project addresses these requirements. 11. Garbage and Recycling Receptacles — FWRC 19.125.150 requires that storage areas for garbage and recycling receptacles be provided for each project and contain design guidelines and space requirements. The site plan depicts a trash room. The formal application must note the specific size and location of each facility. Locations for the recycling and garbage facilities must be depicted on the formal site plan. Include the square,footage of each facility provided, depict routes of travel for staff and service providers, including vertical clearance and turning radius of each. 12. Affordable Units — Five percent of new dwelling units, in this case 10 units, must be considered affordable as defined by FWRC 19.110.010. "Affordable units" for rental affordable housing means dwelling units that are offered for rent at a rate that is affordable to those individuals and families having incomes that are 50 percent or below the median county income. The formal application must reflect the affordable housing requirement and provide details of how it will be accomplished. Note that prior to issuance of a certificate of occupancy for any building, an agreement in a form approved by the city requiring affordable dwelling units to remain as affordable housing for the life of the project must be recorded with the King County Department of Records and Elections at the expense of the applicant. 13. School Impact Fees — School impact fees are required for multi -family residential dwelling units. However, housing units for the elderly are exempt from school impact fees pursuant to FWRC 19.95.060(1)(a) so long as these uses are maintained in perpetuity and the necessary covenants or declarations of restrictions are recorded on the property to ensure that no children will reside in the development. Please include a statement as to how you will meet this requirement with the formal application. PUBLIC WORKS DEVELOPMENT SERVICES DIVISION (Kevin Peterson, 253-835-2734, kevin.peterson@cityoffederalway.com) Land Use Issues — Stormwater Surface water runoff control and water quality treatment will be required per the 2009 KCSI9'DM and the City of Federal Way Addendum to the manual. This project meets the requirements for a Full Drainage Review. At the time of land use submittal, a preliminary Technical Information Report (TIR), addressing the relevance of the project to the eight core and five special requirements of the KCSWDM will be required. A Level 1 downstream analysis shall also be provided in the preliminary TIR. 2. The project lies within a Flood Problem flow control area. The applicant must design the flow control facilities and Best Management Practices (BMP's) to meet the performance criteria outlined in the KCSWDM for these areas. 3. Water quality treatment will be required for all pollution -generating impervious surfaces. Treatment options must be selected from the Enhanced Basic Water Quality Menu provided in the KCSWDM. 14-102980 Doc. LD. 65926 Mr. Parsaie July 24, 2014 Page 8 4. Soil logs prepared by a licensed geotechnical engineer or septic designer must be provided to verify infiltration suitability. 5. Detention and water quality facilities are required to be above ground (i.e. open pond). Underground facilities are allowed only with approval from the City of Federal Way Stormwater Management Division. 6. Show the proposed location and dimensions of the detention and water quality facilities on the preliminary plans. 7. . If more than one acre will be disturbed during construction, a National Pollutant Discharge Elimination System (NPDES) permit may be required. Information regarding this permit can be obtained from the Washington State Department of Ecology at http://www.egy.wa.gqvlprogi-ams/sea/pac/index.litml, or by calling 360-407-6437. Right -of -Way Improvements See the Traffic Division comments from Eric Preston, Sr. Traffic Engineer, for traffic related items. 2. Stormwater treatment and detention requirements that would apply to any street improvements within the S 272nd St right-of-way will be regulated by the City of Kent. Building (or EN) Permit Issues 1. Engineered plans are required for clearing, grading, road construction, and utility work. Plans must be reviewed and approved by the City. Engineering review fees are $824.50 for the first 12 hours of review, and $68.00 per hour for additional review time. A final TIR shall be prepared for the project and submitted with the engineering plans. Both the TIR and the plans will require the signature/seal of a professional engineer registered/licensed in the State of Washington. 2. The Federal Way Development Standards Manual (including standard detail drawings, standard notes, and engineering checklists) is available on the City's website at www.cil3Loffederalway.com to assist the applicant's engineer in preparing the plans and TIR. 3. The applicant shall provide a geotechnical report that addresses design pavement thickness for the roadways. 4. Bonding is required for all street and storm drainage improvements associated with the project. The bond amount shall be 120 percent of the estimated costs of the improvements. An administrative fee deposit will need to accompany the bond to cover any possible legal fees in the event the bond must be called. Upon completion of the installation of the improvements, and final approval of the Public Works Inspector, the bond will be reduced to 30 percent of the original amount and held for a two- year maintenance period. 5. The developer will be responsible for the maintenance of all storm drainage facilities (including the detention and water quality facilities) and street systems during the two-year maintenance period. During that time, the Public Works Inspector will make periodic visits to the site to ensure the developer's compliance with the maintenance requirements. Upon satisfactory completion of the two-year maintenance period, the remainder of the bond will be released. Maintenance for public 14-102980 Doe_ I.D. 65926 Mr. Parsaie July 24, 2014 Page 9 roads and subdivision drainage facilities then become the responsibility of the City. Maintenance for private roads and drainage facilities, including short plats, remain the responsibility of the individual property owners. 6. When topographic survey information is shown on the plans, the vertical datum block shall include the phrase "DATUM: N.G.V.D.-29" or "DATUM: K.C.A.S.," on all sheets where vertical elevations are called out. 7. Drawings submitted for plan review shall be printed on 24" x 36" or 22" x 34" paper. All final approved drawings shall be drafted/plotted on 24" x 36" or 22" x 34" mylar sheet with permanent black ink. Site plans shall be drawn at a scale of 1" = 20', or larger. Architectural scales are not permitted on engineering plans. 8. Provide cut and fill quantities on the clearing and grading plan. Erosion control measures, per Appendix D, 2009 KCSWDM, must be shown on the engineering plans. 9. The site _plan shall show the location of any existing and proposed utilities in the areas affected by construction. PUBLIC WORKS TRAFFIC DIVISION (Erik Preston, PE, 253-835-2744, eri k. D recto nCa..citvoffedera lway. com) Transportation Concurrency Analysis (FWRC 19.90) l . Based on the submitted materials for 197 units of Senior Housing, the Institute of Transportation Engineers (ITE) Trip Generation - 8t' Edition, land use code 252 (Senior Adult Housing — Attached), the proposed project is estimated to generate approximately 32 new weekday PM peak hour trips. Alternatively, the applicant may submit a site specific trip generation study for the proposed development. 2. A concurrency permit is required for this development project. The PW Traffic Division will perform concurrency analysis to determine if adequate roadway capacity exists during the weekday PM peak period to accommodate the proposed development. Please note that supplemental transportation analysis and concurrency mitigation may be required if the proposed project creates an impact not anticipated in the six -year Transportation Improvement Plan (TIP). The estimated fee for the concurrency permit application is $1,584.50 (11 - 50 Trips). This fee is an estimate and based on the materials submitted for the preapplication meeting. The concurrency application fee must be paid in full at the time the concurrency permit application is submitted with land use application. The fee may change based on the new weekday PM peak hour trips as identified in the concurrency trip generation. The applicant has the option of having an independent traffic engineer prepare the concurrency analysis consistent with City procedures; however, the fee remains the same. Transportation Impact Fees (TIF) (FWRC 19.91) • Senior Housinj — Based on the submitted materials for 197 units of Senior Housing, the estimated traffic impact fee is $155,047.59. Please note, the actual impact fee will be calculated based on the fee schedule in effect at the time a building permit application is filed and must be paid prior to permit issuance. 14-102980 Doc. I.D. 65926 Mr. Parsaie July 24, 2014 Page 10 Street Frontage Improvements (FWRC 19.135) 1. Based on the available records, the street frontage on S 272nd Street is located within the City of Kent. Therefore, the City of Federal Way can only advise the applicant of possible street frontage improvements and right-of-way dedication that may be required. 2. The applicant may be required to construct frontage improvements and/or dedicate additional right- of-way (ROW) to accommodate future improvements (if any) as identified by the City of Kent that may be a condition of SEPA approval. The shared access driveway entrance on S 272nd Street may be required to be improved to meet current ADA standards if no other improvements are required. Misc. Safety Related Comments The application should be forwarded to King County METRO for any transit requirements. City of Kent Comments and Coordination The City of Kent currently has no interlocal agreement with the City of Federal Way that would allow the City of Kent to collect additional traffic impact fees. 2. The City of Kent may pursue pro-rata mitigation for planned projects per RCW 82.02.02 as a -condition of SEPA approval. The City of Kent must demonstrate that the mitigation request is "reasonably necessary" and a "direct result" of the development by demonstrating an LOS failure with this project. We recommend that the applicant work with the City of Kent to come to an agreement on the proper fee and/or mitigation. Once complete, the City of Federal Way can review the agreement and provide a recommendation. 4. The City of Kent has the following comments: Transportation - S 272nd is classified as a Minor Arterial with Bike Lanes which requires 47' of ROW from centerline. - Project W-18 on City of Kent TMP calls for HOV lanes on S 272nd from Military to Pac Hwy. This results in an additional 14' of ROW on the south side for a total ROW of 61' from CL. (May be reduced to 59'.) - ROW dedication will be required. - Improvements to S 272nd will likely be limited to replacement of driveway to meet ADA and current City of Kent Standards. - Improvements in S 272nd will require a permit from Kent. We recommend a separate Pre-App with Kent to review specifics. Access to 272nd limited to right-in/right-out. - Transportation Impact Fees will be required. Current 2014 rate is $4,277.73 per PM Peak trip to Kent. Trips to be based on traffic study. 14-102990 Doc I D 65926 Mr. Parsaie July 24, 2014 Page 11 Storm - Stormwater system development charge will be required based on amount of new impervious area coming to Kent. This charge is in addition to typical flow control and water quality treatment requirements. Current 2014 rate is $0.838648/sf of new impervious area. Amount of impervious area to be documented via detailed calculations (TWStorm Report). BUILDING DIVISION (Scott Sproul, 253-835-2633, scott.s roul ci offederaiwa .cam International Building Code (IBC), 2012 Washington State Amendments WAC 51-50 International Mechanical Code (IMC), 2012 Washington State Amendments WAC 51-52 Uniform Plumbing Code (UPC), 2012 Washington State Amendments WAC 51-56 & WAC 51-57 International Fire Code (IFC), 2012 Washington State Amendments WAC 51 -54 National Electric Code (NEC), 2014 Accessibility Code ICC/ANSI Al 17.1-2006 International Residential Code 2012 Washington State Amendments WAC 51-51 Washington State Energy Code 2012 WAC 5 1 -11 Building Criteria Occupancy Classification: R-2 Type of Construction: IA and VA Number of Stories: Six stories Fire Protection: fire sprinkler system required on all buildings 5000 sq ft or larger and fire alarm system on buildings 3000 sq ft or larger. Wind/Seismic: Basic wind speed 110 Mph, Exposure B , 25# Snow load, Seismic Zone D-1 A complete building permit application and commercial checklist. (Additional copies of application and checklists may be obtained on our web site at: www.cityoffederalwgy.com .) Submit 5 sets of drawings and specifications. Specifications shall include: 2 Soils report 14-102980 Doc I D 65926 Mr. Parsaie July 24, 2014 Page 12 2 Structural calculations 2—Energy calculations 2 Ventilation calculations. Note: A Washington State Registered architects stamp is required for additions/alterations (new or existing) of 4,000 gross floor area or greater unless specifically listed as an "exempt" structure per the Revised Code of Washington (RCW). Energy code compliance worksheets are required to be completed and included with your permit application. A wet stamp and signature is required on all sheets of plans and on the cover page of any calculations submitted. Federal Way reviews plans on a first in first out basis; however, there are some small projects with inconsequential review requirements that may be reviewed out of order. This building might be required to be reviewed by a third party. This is an additional cost above the building permit fee. Review Timing The first comment letter can be expected within 8 to 10 weeks of submittal date. Re -check of plans will occur in one to three weeks after re -submittal. Revised or resubmitted plans shall be provided in the same format, size, and amount as the originally submitted plans. Revised/resubmitted drawings shall indicate by means of clouding or written response, what changes have been made from the original drawings. Plans for all involved departments will be forwarded from Community Development Services. Other Permits & Inspections Separate permits required for electrical, fire suppression systems, and signs. Applicants may apply for separate permits at any time prior to commencement of construction. When required, special inspections shall be performed by WABO approved agencies or by agencies approved by the building official prior to permit issuance. Construction must be approved by all reviewing departments prior to final building division inspection. All concerned departments (Planning, Public Works, Electrical, Fire) must sign off before the Building Department can final the structure for occupancy. Building final must be approved prior to the issuance of a Certificate of Occupancy. All construction projects may be required to have a pre -construction conference. If a pre -con meeting is required, all subs, the general or representative, the architect or representative, the engineer or representative, electrical contractor and any other interested party, should attend this meeting. Meetings will occur at the Building Department and will be scheduled by the inspector of record for the project. Site -Specific Requirements • Please note that electrical code changed as of July 1, 2014. There are significant changes for each type of occupancy. Make sure your electrical contractor is aware. • Apply for separate permits from Labor and Industries for the elevators. • Apply for separate permits from King County Health Department for any food service. 14-102980 Doc. LD. 65926 Mr. Parsaie July 24, 2014 Page 13 Proposed occupancy is only for an assisted living service group R occupancy, and not for persons who are incapable of self-preservation, which is a group I. Yes; the city does recognize the Washington State Amendment regarding increase in height for R- 2's. The information provided is based on limited plans and information. The comments provided are not intended to be a complete plan review and further comments are possible at time of building permit plan review. HIGHLINE WATER DISTRICT (Polly Daigle, 206-592-8924, pdaigle@highlinewater.org) The project owner or representative needs to contact our office for a Certificate of Water Availability. The cost for a commercial certificate is $150.00. MIDWAY SEWER DISTRICT (Brock Powell, 206-824-4960, brock@midwaysewer.org) • The multi -family unit base rate is 80% of the single family unit base rate gfc. The current multi- family charge is $3120/unit. • Drains in the parking garage will need to have an oil/water separator. • No garbage disposals are permitted. • There appears to be plenty of capacity in the system. • Connect on site; project does not have to connect on 272aa SOUTH KING FIRE AND RESCUE (Chris Ingham, 253-946-7244, chris.inizham(a southkingfire.org} The required fire flow for this project is 4000 gallons per minute for type VA construction and 3000 gallons per minute for type IIIA construction. A Certificate of Water Availability shall be provided indicating the fire flow available at the site. A hydraulic fire flow model shall be requested from the water district. This project will require 3 or 4 fire hydrants depending on the construction type. There are 5 existing fire hydrants available for this project. This includes the two hydrants on the adjacent property. Fire apparatus access roads shall be provided when any portion of the facility or any portion of an exterior wall of the first story of the building is located more than 150 feet from fire apparatus access as measured by an approved route around the exterior of the building or facility. An access easement agreement shall be obtained from the adjacent property to the east for fire apparatus access or modify the site plan to meet fire access requirements. In addition, a gate in the fence shall be provided for access to the east side of the building. Locking devices shall be approved by the fire department. 14-102980 Doc I D. 65926 Mr. Parsaie July 24, 2014 Page 14 An automatic fire sprinkler system shall be installed in all occupancies where the total floor area included within the surrounding exterior walls on all floor levels, including basements, exceeds 5,000 square feet. Fire walls shall not be considered to separate a building to enable deletion of the required automatic fire - extinguishing system. The system demand pressure (to the source) required in a hydraulically designed automatic fire sprinkler system shall be at least 10 percent less than the correlative water supply curve pressure. A Class I standpipe system is required in buildings where the floor level of the highest story is located more than 30 feet above the lowest level of the fire department vehicle access. Buildings four or more stories in height shall be provided with not less than one standpipe for use during construction. Such standpipes shall be installed when the progress of construction is not more than 40 feet (12 192mm) in height above the lowest level of fire department access. Such standpipe shall be provided with fire department hose connections at accessible locations adjacent to usable stairs. Such standpipes shall be extended as construction progresses to within one floor of the highest point of construction having secured decking or flooring. Where elevators are provided in buildings four or more stories above grade plane, at least one elevator shall be provided for fire department emergency access to all floors. The elevator car shall be of such a size and arrangement to accommodate a 24-inch by 84-inch ambulance stretcher in the horizontal position. A Fire Alarm System is required. An automatic fire detection system shall be installed in all buildings exceeding 3,000 square feet. gross floor area. This fire detection system shall be monitored by a central and/or remote station conforming to the current requirements of the National Fire Protection Association standards and/or the fire chief or designee. CLOSING This letter reflects the information provided at the preapplication meeting and is intended to assist you in preparing plans and materials for formal application. We hope you found the comments useful to your project. We have made every effort to identify major issues to eliminate surprises during the City's review of the formal application. The completion of the preapplication process in the content of this letter does not vest any future project application. Comments in this letter are only valid for one year as per FWRC 19.40.070(4). As you know, this is a preliminary review only and does not take the place of the full review that will follow submission of a formal application. Comments provided in this letter are based on preapplication materials submitted. Modifications and revisions to the project as presented for this preapplication may influence and modify information regarding development requirements outlined above. In addition to this preapplication letter, please examine the complete FWRC and other relevant codes carefully. Requirements that are found in the codes that are not addressed in this letter are still required for your project. 14-102980 Doc, LD 65926 Mr. Parsaie July 24, 2014 Page 15 If you have questions about an individual comment, please contact the appropriate department representative noted above. Any general questions can be directed towards the key project contact, Stacey Welsh, 253-835-2634. We look forward to working with you. Sincerely, Stacey Welsh, AICP Associate Planner enc: Master Land Use application Process III Submittal Requirements Environmental Checklist Mailing Labels handout Parking Lot Design Criteria CPTED checklist and handout Concurrency Application c: Kevin Peterson, Engineering Plans Reviewer Erik Preston, Senior Traffic Engineer Scott Sproul, Assistant Building Official Chris Ingham, South King Fire and Rescue Polly Daigle, Highline Water District, PO Box 3867, Kent, WA 98032-0367 Brock Powell, Midway Sewer District, PO Box 3487, Kent, WA 98032 14-102980 Doc. iD. 65926 CITY OF FEDERAL WAY DEVELOPMENT REVIEW COMMITTEE (DRC) Preapplication Conference Sign -In Sheet NAME Bw. 0 C_ V- U . ?O uj E L` Federal Way Senior Living 14-102980-00-PC, July 10, 2014 WITH PHONE 2OG Asa 4 t 4 "1 S- M�D 70 FW7r'CS—�� P(,) _ Stn�ccs 253- S3S- Z-7 �►-, !-�. sue, sf�,�s, -f-� Ae,��,r��►,w�` c _ ��6 -AI �-If 8g$ a tI CITY OF FEDERAL WAY DEPARTMENT OF COMMUNITY DEVELOPMENT SERVICES DEVELOPMENT REVIEW COMMITTEE TRANSMITTAL DATE: 6-24-14 TO: Ann Dower, Development Services Rick Perez, Traffic Scott Sproul, Assistant Building Official Brian Asbury, Lakehaven Utility District Chris Ingham, South King Fire & Rescue FROM: Stacey Welsh, Associate Planner FOR DRC MTG. ON: 7-3-I4 - Internal 7-10-14 9:00 - with applicant FILE NUMBER(s): 14-102980-00-PC RELATED FILE NOS.: None PROJECT NAME: FEDERAL WAY SENIOR LIVING PROJECT ADDRESS: *NO SITE ADDRESS* ZONING DISTRICT: BC PROJECT DESCRIPTION: Proposed affordable senior living community with approximately 197 residential units along with 118 parking stalls, as well as indoor and outdoor community recreational spaces. The project will be comprised of a single building, 5 stories of Type VA over over one level of Type lA plus partial basement. LAND USE PERMITS: Pre -Application Conference PROJECT CONTACT: MORGAN DESIGN GROUP LLC JOHN PARSAIE 11207 FREMONT AVE N SEATTLE WA 98133 MATERIALS SUBMITTED: Master Land Use App., narrative, conceptual drawing 40k CITY Federalo, Way RECEIVED MASTER LAND USE APPLICATION J U N 2 4 2014 DEPARTMENT OF COMMUNITY DEVELOPMENT SERVICES 33325 8`h Avenue South CITY OF FEDERAL WAY Federal Way, WA 98003-6325 CDS 253-835-2607; Fax 253-835-2609 www.cityoffederalway.com APPLICATION NO(S) ! [ V ���D —CO 7`, Project Name Federal Way Senior Living Property Address/Location 27400 Pacific Highway South Parcel Number(s) 872992-0040 Date 06/20/2014 Project Description proposed affordable senior living community with approximately 197 residential units along with 118 parking stalls, as well as indoor outdoor community recreational spaces, I he project will be comprised 01 a single building, 5 stories of Type VA over one level of Type IA plus partial basement. PLEASE PRINT Type of Permit Required Annexation Binding Site Plan Boundary Line Adjustment Comp Plan/Rezone Land Surface Modification _ Process H (Site Plan Review) X Process III (Project Approval) Process IV (Hearing Examiner's Decision) Process V (Quasi -Judicial Rezone) _ Process VI X SEPA w/Project SEPA Only Shoreline: Variance/Conditional Use Short Subdivision Subdivision Variance: Commercial/Residential Required Information BC Zoning Designation BC Comprehensive Plan Designation $100,000 Value of Existing Improvements $20MIL Value of Proposed Improvements International Building Code (IBC): R-2, S-2, B, A Occupancy Type VA over IA Construction Type Applicant Name: John Parsaie / Morgan Design Group LLC Address: 11207 Fremont Ave N City/State: Seattle, WA 98133 Zip: Phone: 206-375-3397 Fax: 866-847-6420 Email: ohn ntorgan-design.net Signature: - Agent (if different than Applicant) Name: Address: City/State: Zip: Phone: Fax: Email: Signature: Owner Name: BALDRIDGE - FEDERAL WAY, L.L.C. Address: c/o Harold A. Tzinberg, Esq. City/State: Stinson, Leonard, Street LLP Zip: 7700 Forsyth Blvd., Suite 1100 Phone; St. Lois, MO 63105 314-719-3046 Fax: 314-259-3970 Email: hal.tzinberg@srinsonleanard.com ftnatr���_ Tfa� vim �. Bulletin #003 — January 1, 2011 Page 1 of 1 k:UIandouts\lvlaster Land Use Application t M ORGAN DESIGN GROUP LLC June 19, 2014 11207 Fremont Ave N Seattle, WA 98133 Tel: 206 375-3397 Fax: 866 847-6420 www.morgan-design.net City of Federal Way JUN 2 0 2014 Department of Community and Economic Development CITY OF FEDERAL WAY 33325 — 8" Avenue South CDS Federal Way, WA 98003 RE- 27400 Pacific Highway South - Federal Way, WA (Parcel # 8729920040) Pre -application Conference 5ubmittal Contents I . Project Narrative 2. Zoning Analysis 3. Specific Pre -Application Questions 4. Master Land Use Application (Attached) 5. Pre -application Conference Form (Attached) G. Preliminary Plans (Attached) Project Narrative The 5ubJect property 15 approximately 2.52 acres (109,7 13 5.f.). The 5lte 15 situated along the south 51de of 5 272nd Street, north of the Redondo heights Park and Ride, and east of retail facilities along Pacific highway South. Currently the 51te 15 vacant, undeveloped land. The legal site address 15 27400 Pacific Highway South. The proposed project 15 a housing community for seniors with various income levels, comprl51ncj of approximately 157 residential unit5 a 6-5tory elongated "C"-shaped building. The building will con515t of one and half 5torle5 of Type IA Construction contalning structured parking facilitie5 and residential amenitles, and, 5 stories of type VA con5tructlon containing residential unit5 and incidental uses. 51te access 15 afforded via an exl5ting driveway easement between the site and the retail e5tabll5hment5 to the west, from 5 272nd Street to the park and ride. A re5ldentlal lobby entrance 15 provided along 5 272nd Street. Additional means of egress have been provided to walkways along the east and west sides of the building. A total of 118 parking stalls are proposed for thl5 project. Common area amenitle5 will include an active lobby with 5eatin6J area, library/business center, fitness center, hobby room, game room, media center with home theater, and a 50clal room with Architectural Design • Building Envelope Consulting kitchenette. Outdoor amenities will include the private landscaped courtyards, seating areas, and a rooftop deck containing a dog run area and pea patch gardens for the tenants. 2. Zoning Analysis The entire site 15 currently zoned Community Business (BC). Pursuant to Section 10.220.080, senior housing 15 allowed outright with Process II or Process III review with SEPA. Required setbacks have been exceeded as we have set the building back at least 20 feet on all sides (a minimum of 5 feet at the side and rear yards 15 required). Along street frontage (S. 272"d Street), the proposed structure 15 set back 30' . Open space is provided in front of the building along S 272nd Street as well as in the courtyard on 2"d floor and rooftop areas of the building. The proposed development 15 consistent with the BC Zone Specific Guidelines in terms of building modulation, material selection, and reduction of bulk and mass in accordance with applicable FWRC Sections. Additionally, the proposed development will provide pedestrian paths from ROW to each entry point and all around the buildings. Furthermore, in an effort to provide a safe and secure environment for the residents, employees, and guests, wall- and ground -mounted light fixtures are provided. Per Chapter 19.220.080, 0.5 parking stalls are required per unit. This project provides 1 18 stalls for 197 units, a ratio of approximately 0.G stalls per unit. The building will be equipped with trash chute and trash compactor inside the building. Additionally, the building will be protected throughout with an approved fire -suppression system. 3. Specific Pre -application Questions In addition to receiving standard pre -application review and guidance to the project approach, the applicant requests responses to the following specific questions: a. Are permitting processes similar to our other project, Celebration Senior Living Apartments or are there different or additional processes required? b. What are process times for each application at this time? C. How 15 building height measured for this site? This is important as we had to redefine how the building was measured from a land -use standpoint as well as building for our Celebration project. d. What are the current impact fees for traffic mitigation? C. Is Transportation Concurrency Analysis required for this project? f. Are there reduced impact fees available for low-income projects? MDG 272nd & Pac Highway Pre-app Letter 2014.06.19 2 �I 9. Is this site affected by an onsite of offsite critical area? h. Does the city recognize Washington Amendments to the IDC regarding increased height for R-2 use in Type VA construction in lieu of using the City's Type VA Construction requirements? i. What are the requirements of Fire Department in terms of fire flow capacity for both Type VA and Type IIIA construction? j. Are we required to install new fire hydrants? If so, how many? k. How many curb cuts are permitted for this site? I. Are there any prohibited ingress/egress routes from this project? m. Are there any street improvements planned or anticipated? n. What offsite mitigation, if any, will be required? o. Does the available water system have sufficient pressure and capacity? F. Is sanitary system capable of handling expected outflow? q. What are detention requirements for this site? Can we utilize the existing detention pond for discharge? r. What impact and/or connection fees can be expected for this proposal with respect to the utilities? s. Is there a ROW dedication required? We look forward to receiving your comments at the pre -application meeting. Do not hesitate to contact the undersigned if you have questions or require additional information regarding this proposal. Sincerely, MORGAN DESIGN GROUP LLC H. John Parsaie, Assoc. AIA, CSI Vice President MDG 272nd & Pac Highway Pre-app Letter 2014.06.19 k M ORGAN DESIGN GROUP LLC — 'n .,.._.. _. .^ „....-.....0 � Architecture € Building w �_„„_ •.. Envelope Consulting 11207 Rff-t Ave N .r'• .� J Souk,WA 98133 _ Tel: 206-375-3397 �� �„•,-f ` % - fax: 966-947-6420 wmv wrgan,*siganet S �•^" ..� ••~ ^� rM .,. i Corporate Memberof ALA. Joe: 2014009 50100 ry a<rN sa l aos{ e 1 e 1 _ l 3 '- f[ 1 5/ II r= O LU m -- m Q¢ COMMUNITY ROOF DECK ---- - 1j O J 3 3 7,450 s.F. L>_J a LLJ ... LN I.— N F I` I4• �, er wv+r _ ---- -- - - • --r,� -- �+�c�. — i .dry t i. r 4i �, r r ... rr. .. .. .. �.Iwrm .�. .. ..... .. ter•- .. -. \ 307-10 5/8" 5 2G8TH STREET N n1 N Q w a C = � 1T In 5 272ND STREET S h r PARK 4 D 5 275TH PL sJ °7 5 27GTH 57 27GTH PL fS277T. IL NORTH VICINITY MAP 5CALE: N,T,5. PROJECT INFORMATION: PROJECT NAME: FEDERAL WAY 5ENIOR LIVING 51TE ADDRE55: 272 4 PACIFIC HIGHWAY 50UTH FEDERAL WAY, WA LOT AREA: 109.G22 5.F (2.52 ACRE5) ZONING: BC - BU51NE55 COMMUNITY CONSTRUCTION TYPE: 5 5TORIE5 TYPE V-A OVER I STORY TYPE I -A ABOVE GRADE 15TORY TYPE I -A BELOW GRADE OVERALL UNIT COUNT: I BEDROOM UNITS: 103 UNIT5 - (52%) 2 BEDROOM UNIT5: 94 UNIT5 - (48%) 197 UNIT5 TOTAL PARKING STALL BREAKDOWN: 5TANDARD 52E 5TALL5 101 5TALL5 - (8G%) COMPACT 51ZE 5TALL5 12 5TALL5 - (10%) BARRIER FREE 5TALL5 5 5TALL5 - (4%) 115 5TALL5 TOTAL (GOV 37 - PARKING 5TALL.5 - P-I LEVEL 81 - PARKING 5TALL5 - L- I LEVEL 1 18 - PARKING STALL5 TOTAL (GO%) SITE PLAN o SCALE: I a o' 100, O 50' 159 BUILDING STATISTICS LEVEL P-1: 17,730 5Q.FT. LEVEL 1: 45,114 5Q.FT. LEVEL 2: 32.134 5Q.Ff. LEVEL 3: 32.059 5Q.Ff. LEVEL 4: 32,089 5Q.FT. LEVEL 5: 32,089 5Q ,FT. LEVEL G: 31,872 5Q.FT. ROOF DECK: 1,133 5Q.FT. 224.250 5Q.FT. PARKING: 50,44G 5Q.FT. CIRCULATION: 34.153 5QFT. COMMUNITYAREA: G.4055Q.FT. MECHANICAL/ 5TG: 5,725 5Q.FT. OFFICE: G255QFT. RE5IDENTIAL: 12G,890 5Q IT. 224,250 5Q FT, COMMUNITY DECK: 8,843 5QFf. SUN DECK: 19G 5Q.FT. ROOF DECK: 7,450 5Q.FT. TOTAL DECK AREA: I G,489 5Q.FT DRAWING INDEX: A-0, I 51TE PLAN 4 PROJECT INFORMATION A- I .0 P- I E L-I FLOOR PLAN5 A- I. 1 L-2 6 L-3 - L-5 FLOOR PLAN5 A- I .2 L-G E ROOF DECK PLAN A-2.0 ELEVATION5 A-3.0 5ECTION "A -A" Rv,Cvr ED JUG! 2 01 NA4 Cm OF FEDERAL NNAY C'DS 0: IS .�. �rT�yru�KieMeYYi�. SHEET TITLE: 51TE PLAN E PROJECT INFORMATION w06/20/14 r nr susMnra 1 eal DATE REVISION 11 WSCALE: 7'.90-e DRAWN: JM DESIGN: JM ZAPPROVED: JM 0 SHEETM is A-0. I LYE D412144VOND . . . ... ..... .. ....... ... ... .. ............. ...... ... . .. . ...... .. ....... .... L- I LEVEL PARKING: FT 33 08 5Q.. CIRCULATION: 2:5199 5Q.fT. COMMUNITY AREA: 4,000 5Q.FT. MECHANICAL/ 5TG: 3,819 5Q. FT. OFFICE: G28 5Q.fT. TOTAL AREA: 45,1 14 5QfT. F- I LEVEL PARKING: 17,338 50-FT. CIRCULATION: 392 SQ.Fr. TOTAL AREA: 17,730 5Q.FT L- I FLOOR PLAN 5CALE: 1 '=50-0" ,51-0' �_ 25'-G" 251-01 M" %5LOPEup ., to P- I PARK G PLAN 5CALE: I 25' 1 OCY 0 50' 150' L-2 LEVEL CIRCULATON:• COMMUNITY 191 • e i raA • • � •l sf 7r ri A��I■� Ce+Ri+ ,77 •� .t all I o, ! er1[r1�!a'� .. i • K • !f r � � 7T �.�� r,'ara s..: �r ai l�n /: ": '>a�:l: �•. /a la,1g'w :rT.T'riSri /,/ ■y 1,i 1 L .. -!�� a.e Cc • -. P �.: �_■ �I^ — h� 1`�_�fl[����—'n fF3i;. 1" ��a. J� f•!� i+� � •P--��" RE 1a. ': • s i ■ ! jy"'■,.,._ ■F,f �' .- ' y.. �/e„ � n r�}.• /i- I f41 �wi_ -11\ •N- �6*1— A,� ■% TI n -" ill ■.:� ■�/ r.�q{ w � ■ a 1 t iFry L-2 FLOOR PLAN 5CALE: I "=50'-0" 9 - 1 eIR UNT5 9 - 2 8R UNT5 38 UNIT5 THI5 LEVEL „ �114 7 � Fia • / � rt • I"/'/� . �1 ;►�N 1 � ! �fi� � � tit _ 1 t [�.ar .�....-...■_ _lp+e +11-•- �I". �:.�=ram 7T T" _ i:!' �} rT 1_. T-:�x.•: ,yr T Tom' . .lr� _ I .TT'"� -sx. !�� ��■ J L�'y* v�i �*:i �:J L � •� � •� �1f �4/ e�vMi�% ,�.url " i t1 i- ' _JL_ • rfll/'� Imo_ - x�1154:• �•. Ln JI:y1r . �•+j�=� is .F7A■>:i 0 N0 its i/�Yi •i �:.: fri 'ir�;e A� i n•:. ari!ii,:/■ - 1ii ■ °� n�- Eu-=1 �■ yr- `-_ err, I.a ■�/ rt• - r -rTy• 7'1-GS ITC�Ci'[ itIII hew i.:--� �� ^- r -S r.:.r I 1 Iw —yii�"��'-" 1� •I��Y—',OI _••__- __ L Eg LOOP, - M ORGAN DESIGN GROUP LLC Architecture € Building Errvebpe Consulting 11207 F1a-A Ave N Seattle, WA 90133 Tel: 206-375-3397 Fox 966-847-6420 www.mo[gan-design.net Corporate Member of A.I A. 1 JOB: 20140091 SHEET TITLE: L-2 LEVEL - LEVEL 5 FLOOR FLANS 06/20/14 PP.E AP5UBMnI DATE REVISION J =ate: De31Q1IXi0UP I5 Pap11Ufr®YmHOUr O MORE Oe5 ROUP F ILDATE 09M&14 WSGLE P-SO-0 .DRAWN- JM OE9t6Fi JM 7- APPROVED: JM DSHEETq If A-I.I L-G LEVEL ` RE5IDENTIAL; 24,998 5Q.FT. / CIRCULATION: 5,935 5Q.Ff, MEGHANIGAL/ STG: 382 SQ.Ff. I I IN I L-G FLOOR PLAN 5CALE: 1 "=50'-a' II ROOF DECK CIRCULATION: 1,133 5Q.Ff. TOTAL AREA: 31,572 5Q.Ff. � j r 1! DECK AREA: 7,450 5Q.FT.. I COMMUNITY ROOF DECK A*7,450 s.r, ROOF DECK PLAN 5CALE: I "=50-0" 25' 100, 21 - I BR UNITS 18 - 2 8R UNITS 39 UNIT5 THI5 LEVEL 0 70' 1 5fl MORGAN DESIGN GROUP LLC Architecture IS Building Envelope Consulting 11207 Frame Aw N Seattle, WA 99133 Tel: 206-375-3397 Fac 666-947-6420 www.mmgan design n. Corporate Member of A.IA I JOB: 20140091 UI z_ J fZ 0 z LLJ (!7 Q m JQ¢ 33 �=a L1LLJ3 �N. 1LNF rn. rs>Vr taobr nue r SHEET TITLE: LEVEL G FLOOR # ROOF DECK PLAN N09/20/14 PRE � sU-rrrr DATE REVISION J�Pw� se oPms uuwwc wuPsmarrertenwnNour Oa011 MGiroI1P DATE OWIWI4 WsrxE r'-50- • JM D: JM FPR 01 .2 some la!■■IIRRI■■■■i■■I = 1:;1Ii1■■111l11::r111ff ='_ ■!i !1lwrrNRrr[rilErrE 1::1111■■11l11rp;!<iAA 1! Rai ! r• wtr l Ni l i �R [i ■ Nir kirrr■iirrirri■ 1'■1111■■111l11--11 fA 1=*= ■ ■r-------- ■a 011,101 li1RW■■■Ill mall■■Ilion [l■1■R■■■■1 rawr��rnr ■ira��rli[ - - .—��r[wsllwirlril=NN=_raw 111■■■ri11 • � � r� ME."111111MOMU_■ M. rim r!1• r 3� liw��wl� �! Eiiil rir = e riaesrriisri[k=_�sw� IIA■■111fi11 ',r111111111::1r11'■■: iiifi■i:iii ■ao= sirw[riwrii�s:=iiice 1r11w■�■lw■�■l<iINl➢■ M:i:No :wr�' irirlwlrN l lii■■■rI1F 1wRwrawewiraii;rr• -Ill■l!■■l■.■■�r�:■�, rrNs•I�arli _-- — kwl4 all r■1 rrrr !sl Alter 1 I 1 goal ■■iiiiriiiF�■■■■■■■l■■E—Erlia■r■-■■■■■■■■�l■Rlliiii■■■riiiilli■■■lG ::fll1!■!#I1::11::1111111lIII:1=11.=llzfl;:ll;;llli■!Ii■:plliill:■■#A ■Er=i•rrlr�rR�rErriEr!!!�■=NNE■N=l�rr...�rrrir•silr�rrwRlr_l�iNr. Mil ! [FI k! rw ii [ ■ i rl it [ rii lwrll wit = r N � ■ ■ s 1rR� Rwlrkri rrr� w! [ ri r rr1 E tilt =i r � ::r111■II IIi111::111[Iii1[■i;111=1A=r::11::1111■!il■::11111■:■11a ■[i�il■M.i A...r[M12, Ew�w=w#=i1=l�i�■"ail ili�ilwNE11— ==_` �w[rrwri■■iiiw•rrwEifwitS T 1i 02-51Eirw rw[wr 01li■rrAA^w-Mc ii■111�1i11;"ll1::111iIiIIIr::1=11i11■:11■;I11!■111r;;1111ir:■r'IIn ■awR�rilrr.iN�ilwwwlwr[l�r=ram■N R�rr_rrRi�ilEr_r0GFMEN �irrr�lrw■tiara!srrilrll11ireNN�NN=riwrirrrrl�rlErir[iirrir=wN 1:11l1■ 1# Il::lr�:li 1iflfilAlr::1=11- 11■::11■:1111■ AI'■::IIIiI■##■3[1= i[rr�rrlw�wR�rsrrrErrl+—rcxwl wry:—..—rsri�rrE =—�rwr"r —:,ire I�filrrrrrrlririillrwi lwR :Nr=rN_ Iwrwwrrl !ii[ MOM :r11i■111riir i■11#11111� ii ill--O 'fl ■; j11■1#I 1@ 11if ■1 = �wliiilrM.. lrirli _ li�il !if f.-- ;,T��(v •� ,lW,.wA. �� :�'t•�r-.. krrrlr !iA ii1 iii AAA kril ;y`>��'.c[k . w. :,1: rr �Jw _ raA r■a; --____-.r■■1 f—..� ME IN --W__T�i� ■!!■■! ill!!llll■■ l_---■■■! 1l1131 ■111= fil bail!!!■ f ■IFI !€ 11 � ;rr: 1111111111:: f 11-111 On! 1111 �lNrl 11� ■i[l111111 1 ■I�; all l==rr�w�l�1 ■iiii irl■� I_i —r■ Rai r: ilil liwrr RrlRiil7r� rrrir r�■rw! 1 =mill f€ 1!1■w11:111[Illlil::1f11111::111111—l� Nll In [a rrrr aEl_�1311 ra rl[rrrrra irElr la ll 11■1�111111.11■l�i�ll IF-jwf [rrrrrrlr�rr:Mll- ir�N INNN! NEI r1 RNNrrrrlf ■■ ■i ■■ w■ E==i1011::1 1111ii11.-1{=ii=111 i HIM II Hi 11 11i"AR ii Ili" y! Ili" r_ =■ i�i�l 1NRRiill■.....rl°Nl-rrw�i ■iiN! �I r11NNNwir riliir'r lA )•1.a1 !� eN�3 ir!■ liiww NilrArir'NN= ■■ rir arRr!1 1=11;1p;1:1111illlli1:;11€11=111::111111— 11 ■111111f l ■I;; �I! 1'==rl�i�i---■liiiiiNll�il'Nl`=NNi�1EriNl� l=NlEii iRiNiiliNliliiir'NI-NlRilliii! I. € 1.11■il.Rllr#!!11■1■11€11-p- ■ IMI rlllEiiilrrl_I•GN >• rllriii■■.r r1Nl.?I] 11 11NNNNNN11� I■i'i €I - baba■■ a�r11 [ ■�.i■■s some Noma �l Illllll>R■■- BEEN R■ ■------- -_�__� - ■■�■1■■1A■■■■■l■■■l A" [SRl■■■■ _ ■RR■■■!■!■■I 11#[11:11=■11■=11■1 ■::111i11■■■lllr■■i ■=11 I!#INOR, Aim11=r::ll;wf11111 lisA:i'ys�:=rN=�1 A11�:iAirirr:r■■:iarirri■:: ■W.rr� :AA'i':i=-i�tiwai 1l..�i!rill ii= i�iwRAC:: iirfiSi! •'=is �.i w;�-01: �'it=is'i w- rrrrlrlww=Nil—ir 111■I1::1=il=1f=■■;rIA#ll■■■111■■■I rirlrr■w��rwwrwr[r■ a=R0 ■=11 arrlriR_rs�Neeriewrlr�rEar IAllr::111=1l=r::11::■1!!i rlilr�w-rN-wN_r�rlrrr1r11R�iirii! rwrr!rir=NN�lN=rirlrrErrlNElrrrrM15124 :=n�srrrlr�w-- -Err!!ii AI '- ----arRErr Iliiiirlrr 11 1111i1i1■=#1=i1IIr:;gi1111■■■ill■■■i �Qir1i 1��1�:f:4 �:pllf::�l�* iiiii:�llri'��c�R:�i=i::il[�lliifiii■■ili aIN_�, ■rr1 11 !ri 11 ■; :; 111 Ilfiil::Ii1�111rp:111lI1■■■i11■■lf _i1� �.i111 :l Ira Ire•r�..N-R.�i•••■r���.rrrl.lr! --. �.31rr1 .w Ami !1A r !rl ire !11 irl iii w rir til 1ai'� .ra krr uA irl art !rl i sae NMI tat !ir iltEl r■� tat IN1 lreA ill IR+ irl DSHEETM jj A-2.0 If. . ....... (D 5ECTION .. :. z ) z KEY PLAN CITY OF ti Federal Way June 25, 2014 John Parsaie _ Morgan Design Group LLC 11207 Fremont Avenue North Seattle, WA 98133 CITY HALL 33325 8th A ue. ILE Federal Way, WA 98003-6325 (253) 835-7000 www. cityoffederalway.. com RE: File #14-102980-00-PC; PREAPPLICATION CONFERENCE SCHEDULED Federal Way Senior Living, Federal Way Dear Mr. Parsaie: The Community Development department is in receipt of your preapplication conference request. The application has been routed to members of the Development Review Committee and a meeting with the project applicant has been scheduled as follows: 9:00 a.m. — Thursday, July 10, 2014 Hylebos Conference Room Federal Way City Hall, 2nd Floor 33325 8th Avenue South Federal Way, WA 98003 We look forward to meeting with you. Please coordinate directly with anyone else you would like to attend the meeting as this will be the only notice sent by the department. If you have any questions regarding the meeting, please contact me at stacey.welsh@cityoffederalway.com, or 253-835-2634. Sincerely, Stacey Welsh Associate Planner Doc. I.D. 65940