Loading...
18-104233WORK HOUR VARIANCE REQUEST DEPARTMENT OF COMMUNITY DESouth VELOP CITY OF SEP 11 2018 Fe w� e�"� Q Way Federal Way, WA 98003-6325 8�..71 �i �1 CffY OF FEDERAL WA`'" 253-835-2607; Fax 253-835-2609 COMMUNITY DEVELOP www.cityoffederalway.com FILE NUMBER - I (D _ Z DATE IVI APPLICANT INFORMATION NAME PRIMARY PHONE LL Maria Laura Escude — 611 5 Z J 206-440-4554 BUSINESS/ORGANIZATION ALTERNATE PHONE WA State DOT, NW Region 206-440-4522 MAILING ADDRESS E-MAIL 15700 Dayton Ave N, PO 330310 mussoml@wsdot.wa.gov CITY STATE ZIP FAX Shoreline I WA 198133 Location of Work (for work on both public & private property; complete both sections): ❑ Private Property (Address/Parcel ft X Public Right -of -Way (Street/Cross Street): SR 161 Milton Rd S Vic to SR 18 Paving & ADA Compliance SR 161 MP 35.32 to MP 36.25 Date(s) of Proposed Work: May 1, 2019 to October 30, 2019 Weather dependent. Hours of Proposed Work: 9 pm to 7 AM Monday thru Friday 2 week end closures TBD • Description of Proposed Work & Equipment Involved: • Grind and inlay 0.15 ft. with HAM along both directions from SR 161 ■ Perform full depth pavement repair • Update ADA Ramps roadway delineation to current WSDOT requirements • Upgrade Traffic loops at Signalized intersections • Perform required safety work as needed See Attachment for equipment and number of nights. Names & phone numbers of TWO contacts that will be available during proposed work hours: 1) Mike Askarian PE 2) Laura Musso Escude (206) - 768 - 5868 (206) - 579 - 7562 Reason proposed work must be completed outside of regular work hours: For public and work zone safety, WSDOT Acoustic and Air Quality requests, with the concurrence of WSDOT Construction Traffic construction night time lane closures. Partial or full closure of SR 161 during the daytime work would result in worker and motorist safety concerns due to the reduced work area and travel lane width. Provide a brief explanation why the work will not be detrimental to nearby properties: Daytime closures would worsen current traffic congestion at the project location that serves residential, schools, and commercial business users. In regards to the noise impacts for residents, we anticipate that the contractor will not spend more than two nights performing the same type of work. Bulletin #080 — February 13, 2017 Page 1 of 2 k:\Handouts\ Work Hour Variance Request See second page for additional application questions. TO BE COMPLETED, B-YAPPLICANT . 1) Are the following criteria met in accordance with FWRC 19.105.040(2)(a)(www.codepublishinp-.coFw%iIA/FederalWavl]? Yes No ❑ X Work will not result in substantial adverse impacts to surrounding properties. X ❑ The exception is necessary to avoid undue delay of project completion and/or long-term inconvenience or disruption to the public, 2) Will the following criteria be met in accordance with FWRC 19.105.040(3)? Yes No X ❑ Will written notice be mailed at least seven days in advance of the work to owners and occupants of property located within 300 feet of the project boundary? X ❑ Will a notice board that includes construction hours, description of construction activities, mitigation measures, and two 24 hour project contacts for the duration of the project be posted at the project site? 3) If the answer to question two, above, is no, what methods of notice will be provided, or why is public notice not necessary? Please explain: TO BE COMPLETED BYSTAFF 1) Notifica l�tio Requirements Waived? Yes ❑ No 2) Conditions of Approval ❑ Yes 12/lti0 Conditions Attached: ❑ Yes ❑ No 3) In accordance with FWRC 19.105.040(2)(a), this application is hereby: Approved iunity Development Director ❑ Denied 2 As Date Bulletin #080 — February 13, 2017 Page 2 of 2 k:\Handouts\ Work Hour Variance Request # Nights Type of Work Equipment 21 Mill and Fill Planer, HMA Paver, Dump Trucks 1 Traffic Loos Concrete Saw, Vacuum Truck 1 _ Striping Trucks 24 Ramps Concrete Saw, Jackhammer, Hump Truck Compaction loader, Concrete Trucks, Auger Truck N/A Other Equipment Excavator, Generators / Lights, Pumps, Flatbed Trucks, Pickup Trucks, Sweepers sk oIL =SS � U) ( K 2k ■ �§ � a \ 2 § mC4 !! (§M IL �k »� 2 z U,§ ■�. co � � � | \ - § r ! SAV i , _ e. • ` } /|§. �* - J. t , w m --- �� lk § if ,` C4 2 § � cc |, L 0 z .. a% 2� ■ | , |■, § & File _ ■=E _ ■|||�u !|■2§