Loading...
07-104531CITY OF �. Federal September 14, 2007 Mr. Ron Tremaine Redstone Development 17414 433rd Place SE North Bend, WA 98045 CITY HALL 33325 8th Avenue South y Mailing Address: PO Box 9718 Federal Way, WA 98063-9718 (253) 835-7000 www.cityoffederalway.com Re: File #07-104531-00-PC, PREAPPLICATION CONFERENCE SUMMARY Federal Way Plat; No Site Address, Federal Way Dear 1&. Tremaine: Thank you for participating in the preapplication conference with the City of Federal Way's Development Review Committee (DRC) held September 6, 2007. We hope that the information discussed at that meeting was helpful in understanding the general requirements for your project as submitted. This letter summarizes comments given to you at the meeting by the members of the DRC. The members who reviewed your project and provided comments include staff from the City's Planning and Building Divisions and Public Works Department, and representatives from Lakehaven Utility District and South King Fire and Rescue. Some sections of the Federal Way City Code (FWCC) and relevant information handouts are enclosed with this letter. Please be advised, this letter does not represent all applicable codes. In preparing your formal application, please refer to the complete FWCC and other relevant codes for all additional requirements that may apply to your project. The key contact for your project is Senior Planner Isaac Conlen isaac.conlen ci oftederalwa .com, or 253-835-2643). For specific technical questions about your project, please contact the appropriate DRC representative as listed below. Otherwise, any general questions about the preapplication and permitting process can be referred to your key contact. PROJECT DESCRIPTION The proposal is to subdivide two lots totaling 7.49 acres into 28 single family lots; a stormwater detention facility will be provided and a fee in lieu will substitute for on -site open space. Current zoning is Residential Single -Family (RS 15.0). The proposed subdivision is contingent upon a successful comprehensive plan amendment and rezone of the property to RS 7.2. A secondary option (option B) of subdividing the lots into 15 single family lots with a stormwater detention facility and fee in lieu for open space has also been proposed. This option is based upon existing RS 15.0 zoning and does not require a comprehensive plan amendment or rezone. Mr. Ron Tremaine Page 2 September 14, 2007 MAJOR ISSUES Outlined below is a summary of the major issues of your project based on the plans and information submitted for preapplication review. These issues can change due to modifications and revisions in the plans. These major issues only represent comments that the DRC consider most significant to your project and do not include the majority of the comments provided. The major issues section is only provided as a means to highlight critical requirements or issues. Please be sure to read the entire department comments made in the next section of this letter. * Planning Division Successful comprehensive plan amendment to Single Family High Density and rezone to RS 7.2 for the preferred option. Public Works Development Services Division Surface water runoff control and water quality treatment will be required for the site and for any offsite street improvements. Currently, the project must meet the requirements of the 1998 King County Surface Water Design Manual (KCSWDM). Regulations may change within the next eight to 12 months. The project will be vested to regulations in place at the time the application is deemed "complete." • Public Works Traffic Division 1. A concurrency analysis is required. 2. Street frontage improvements and right-of-way dedication are required along SW 3660' Street. 3. The current proposal must meet access management and block perimeter standards. DEPARTMENT COMMENTS Outlined below are the comments made by the representatives of each department present at the preapplication conference. Each section should be read thoroughly. If you have questions, please contact the representative listed for that section. PLANNING DIVISION (Isaac Conlen, 253-835-2643, isaac.conlen@cityoffederalway.com) a) Zoning and Comprehensive Plan Designations — The site is zoned RS 15.0. The minimum lot size for each lot is 15,000 square. feet. The comprehensive plan designation is medium -density single- family. The City will be evaluating the subject properties in conjunction with surrounding properties for a potential area -wide comprehensive plan amendment to Single Family High Density and corresponding rezone to either RS 9.6 or RS 7.2. The proposed subdivision to 28 lots is contingent on rezoning to RS 7.2. Option B does not require a rezone. Timing to evaluate and potentially enact these changes is in the range of eight months to one year. File #07-10453 1 -00-PC Doc ID 42088 Mr. Ron Tremaine Page 3 September 14, 2007 b) Preliminary Plat Review — Under FWCC Chapter 20, "Subdivisions," preliminary plats are subject to City Council approval following a public hearing and recommendation from the Federal Way Hearing Examiner. The preliminary plat is also subject to environmental review under the State Environmental Policy Act (SEPA) prior to the Hearing Examiner review, The preliminary plat application fee is $7,065.50, plus $72.50 per acre. The SEPA checklist application fee is $869.50. Separate fees are required for Public Works engineering review and inspection. The application must be prepared in accordance with the submittal requirements listed in the subdivision code and the enclosed information bulletin. With the application, provide three sets of stamped, addressed envelopes for property owners within 300 feet of the subject site. Include the City of Federal Way return address (PO Box 9718) on all envelopes. For our records, provide a list of the property owners within 300 feet of the subject site and provide a corresponding parcel map showing the 300-foot radius from the subject site. A handout detailing procedures for obtaining mailing labels from the City is enclosed. c) Open Space Requirements — Pursuant to FWCC Section 20-155(b), a subdivision must provide open space in the amount of 15 percent of the gross land area of the subdivision site. A fee -in -lieu payment may be made to satisfy open space requirements at the discretion of the City's Parks Director after consideration of the City's overall park plan, quality, location, and service area of the open space that would otherwise be provided within the project. The fee -in -lieu of open space shall be equal to 15 percent of the most recent assessed value of the property (at time of final plat). The City Parks Department has indicated strong support for accepting fee in lieu for this project. d) Significant Trees, Vegetation, and Grading — All existing significant trees and natural vegetation must be retained on the site to be subdivided, except that which will be removed for improvements or grading as shown on approved engineering plans. Clearing and grading of individual future lots is not permitted during construction of the plat infrastructure, except in locations to be determined by the City that present extreme topography or other unusual conditions. A preliminary clearing and grading plan shall be submitted as part of preliminary plat application (FWCC Section 20-179). It is the applicant's responsibility to demonstrate that the grading limits are the minimum necessary to accommodate infrastructure improvements. The City is considering some text amendments to the above noted vegetation retention and grading requirements. Those requirements noted above may be modified in some way, but it is too early to provide details regarding the effect of potential revisions to the code. Trees defined as significant by the FWCC (Section 22-1568) shall be identified and retained or replaced (with new evergreen trees a minimum of 10 feet in height, or deciduous trees with a minimum three inch caliper) at the rate of at least 25 percent of the significant trees on the site. Removal of significant trees that are located within areas to be developed for rights -of -way or other plat utilities are exempt from the 25 percent retention calculation. The application must include an inventory of significant trees presently on the site and plat design shall accommodate existing significant trees to the maximum extent possible. A landscape plan prepared by a licensed landscape architect, and consistent with FWCC Section 20- 186, must be submitted with the preliminary plat application. The plan shall identify the following: significant trees to be removed and retained; street trees along the internal plat streets; and File #07-104531-00-PC Doc ID 42088 Mr. Ron Tremaine Page 4 September 14, 2007 landscaping around all sides of the proposed detention pond. Landscaping between any street and a storm drainage tract must be a minimum of five feet of screening landscaping and shall be in a tract owned and maintained by the homeowners' association. e) Geologically Hazardous Areas — Portions of the site are mapped as erosion hazard areas. The east portion of the site appears to be relatively steep and may meet the criteria of a landslide hazard area. A geotechnical report that identifies any geologically hazardous areas on -site and makes recommendations for construction practices and mitigation measures, if necessary, is required. See FWCC Section 22-1286. f) Storm Drainage — All facilities established for storm drainage purposes shall be installed in separate tract(s), shall not be part of individual building lots, and shall be landscaped as discussed above. g) School Mitigation Fees — Payment of a school impact mitigation fee is required for each single- family residence at the time of issuance of individual residential building permits. The current single-family residential mitigation fee is $3,018, plus an administrative fee of $151 per unit. This fee is due at the time of building permit submittal and is adjusted annually by the Federal Way Public School District. h) School Access —A copy of the application packet has been forwarded to the Federal Way School District for review of school pedestrian access and circulation. A memo from the school district will be forwarded to you upon receipt. A school access analysis is required in conjunction with the preliminary plat application. i) Existing Improvements — Any existing structures on the subject property must be depicted on the plat map and must meet the minimum FWCC setbacks from new property lines if they will be retained. Specifically, a 20-foot front setback from the new road right-of-way and five-foot minimum side yard and five-foot minimum rear yard setback must be provided. Alternatively, the existing structures on the site may be removed, which appears to be the preferred option in this case. j) Final Plat — The City requires a $2,666.50 application fee for final plat (adjusted annually). Substantial completion of the plat infrastructure must occur prior to submittal and processing of the final plat. The City allows bonding of only minor improvements identified in FWCC Section 20-135 in order to process the final plat. FWCC Section 20-136 requires City Council review of the final plat. k) Timeframes — Under FWCC procedural guidelines, the City will determine if an application is complete within 28 days of submittal and identify what, if any, additional information is required for the application to be deemed complete. Regulatory reform does not establish timelines for subdivision review, although the City strives to process environmental applications within 90 days of complete application. City review is suspended at any time that the City requests additional information from the applicant. Throughout project review, the applicant will be notified in writing of the status of the preliminary plat application. The applicant may also request and pay for 15-Day Technical Review,' if available (dependant on work load capacity). See the information bulletin, 15-Day Technical Review Process. File N07-104531-00-PC Doc ID 42088 Mr. Ron Tremaine Page 5 September 14, 2007 1) Submittal Prior to Zoning Change — If you decide to pursue your'subdivision proposal based on RS 7.2 zoning, you will not be able to submit your application until such time as the zoning change becomes effective. m) Cluster Subdivision —This project may apply for approval as a cluster, subdivision. Cluster subdivisions allow flexibility in lot sizes and are generally beneficial where on -site critical areas constrain developable area: Fee -in -lieu is not available for cluster subdivisions. n) Limitations = In accordance with code requirements, the applicant must complete the plat improvements within five years of the preliminary plat approval, or the decision is void. Provisions for extension of these timeframes are set forth in code. o) Plat Name —Please choose a unique name for this project before submitting your preliminary plat application. Otherwise, we end up with. too many projects called `"Federal Way" this and that, which causes confusion on our end. PUBLIC WORKS DEVELOPMENT SERVICES DIVISION (Ann Dower, 253-835-2732, ant<.dower@cityoffederalway.com) Land Use Issues Stormwater 1. Surface water runoff control and water quality treatment is currently required to meet requirements of the 1998 King County Surface ,Water Design Manual (KCSWDM) and the City of Federal Way Addendum to the 1998 KCSWDM. This project meets the requirements for a Full Drainage Review. At'tlie time of preliminary plat submittal, a preliminary Technical Information Report (TIR), addressing the relevance of the project to the eight core and five'special requirements of the KCSWDM will be required. A Level 1 downstream analysis shall also be piovided in the preliminary TIR. The City has V = 100', .five-foot contour planimetric maps that may be used for basin analysis. Surface water regulations may change at some point during the next eight to 12 months. The project will be vested to the regulations in place at the time that an application is considered complete. 2. The project lies within a Level 1 flow control area, thusAhe applicant must design the flow control facility to meet this performance criteria. The project also lies within a Resource Stream Protection Water Quality Area. Water quality treatment shall be designed to meet the treatment criteria of the Resource Stream Protection Menu. 3. If infiltration is proposed, soil logs prepared by a licensed geotechnical engineer or septic designer must be provided to verify infiltration suitability. 4. Detention and water quality treatment facilities for subdivisions are required to be above ground (i.e. an open pond), within a separate storm drainage tract and dedicated to the City for future maintenance. Detention and water quality facilities may be within the same tract. Underground facilities are allowed only with approval from the City of Federal Way Stormwater Management Division. File #07-104531-00-PC Doc ID 42089 Mr. Ron Tremaine Page 6 September 14, 2007 Show the proposed location and dimensions of the detention and water quality facilities on the preliminary plans. 6. If more than one acre will be disturbed during construction, a National Pollutant Discharge Elimination System (NPDES) permit may be required. Information regarding this permit can be obtained form the Washington State Department of Ecology by calling 360-407-6437, or at www.eqy.wa.p,ov/prop,rams/sea/pac/index.htm]. 7. The proposed pond location may require retaining walls to be built to create the pond. Geotechnical and structural review may be required, at the developer's expense. In addition, if walls are located next to the property line, the walls will be reviewed for aesthetic impact on neighboring properties and the maximum height shall be six to eight feet. Right -of -Way Improvements See the Traffic Division comments from Soma Chattopadhyay for traffic related items. 2. If dedication of additional right-of-way is required to install street frontage improvements, the dedication shall be conveyed to the City through a statutory warranty deed. The dedicated area must have clear title prior to recording. 3. All stormwater treatment and detention requirements outlined above will be applied to new impervious area within the public right-of-way. 4. FWCC Section 22-1543 requires that driveways serving residential uses may not be located closer than 25 feet to any street intersection. Lots and intersections within new subdivisions or short plats must be designed to meet this standard. 5. Open cuts for utility trenching within the public right-of-way require approval by the Federal Way Streets Division. Some open cuts are prohibited. All require mitigation fees and possible full -block overlay. Please contact Engineering Technician Kathleen Messinger at 253-835-2725 for more information. Building (or EN) Permit Issues Engineered plans are required for clearing, grading, road construction, and utility work. Plans must be reviewed and approved by the City. Engineering review fees are $756.00 for the first 12 hours of review and $63 per hour for additional review time. A final TIR shall be prepared for the project and submitted with the engineering plans. Both the TIR and the plans will require the signature/seal of a professional engineer registered/licensed in the State of Washington. 2. In addition to engineering approval, short plats and subdivisions are required to obtain a separate permit for grading. Details and fees may be obtained from the Federal Way Building Division. 3. The Federal Way Development Standards Manual (including standard detail drawings, standard notes, and engineering checklists) is available on the City's website at www.cityoffederalway.com, to assist the applicant's engineer in preparing the plans and TIR. File P07-104531-00-PC Doc ID 42088 Mr. Ron Tremaine Page 7 - September 14, 2007 4. The applicant shall provide a geotechnical report that addresses design pavement thickness for the roadways. 5. Bonding is required for all improvements associated with the project. The bond amount shall be 120 percent, of the estimated costsof the improvements. An administrative fee deposit will need to accompany the bond to cover any possible legal fees in the event the bond must be called. Upon completion of the installation of the improvements, and final approval,of the Public Works Inspector, the bond will be reduced to-30 percent of the original amount and held for a two-year maintenance -period. 6. The developer will'be responsible for the maintenance of all storm drainage facilities (including the detention and water quality facilities) and street systems during the two-year maintenance period. During that time, the Public Works In will make periodic visits to the site to ensure the developer's compliance with the maintenance requirements. Upon satisfactory completion of the two-year maintenance period, the remainder of the bond will be released. Maintenance for public roads and subdivision drainage facilities then become the responsibility of the City. Maintenance for private roads and drainage facilities, including short plats, remain the'responsibility of the individual property owners. 7. When topographic survey information is shown on the plans, the vertical datum block shall include the phrase "DATUM: N.G.V.D.-29" or "DATUM: K.C.A.S.," on all sheets where vertical elevations are called out. 8. Drawings submitted for plan review shall be printed on 24" x 36" or 22" x 34" paper. All final approved drawings shall be drafted/plotted on 24" x 36" or 22" x 34" mylar sheet with permanent black ink. Site: plans shall be drawn at a scale of 1" = 20', or larger. Architectural scales are not permitted on engineering plans. 9. Provide cut and fill quantities on the clearing and grading plan. Erosion control measures, per Appendix D, 1998 KCSWDM, must be shown on the engineering plans. 10. The site plan shall show the location of any existing and proposed utilities in the areas affected by construction. PUBLIC -WORKS TRAFFIC DIVISION (Soma Chattopadhyay, 253-835-2745, soma.chattopadhyay@cityoffederalway.com) Transportation Impact Analysis 1. Based on the Institute of Transportation Engineers. Trip Generation 7t1i Edition, land use code 210 (Single -Family Detached Housing), the project is expected to generate approximately 34 new weekday evening peak hour trips for 28 dots and 19 new weekday evening peak hour trips for 15 lots development: Therefore, a Concurrency Analysis is required and the application fee is $1,448 for this proposal. The applicant would be expected to contribute pro-rata shares towards Transportation Improvement Plan (TIP) projects impacted by one or more -peak hour trips. Mitigation improvements File H07-104531-00-PC Doc I D 4'088 Mr. Ron Tremaine Page 8 September 14, 2007 necessary beyond those identified in the TIP to meet the City's adopted level -of -service standard are required to be provided by the applicant to meet concurrency requirements of the Growth Management Act. Street Frontage Improvements Per FWCC Section 22-1474, the applicant/owner would be expected to construct street improvements consistent with the planned roadway cross -sections as shown in Map III-6 of the Federal Way Comprehensive Plan (FWCP) and Capital Improvement Program (CIP) shown as Table III-19. Based on the materials submitted, staff conducted a limited analysis to determine the required street improvements in meeting the FWCC. Based on the analysis and FWCC, the applicant would be expected to construct improvements on the following streets to the City's planned roadway cross - sections: SW 366"' Street is planned as a Type "S" street, consisting of a 36-foot street with curb and gutter, four -foot planter strips with street trees, five-foot sidewalks, and three-foot utility strip in a 60-foot right-of-way. Assuming a symmetrical cross section, 30-foot right-of-way dedication and half street improvements are required with 20-foot minimum pavement and one -foot utility strip, in lieu of three feet, plus a three-foot easement. Right-of-way dedication and improvements are required from 6"' Avenue SW to the east property line. Also, provide a 25-foot corner radius at SW 366`h Street and 6"' Avenue SW, which must be dedicated as right-of-way. If access is from the east (0 Avenue South), dedication and improvements are required to the nearest improved street starting from the west property line. Per drawing 3-1A in the Public Works Development Standards, internal streets shall be planned as Type "W" streets,. consisting of 28-feet of paving with curb and gutter, four -foot planter strips with street trees, five-foot sidewalks, and streetlights in a 52-foot right-of-way. Full street improvements are required, except the portion of the street between 6a' Avenue SW and the east property line of parcel #3021049038, where half street improvements with 20-foot minimum asphalt, curb, gutter, four -foot planter strip, five-foot sidewalks, three-foot utility strip, and streetlights is required. A 25-foot corner radius at the intersection of the internal street and 61h Avenue SW must be dedicated as right-of-way. Also, see the access and traffic circulation sections of this letter, item #2. 2. The 15 lot proposal does not require a second access. If there is no second access, a 30- foot right-of- way dedication is required on the frontage of the south end property line on SW 366' Street and half street improvements. A temporary turnaround is required at the south property line. The internal street shall extend from SW 366"' Street to the north property line. All the other requirements are the same as the 28 lot proposal. 3. The owner may be required to dedicate additional right-of-way to accommodate additional turn lane improvements if required by the Transportation Impact Analysis (TIA) and/or property corner radius. Please show existing and required right-of-way dedication on the plans. Right-of-way dedication shall be conveyed to the City through a Statutory Warrant Deed and must have clear title prior to recording. File #07-104531-00-PC Doc ID 42088 Mr. Ron Tremaine Page 9 September 14, 2007 4. Per FWCC Section 22-1477, the applicant may make a written request to the Public Works Director to modify, defer, or waive the required street improvements. Information about a right-of-way modification request is available through the assigned planner. Such a request has a set review.fee. Access and Traffic Circulation 1. Access management standards are based on roadway safety and capacity requirements. FWCC Section 22-1543 provides access standards for streets based on planned roadway cross -sections. Please note that access classifications are per Drawing 3-1A in the Public Works Development Standards. 2. FWCC Section 20-151 and FWCP Policy TP21 require block perimeters no longer than 1,320 feet for non -motorized trips and 2,640 feet for streets. Therefore, north/south connection along the east side of the property (roadway cross section W) would be required. The north/south internal street requires extending to the north property line for future extension and to meet block perimeter standards and a temporary cul-de-sac. 3. Per FWCC Section 22-1496, the applicant would be expected to construct a 20-foot paved access, curb, gutter, sidewalk, and street lighting to the nearest intersecting improved right-of-way for second access from SW 36e Street. Other Comments 1. Please utilize roadway cross-section Z for cul-de-sac terminus dimensions (53-foot radius). 2. Please note that the maximum allowable grade for City streets/access driveways is 15 percent, or as approved by the fire department. LAKEHAVEN UTILITY DISTRICT (Brian Asbury, 253-946-5407, basbury@lakehaven.org) Water A developer extension agreement will be required to construct new and/or abandon existing mainline water distribution facilities for the proposed development. Additional detail and/or design requirements can be obtained from Lakehaven by submitting a separate application to Lakehaven for either a pre -design meeting or a developer extension agreement (application copies enclosed). Lakehaven encourages the owner to apply for either of these processes early in the pre -design/ planning phase to avoid delays in overall project development. • A separate water service connection application is required for each new service connection to the water distribution system, following completion of any required mainline construction, in accordance with standards defined in Lakehaven's current "Fees and Charges Resolution." File #07-104531-00-PC Doc I D 42088 Mr. Ron Tremaine Page 10 September 14, 2007 Sewer A developer extension agreement will be required to construct new low-pressure sanitary sewer (LPS) facilities necessary for the proposed development. Additional detail and/or design requirements can be obtained from Lakehaven by submitting a separate application to Lakehaven for either a pre - design meeting or a developer extension agreement (application copies enclosed). Lakehaven encourages the owner to apply for either of these processes early in the pre-design/planning phase to avoid delays in overall project development. • A separate sewer service connection permit is required for each new connection to the sanitary sewer system or any modification to an existing sewer service connection, following completion of any required mainline construction, in accordance with standards defined in Lakehaven's current "Fees and Charges Resolution." General ■ Charges payable -in -lieu -of -extension, and/or latecomer and/or early comer charges may be assessable against the property for facilities either previously constructed or to be constructed that provide direct benefit to the property. Please contact Lakehaven for further detail by obtaining submitting a separate application for a pre -design meeting or a developer extension agreement (application copies enclosed). • Lakehaven's Capital Facilities Charges are calculated on the basis of Equivalent Residential Units (ERU). Residential equivalency for single-family use is calculated as 1.0 ERU per unit. Lakehaven's 2007 Capital Facilities Charges are $3,196/ERU for water and $2,768/ERU for sewer. • Credit may be available for this property from connection charges previously assessed for water and/ or for sewer. Please contact Lakehaven for further detail by submitting a separate application for a pre -design meeting or a developer extension agreement (application copies enclosed). • All comments herein are valid for one year and are based on the proposal(s) submitted and Lakehaven's current regulations and policies. Any change to either the development proposal(s) or Lakehaven's regulations and policies may affect the above comments accordingly. SOUTH KING FIRE AND RESCUE (Chris Ingham, 253-946-7244, chris.ingham@south kingfire.org) Water Supplies for Fire Protection A Certificate of Water Availability shall be provided at the time of formal application indicating the fire flow available at the site. Fire hydrants shall be spaced 600 feet or less apart. Every building lot shall have a fire hydrant within 300 feet. All measurements shall be made as vehicular travel distance. Fire hydrants shall be in service PRIOR to and during construction. Fire Apparatus Access Roadway Fire apparatus access roads shall be in service prior to and during construction. File N07-104531-00-PC Doc I D 42088 Mr. Ron Tremaine Page 11 September 14, 2007 CLOSING This letter reflects the information provided at the preapplication meeting and is intended to assist you in preparing plans and materials for formal application. We hope you found the comments useful to your project. We have made every effort to identify major issues to eliminate surprises during the City's review of the formal application. The completion of the preapplication process in the content. of this letter does not vest any future project application. Comments in this letter are only valid for one year as per FWCC Section 22-1657. As you know, this is a preliminary review only and does not take the place of the full review that will follow submission of a formal application. Comments provided in this letter are based on preapplication materials submitted. Modifications and revisions to the project as presented for this preapplication may influence and modify information regarding development requirements outlined above. In addition to this preapplication letter, please examine the complete FWCC and other relevant codes carefully. Requirements that are found in the codes that are not addressed in this letter are still required for your project. If you have questions about an individual comment,, please contact the appropriate department representative noted above. Any general questions can be directed towards the key project contact (Isaac Conlen, 253-835-2643 or Isaac.conlen@cityoffederalway.com). We look forward to working with you. Sincerely, Isaac Conlen Senior Planner enc: Master Land Use Application Preliminary Plat Checklist Mailing Label Handout 15-Day Technical Review Handout SEPA Checklist Lakehaven Water and Sewer Maps Lakehaven Developer Pre -Design Application Lakehaven Developer Extension. Agreement Application FWCC Chapter 20 FWCC Section 22-1286 FWCC Section 22-1568 Anne Dower, Engineering Plans Reviewer Soma Chattopadhyay, Traffic Engineer Brian Asbury, Lakehaven Utility District Chris Ingham, South King Fire & Rescue File P07-104531-00-PC Doc ID 42089 Map 97 � 07I � R g+� � d s 2 • � �' E � ` o l�g.l� � � � rc � z ego{ � � � �S�E � dog •fig � � w:E ���_x -q� � - _���� =E I7t1Y1'¢ �U s»o CL m 2 Ms rr. 0 N ca L m LL ti r PC i'AILe .. _.. ... .. . __ ---- - .+a ¢ S r 4 cn ^' I ` i =a M9A HL "'• R = _ - �� i- �� s eT.lmfc EZ H I u�•I ui � x . -t:._ 47 CD iLgicm cn ui jp ° - C i E cn 1^ MS AV HI9 Ms Ad H19 R4$ RY H19 Ms AV H19 ; i y C ± ! u! w 11 •� � O LO Ln [ o- A Y ^ �� � N° ui Ln cn 0 f- t2 i` Al2 co f P CA_ iAjz 'S -• _ �a E W MS-Id1S6 m^ � G711 L6 O O M y h CA n- Q N o� D7 n p � o G M m w v O o W N !R ^ era M M O iti Q1 i0 Q] �2 AV ONE ;M! S Nyy b 1 a1 p LLO'f T m O Cl O [pD O M M O] O O LLN'1 O O p lCl tD t0 O O f0 O N Y■ O 1[ v p W O O Ln yN O M CD �/w 0 q " o g O O N p Y/ CC S Id 4NZ 0 i00 m M M o M N m m p M o � M..- ' � o 0 � o M � M _ u-i a �J oli c N O M r �o N n O N m o A� - m 0 o c o rn � � rn m ;^ o ul cn p o � d °D m 000, o � O •�^� M � - 0 oW � v-- 1� y■y■ r a� v j f� o �'.: yyA u�' ■ �]O ■ �r N � + M O u r cnO � A■r O W O p OO Lr N O M O O W _ O W C � •-- i0 �yi y■ O i0- � OJ - V O Ol N -Itp N O N N O In Of 'O M ■ � Pf- •', -� .1 p_ � N M N, � N M Pi p !1 N N Lfl ' OO w d H19 MS AV H19 N / M G in T T•II W f0 N P9 �� O 111 W � M G M �. CIT 1�k Federal Way August 17, 2007 Ron Tremaine Redstone Development 17414 433id Place SE North Bend, WA 98045 CITY HALLFILE 33325 8th Avenue South Mailing Address: PO Box 9718 Federal Way, WA 98063-9718 (253) 835-7000 www.cityoffederalway.com RE: File #07-104531-00-PC; NOTICE OF PREAPPLICATION MEETING Federal Way Plat, *no site address* (Parcel #302107-9069 & 302104-9173) Dear Mr. Tremaine: The above -referenced proposal has been assigned to me as project planner. At this time, the application has been routed to the members of the Development Review Committee. A meeting with the project applicant and Development Review Committee has been scheduled as follows: 9:00 AM, Thursday, September 6, 2007 Hylebos Conference Room City Hall, 2°d Floor 33325 8"' Avenue South Federal Way, WA 98003 We look forward to meeting with you. Please coordinate directly with anyone else you would like to attend the meeting. Please call me at 253-835-2644 or e-mail me at andy.bergsagel@cityoffederalway.com if you have any questions. Sincerely, Andy Bergsage Associate Planner c: Greg Diener Pacific Engineering Design LLC 15445 53`d Avenue South Seattle, WA 98188 Ted McCaugherty 1450 51h Avenue, Suite 2200 Seattle, WA 98101 Doc i D 42081 CITY OF FEDERAL WAY DEPARTMENT OF COMMUNITY DEVELOPMENT SERVICES DEVELOPMENT REVIEW COMMITTEE TRANSMITTAL DATE: August 17, 2007 TO: Will Appleton, Development Services Manager - Development Services - Traffic Scott Sproul, Assistant Building Official Brian Asbury, Lakehaven Utility District Chris Ingham, Federal Way Fire Department Geri Walker, Federal Way School District FROM: Andy Bergsagel FOR DRC MTG. ON: August 30, 2007 - Internal Meeting September 6, 2007 @ 9 a.m. - with applicant FILE NUMBER(s): 07-104531-00-PC RELATED FILE NOS.: None PROJECT NAME: FEDERAL WAY PLAT PROJECT ADDRESS: *NO SITE ADDRESS* (SW 366th Street and 6th Avenue SW) ZONING DISTRICT: RS 15.0 (Proposal anticipates RS 7.2 zoning) PROJECT DESCRIPTION: Proposal to subdivide 2 lots into a 28 lots. LAND USE PERMITS: Preliminary Plat, SEPA PROJECT CONTACT: REDSTONE DEVELOPMENT Attn: Ron Tremaire 17414 433rd Place SE 206-353-1761 MATERIALS SUBMITTED: Preliminary Plat conceptual drawing NOTE: The proposal shows a plat with RS-7.2 zoning. The zone is currently RS 15.0. We will process this as subject to rezone to RS-7.2. .- ) CITY OF FEDERAL WAY COMMUNITY DEVELOPMENT REVIEW COMMITTEE Preapplication Conference Sign In Sheet Project Name: qLd-vai WLAf 1 , / Address: S �a ' t—E� ��u SVV File # Date: S,'E-Ob NAME REPRESENTING TELEPHONE NUMBER 57 2. 3. VR[A-PJ 253-` 5. SP r 6. zlilf-PAAA Agv�� 7. 9. 10. A�71'S v�LdP 12. 13, 1 I . A." 25�-�3s -z�3z 2i'3 935• 2,7 3o <21 - Y�S - 2-4q qg-� - 411 - 6 I "/ Z6K -Sa-I-597 2S3 - b3 5"- Z(S, 56 �� 3- E22)�-2-T% Page 1 of 2 LIOn Map A' 'gun irn4ii-�'i•. OD co f12 - 'a a sco$ a s, lb �4 j a 12 a tv - r lb $ {I co 114 t 8 w i I N 113 j ep H130 v m 3WH N _� ro i as T 3 4 - � w 8 8 3 Is :._ W $ —L $ eq `4 N $ S $ $ — r— $ to co - N..538 co al $ ; ��m -�4 _ � ,-• � �---�� � °°� � 1. 14 t m vto a, r r H14 q=114 r - i m 4 �. —! X 19TH 10 � OD � r I a stos s a a j a -40 to-s� I IT ti 330 4 4�_l $ y l7 .tI I $ 0453 FA �i -1 7 7 •� , CITY OF FEDERAL WAY F http://columbia/tion/map.aspx � AXMVWDOESNOTVMUrl, BUILDING DEP-b/18/2007 NORRi'�S(y TO LE FORT Page 1 of 2 LIOn Map A; 8 8 8 "t �--- ca C. 112 CD co � I } 8 t3co r $ m ca a m ad Z $, N Go. „113 �1 2_ $ -' 4 to ` .. H13 0 L__ _ UO I a:B 358TK � f 7 N Nr cq r ED 4do 22 It r W 538 440 v G'14 to 3SSrH ca cq 19TH -� _� ti� -- i OD cr , Ga to to ,• Q�. - B to a 6 �' - - - en an - Ipt [ I r --- l �His - i+ —.— �� a L1 f�ift EEI�` AUG 1 5 2007 hupl/columbia/lion/map_aspx �,A ; 1 �� �� 'IYY OF FEDERAL- A1V/2007 - NOR IS REMNMLEFMTHO B ���L BUILDINGDEPT.r ACCMCY OF Federal Way 41k MASTED .AND USE APPLICATION REVEI V E® DEPARTMENT OF COMMUNITY DEVELOPMENT SERVICES RGV 33325 8`h Avenue South PO Box 9718 AUG 1 5 2007 Federal Way WA 98063-9718 253-835-2607;Fax 253-835-2609 CITY Ofw fF-Dr-IIAL WAY www.cinffederalway.com BUILDING DEPT, APPLICATIONNO(S) (/Z— /011J 31-00 r /JC__1 Date # 1S Zc0::,7- Project Name f� Property Address/Location (-a+I Avt �s V/ Parcel Number(s)(] Project DescriptionGc�T PLEASE PRINT Type of Permit Required Annexation Binding Site Plan Boundary Line Adjustment Comp Plan/Rezone Land Surface Modification Lot Line Elimination Preapplication Conference Process I (Director=s Approval) Process II (Site Plan Review) Process III (Project Approval) Process IV (Hearing Examiner's Decision) Process V (Quasi -Judicial Rezone) Process VI SEPA w/Project SEPA Only Shoreline: Variance/Conditional Use Short Subdivision kS Variance: Commercial/Residential Required Information R S 1 ix�o Zoning Designation JO Comprehensive Plan Designation 0M Value of Existing Improvements Value of Proposed Improvements International Building Code (IBC): Occupancy Type Construction Type Applicant Name: /y, r- .RS% 6/V,c 01 VJ2:Z Mr Address: /7y/4/ 4133 P-5 51- City/State: A.1 D4 TN 1'3END 0 A Zip: M6 $16— Phone: �d Z - 3 5' 3 -- 19 Co Fax: q12 5 9''3/ 7 7,f,3 Email.: fqf-, r G►J, Signature;'t�tf IieT✓nAit .Co,� Agent (if different than Applicant) Name: Address: ls`lrc{Jr cn{� S City/State: 5e,-11G Zip:giS$ Phone: Z `f,31- _:�rQ 740 Fax: Email: Z Signature: 1) QQl Owner Name. 7� A Ae-x Address: je�CJ ,.ve— Crty/State: 6e4x1He' LJA Zip: nq SlO I Phone: Z 0( r Zl �'q 79 Fax: Email: Signature: Bulletin #003 —August 18, 2004 Page I of 1 k:\Handouts\Master Land Use Application 9/11 /2007 Horizon with 2550: S 312 St & Pacific Hwy S Timings --I. t II # Lane Group EBL EBT WBL WBT NBL NBT SBL SBT SBR Lane Configurations t' , Vi 0 11 ttl N ttt if Volume (vph) 245 350 145 421 324 787 164 1042 267 Turn Type Prot Prot Prot Prot pm+ov Protected Phases 7 4 3 8 5 2 1 6 7 Permitted Phases 6 Detector Phases 7 4 3 8 5 2 1 6 7 Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 15.0 29.0 15.0 28.0 15.0 18.0 15.0 18.0 15.0 Total Split (s) 26.0 33.0 21.0 28.0 32.0 42.0 24.0 34.0 26.0 Total Split (%) 21.7% 27.5% 17.5% 23.3% 26.7% 35.0% 20.0% 28.3% 21.7% Yellow Time (s) 3.0 3.0 3.0 3.0 4.0 4.0 4.0 4,0 3.0 All -Red Time (s) 1 A 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lead/Lag Lead Lag Lead Lag Lead Lead Lag Lag Lead Lead -Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Recall Mode None None None None None C-Max None C-Max None Act E f€ct Green (s) 17.7 24.6 12.5 19.4 24.8 44.0 19,0 38.2 55.9 Actuated g1C Ratio 0.15 0.20 0.10 0.16 0.21 0.37 0.16 0.32 0.47 vlc Ratio 0.95 0.63 0.80 0.88 0.90 0.48 0.59 0.65 0.35 Control Delay 97.7 31.6 83.2 55.1 54.5 20.1 55.7 38.5 3.5 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 97.7 31.6 83.2 55.1 54.5 20.1 55.7 38.5 3.5 LOS F C F E D C E D A Approach Delay 54.9 61.4 29.3 34.0 Approach LOS D E C C t[iterstirrf5utrim3ry.: Cycle Length: 120 Actuated Cycle Length: 120 Offset: 0 (0%), Referenced to phase 2:NST and 6:SBT, Start.of 1 st Green Natural Cycle: 90 Control Type: Actuated -Coordinated Maximum vle Ratio: 0.95 Intersection Signal Delay: 40.6 Intersection LOS: D Intersection Capacity Utilization 84.2% ICU Level of Service E Analysis Period (min) 15 enii+� nnrl Dhnene- 9rRn• C 1419 Gt A Pnrifir. Plum S - t m2 01 m3 m4 42 24 s 1 121 s. 33 s 1h m5 1� a6 e7 08 32 s 1 134 s 1 126s 28 s . Danville Short Plat City of Federal Way 9/11 /2007 4028: SW 336 St & 21 Av SW Horizon with Timings ---I. 4\ I t Lane Group EBL EBT WBL WBT NBL NBT SBL SBT Lane Configurations Vi +T+ tl+ tl ti� Volume (vph) 301 686 313 1110 241 544 279 596 Turn Type Prot Prot Prot Prot Protected Phases 3 8 7 4 5 2 1 6 Permitted Phases Detector Phases 3 8 7 4 5 2 1 6 Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 15.0 26.0 15.0 27.0 15.0 26.0 15:0 24.0 Total Split (s) 22.0 43.0 27.0 48.0 20.0 29.0 21.0 30.0 Total Split (%) 18.3% 35.8% 22.5% 40.0% 16.1% 24.2% 17.5% 25.0% Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 All -Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag Lead -Lag Optimize? Recall Mode None C-Max None C-Max None Min None Act Effct Green (s) 17.0 38.0 22.0 43.0 15.0 24.0 16.0 Actuated g/C Ratio 0.14 0.32 0.18 0.36 0.12 0.20 0.13 v/c Ratio 1.21 0.75 0.97 1.14 1.12 1.01 1.18 Control Delay 170.8 41.1 92.3 100.7 137.1 79.0 163.6 Queue,Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 170.8 41.1 92.3 100.7 137.1 79.0 163.6 LOS F D F F F E F Approach Delay 76.1 99.1 93.9 Approach LOS E F F Intersection Summary Cycle Length: 120 Actuated Cycle Length: 120 Offset: 100 (83%), Referenced to phase 4:W BT and 8:EBT, Start of 1 st Green Natural Cycle: 115 Control Type: Actuated -Coordinated Maximum v/c Ratio: 1.21 Intersection Signal Delay: 96.1 Intersection LOS: F Intersection Capacity Utilization 110.2% ICU Level of Service H Analysis Period (min)15 e.,r+� nn/+ Phnenc• an9R• RW IRA qt A 91 Av SW Min 25.0 0.21 1.09 96.5 0.0 96.5 F 113.7 F 01 I o2 03 o4 21 s 29 s 22 s Y48�''�` - 05 4, 06 07 08 7Q s1 130s 1 02713 Danville Short Plat City of Federal Way "2i