Loading...
23-103573Cityof Federal Way Community Development Dept. FILE 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: WATSON Project Address: 33707 32ND AVE SW Electrical Permit #:23-103573-00-EL Inspection Request Line: (253) 835-3050 Parcel Number: 954280 1160 Project Description: Electrical connection for gas to gas furnace change out and run electrical for 3-ton a/c, replace 200 amp electrical panel Owner Applicant Contractor WILLIAM WATSON JAIMIE HOWBRENNAN HEATING & A/C BRENNAN HEATING & A/C LLC 33707 32ND AVE SW 4601 S 134TH PL (ELECTRICAL) FEDERAL WAY, WA 98023-7723 SEATTLE WA 98168 BRENNHA962DU (3/31/24) 4601 S 134TH PL SEATTLE WA 98168 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes Electrical Fixtures Alt. Serv./Feeder: 0 to 200 aml 1 Circuits - Residential 2 Thermostat PERMIT EXPIRES Tuesday, 9 January, 2024 Permit Issued on Thursday, July 13, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: K Date: cn.r or Federal Way THIS C-ARD IS TO REII_JI1 ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 535-3050 Scheduled inspections may be failed if this card is not oa-site. DO NOT LOSE IBIS CARD. Inspections are listed as close to sequential order as possible (read left to right. top to bottom). Please schedule inspections as appropriate. Work mist not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card_ ELECTRICAL Q By UFER Ground (4295) Approved Date ❑ By Ditch cover (4030) Approved Date ❑ By Slab/Concrete Floor (4255) Approved to place concrete Date Q Pool Bonding (4195) ❑ Temporary Power (4275) ❑ Service (4235) Approved Approved Approved By Date By Date By Date ❑ Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) ❑ Ceiling Corer (4020) Approved Approved Approved By Date By Date By Date 0 Final - Electrical (4055) Approved By � Date � ✓`� MECHANICAL El Mechanical Rough -in (4165) ❑ Gas Piping (4125) 3❑ Final - Mechanical (4065) Approved Approved to release test Approved By Date By Date By Date PLUMBING El Plumbing Groundwork (4190) 0 Rough Plumbing (4230) 0 Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date By Date