23-103573Cityof Federal Way
Community Development Dept.
FILE
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: WATSON
Project Address: 33707 32ND AVE SW
Electrical
Permit #:23-103573-00-EL
Inspection Request Line: (253) 835-3050
Parcel Number: 954280 1160
Project Description: Electrical connection for gas to gas furnace change out and run electrical for 3-ton a/c, replace
200 amp electrical panel
Owner
Applicant
Contractor
WILLIAM WATSON
JAIMIE HOWBRENNAN HEATING & A/C
BRENNAN HEATING & A/C LLC
33707 32ND AVE SW
4601 S 134TH PL
(ELECTRICAL)
FEDERAL WAY, WA 98023-7723
SEATTLE WA 98168
BRENNHA962DU (3/31/24)
4601 S 134TH PL
SEATTLE WA 98168
Additional Permit Information
Is this an Online or O.T.C. application? .................. Yes
Electrical Fixtures
Alt. Serv./Feeder: 0 to 200 aml 1 Circuits - Residential 2 Thermostat
PERMIT EXPIRES Tuesday, 9 January, 2024
Permit Issued on Thursday, July 13, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: K Date:
cn.r or
Federal Way
THIS C-ARD IS TO REII_JI1 ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 535-3050
Scheduled inspections may be failed if this card is not oa-site. DO NOT LOSE IBIS CARD. Inspections are listed as close to sequential order as possible
(read left to right. top to bottom). Please schedule inspections as appropriate. Work mist not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card_
ELECTRICAL
Q
By
UFER Ground (4295)
Approved
Date
❑
By
Ditch cover (4030)
Approved
Date
❑
By
Slab/Concrete Floor (4255)
Approved to place concrete
Date
Q
Pool Bonding (4195)
❑
Temporary Power (4275)
❑
Service (4235)
Approved
Approved
Approved
By
Date
By
Date
By
Date
❑
Feeders/Sub-panels (4045)
❑
Rough Electrical (4225)
❑
Ceiling Corer (4020)
Approved
Approved
Approved
By
Date
By
Date
By
Date
0
Final - Electrical (4055)
Approved
By
� Date � ✓`�
MECHANICAL
El
Mechanical Rough -in (4165)
❑
Gas Piping (4125)
3❑
Final - Mechanical (4065)
Approved
Approved to release test
Approved
By
Date
By
Date
By
Date
PLUMBING
El
Plumbing Groundwork (4190)
0
Rough Plumbing (4230)
0
Final - Plumbing (4075)
Approved to cover
Approved
Approved
By
Date
By
Date
By
Date