Loading...
23-103603Electrical City of Federal Way Permit #:23-103603-00-EL Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Inspection Request Line: (253) 835-3050 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: CAMPUS GREEN II CONDO Bldg 17, Unit A Project Address: 521 S 323RD ST Project Description: remodel condo with sub panel Parcel Number: 132151 0000 Owner Applicant Contractor KATHLEEN SMITH WILLIAM TIBBENGO HAWK ELECTRIC GO HAWK ELECTRIC (02) 521 S 323RD ST UNIT 17-A 37804 27TH PL S GOHAWHE837DN(3/15/25) FEDERAL WAY WA 98003 FEDERAL WAY WA 98003 37804 27TH PL S FEDERAL WAY WA 98003 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes Electrical Fixtures Alt. Serv./Feeder: 0 to 200 aml 1 Circuits - Residential PERMIT EXPIRES Wednesday, 10 January, 2024- Permit Issued on Friday, July 14, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date: -%N,I. CITY of +� Federal Way THIS CARD IS TO RE\I_JI\ O\-SITE Construction Inspection Record I\SPECTION REQUESTS: (253) 335-3050 Scheduled inspections ntay be failed if this card is not on -site. DO NOT LOSE TF[IS C #RD. Inspections are listed as close to sequential order as possible (read left to right. top to bottom). Please schedule inspections as appropriate. W. ork must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence- On -going inspections are logged on the back of this card - ELECTRICAL Q By UFER Ground (4295) Approved Date ❑ By Ditch cover (4030) Approved Date ❑ By Slab/Concrete Floor (4255) Approved to place concrete Date ❑ Pool Bonding (4195) ❑ Temporary Poorer (4275) ❑ Service (4235) Approved Approved Approved By Date Be Date By Date ❑ Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) ❑ Ceiling Cover (4020) Approved Approved Approved By Date By Date By Date ro Final - Electrical (4055) Approved By ^ Date 0 Mechanical Rough -in (4165) Approved By Date MECHANICAL ❑ Gas Piping (4125) Q -Final - Mechanical (4065) Approved to release test Approved By Date By Date PLUMBING ❑ Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) 0 Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date By Date