Loading...
23-104015Cityof Federal Way Community Development Dept F I L ' 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: CHAN Project Address: 31601 41ST AVE SW Project Description: 2 circuits for heat pump Electrical Permit #:23-104015-00-EL Inspection Request Line: (253) 835-3050 Parcel Number: 873198 2660 Owner Applicant Contractor HENRY CHAN WILLIAM TIBBENGO HAWK ELECTRIC GO HAWK ELECTRIC (02) 31601 41ST AVE SW 37804 27TH PL S GOHAWHE837DN(3/15/25) FEDERAL WAY WA 98023 FEDERAL WAY WA 98003 37804 27TH PL S FEDERAL WAY WA 98003 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes Electrical Fixtures Circuits - Residential 2 PERMIT EXPIRES Sunday, 4 February, 2024 Permit Issued on Tuesday, August 8, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date: Clrr OF Federal Way THIS CARD IS TO REAI-AI\ ON -SITE Construction Inspection Record INSPECTION REQUESTS: (2-3) 53-5-30:50 Scheduled inspections ma-v be failed if this card is not on -site. DO NOT LOSE TSLS CARD. Inspections are listed as close to sequential order as possible (read left to right. top to bottom). Please schedule inspections as appropriate. 'Work must not be co:-ered until it is approved. Check -,xith your inspector if yeu are unsure about anv oi'the tnspemors or the inspection sequence.. On -going. inspections are logged on the back of this card. ELECTRICAL LJ UFER Ground (4295) ❑ Ditch cover (4030) Q Slab/Concrete Floor (4255) Approved Approved Approved to place. concrete By Date By Date By Date Q Pool Bonding (4195) Q Temporary Power (4275) 0 Senice (4235) Approved Approved Approved By Date By Date By Date 0 Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) 0 Ceiling Cover (4020) Approved Approved Approved By Date BS• Date By Date ❑ Final - Electrical (4055) Approvrd B-- Date MECHANICAL ❑ Mechanical Rough -in (4165-) ❑ Gas Piping (4125) ❑7 -Final - Mechanical (4065) Approved Approved to release test Approved Br Date By Date By Date PLUMBING ❑ Plumbing Groundwork (4190) 0 Rough Plumbing (4230) ❑ Final - Plumbing (4075) Approved to corer Approved Approved By Date BS• Date By Date