Loading...
23-103501City of Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: RIGGIO Project Address: 33810 31ST AVE SW FILFElectrical Permit #:23_ 103501 00 EL Project Description: HVAC- Install Furnace and A/C Inspection Request Line: (253) 835-3050 Parcel Number: 954280 1530 Owner Applicant Contractor ANTHONY RIGGIO CRYSTAL WALTZALLRED HEATING ALLRED HEATING COOLING, ELECTRIC 33810 31ST AVE SW COOLING ELECTRIC LLC LLC (ELECTRICAL) FEDERAL WAY WA 98023-7797 505 "F" ST SE ALLREHC775LO (7/6/25) AUBURN WA 98002 37816 26TH DR S FEDERAL WAY WA 98003 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes Electrical Fixtures Alt. Serv./Feeder: 0 to 200 aml 1 Circuits - Residential 1 Thermostat PERMIT EXPIRES Saturday, 6 January, 2024 Permit Issued on Monday, July 10, 2023 ,I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of ashioton and the Ci of Federal Way. I N P Owner or agent: Date: g CITY Of . Federal Way TWS C LRD IS TO RE\I_AIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (2-3) S35-30:50 Scheduled inspections may; be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequenral order is possible (read left to right. top to bottom) Please schedule inspections as appropriate Rork must not be covered until it is approved, Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are looaed on the back of this card. ELECTRICAL 0 LTFER Ground (4295) ❑ Ditch cover (4030) ❑ Slab/Concrete Floor (42-55) Approved Approved Approved to place concrete By Date By Date By Date ❑ Pool Bonding (4195) ❑ Temporary Power (4275) ❑ Service (4235) Approved Approved Approved Bv- Date By Date By Date ❑ Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) ❑ Ceiling Cover (4020) Approved Approved Approved By Date By Date By Date Fal Final - Electrical (4055) roved By � Date MECHANICAL ❑ Mechanical Rough -in (4165) ❑ Gas Piping (4125) Q Final -Mechanical (4065) Approved Approved to release test Approved By Date By Date Bv- Date PLUMBING ❑ Plumbing Groundwork (4190) 0 Rough Plumbing (4230) 0 Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date By Date