23-103501City of Federal Way
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: RIGGIO
Project Address: 33810 31ST AVE SW
FILFElectrical
Permit #:23_ 103501 00 EL
Project Description: HVAC- Install Furnace and A/C
Inspection Request Line: (253) 835-3050
Parcel Number: 954280 1530
Owner
Applicant
Contractor
ANTHONY RIGGIO
CRYSTAL WALTZALLRED HEATING
ALLRED HEATING COOLING, ELECTRIC
33810 31ST AVE SW
COOLING ELECTRIC LLC
LLC (ELECTRICAL)
FEDERAL WAY WA 98023-7797
505 "F" ST SE
ALLREHC775LO (7/6/25)
AUBURN WA 98002
37816 26TH DR S
FEDERAL WAY WA 98003
Additional Permit Information
Is this an Online or O.T.C. application? .................. Yes
Electrical Fixtures
Alt. Serv./Feeder: 0 to 200 aml 1 Circuits - Residential 1 Thermostat
PERMIT EXPIRES Saturday, 6 January, 2024
Permit Issued on Monday, July 10, 2023
,I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
ashioton and the Ci of Federal Way.
I N P
Owner or agent: Date:
g
CITY Of .
Federal Way
TWS C LRD IS TO RE\I_AIN ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (2-3) S35-30:50
Scheduled inspections may; be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequenral order is possible
(read left to right. top to bottom) Please schedule inspections as appropriate Rork must not be covered until it is approved, Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are looaed on the back of this card.
ELECTRICAL
0
LTFER Ground (4295)
❑
Ditch cover (4030)
❑
Slab/Concrete Floor (42-55)
Approved
Approved
Approved to place concrete
By
Date
By
Date
By
Date
❑
Pool Bonding (4195)
❑
Temporary Power (4275)
❑
Service (4235)
Approved
Approved
Approved
Bv-
Date
By
Date
By
Date
❑
Feeders/Sub-panels (4045)
❑
Rough Electrical (4225)
❑
Ceiling Cover (4020)
Approved
Approved
Approved
By
Date
By
Date
By
Date
Fal Final - Electrical (4055)
roved
By
� Date
MECHANICAL
❑
Mechanical Rough -in (4165)
❑
Gas Piping (4125)
Q
Final -Mechanical (4065)
Approved
Approved to release test
Approved
By
Date
By
Date
Bv-
Date
PLUMBING
❑
Plumbing Groundwork (4190)
0
Rough Plumbing (4230)
0
Final - Plumbing (4075)
Approved to cover
Approved
Approved
By
Date
By
Date
By
Date