23-103589City of Federal Way
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name
Project Address
Project Description
SOTO
1336 SW 348TH ST
ac replacement
Mechanical
FILL-- - Permit #:23-103589-00-ME
Inspection Request Line: (253) 835-3050
Parcel Number: 542242 0260
Owner
Applicant
Contractor
ANTONIO SOTO
TAYLER MANNINGPACIFIC HEATING &
PACIFIC AIR SYSTEMS (GENERAL)
1336 SW 348TH ST
COOLING
PACIFAS093KA (9/8/23)
FEDERAL WAY WA 98023
8607 DURANGO ST SW SUITE A
8607 DURANGO ST SW
TACOMA WA 98499
TACOMA WA 98499
Additional Permit Information
Mechanical Work Valuation? .................................. 8502 Is this an Online or O.T.C. application?.................. Yes
wmpllll� -9
Mechanical Fixtures
Air Conditioners - Stand Alonf 1
PERMIT EXPIRES Wednesday, 10 January, 2024
Permit Issued on Friday, July 14, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way
Owner or agent: Date:
'/�'j yea
4& CITY or 400
Federal Way
THIS CARD IS TO REAI--UN ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 835-3050
Scheduled inspections may- be failed if this card is not on -site. DO -NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right. top to bottom). Please schedule inspections as appropriate. AWork must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are losged on the back of this card.
ELECTRICAL
❑
By
UFER Ground (4295)
Approved
Date
❑
By
Ditch corer (4030)
Approved
Date
0
By
Slab/Concrete Floor (4255)
Approved to place concrete
Date
❑
By
Pool Bonding (4195)
Approved
Date
❑
By
Temporary Power (4275)
Approved
Date
❑
By
Service (4235)
Approved
Date
❑
By
Rough Electrical (4225)
Approved
Date
❑
By
Ceiling Corer (4020)
Approved
Date
❑ FeederslSab-panels (4045)
Approved
By Date
El Final - Electrical (4055)
Approved
By Date
❑ Aechanical Rough -in (4165)❑ Gas Piping (4125) ❑ Final -Mechanical (4065)
Approved Approved to release test Z
Appror �By Date By Date ByDate
'❑ Ph mbing Groundwork (4190)
Approved to cover
By Date
PLUMBING
❑ Rough Plumbing (4230) Q Final - Plumbing (4075)
Approved Approved
By Date By Date