Loading...
23-103889City of Federal Way Commupity Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 FILE' Plumbing Permit #:23-103889-00-PL Inspection Request Line: (253) 835-3050 Project Name: TOLENTINO/BUENSUCESO Project Address: 32226 23RD AVE SW Parcel Number: 873180 1150 Project Description: repipe only no new fixture water pipes change inside house Owner Applicant Contractor DIANE TOLENTINO HARPREET KAURRED CEDAR RED CEDAR PLBG & DRAIN CLN LLC 32226 23RD AVE SW PLUMBING (PLUMBING) FEDERAL WAY WA 98023 4928 S 293RD AVE REDCECP79404 (11/24/23) AUBRUN WA 98001 4928 S 293RD AVE AUBRUN WA 98001 Bathtubs 2 Showers 2 Water Closets PERMIT EXPIRES Sunday, 28 January, 2024 Permit Issued on Tuesday, August 1, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: 0 IN I N1 Date: CITY 0* Federal Way THIS C-ARD IS TO RE]I_U'1 ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 535-3040 Scheduled inspections ma;: be failed if this card is not on -site, DO NOT LOSE THIS CARD- Inspections are listed as close to sequential order as possible (read left to right. top to bottom). Please schedule inspections as appropriate VS'ork must not be covered until it is approved. Check with your -inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are lowed on the back of this card. ELECTRICAL ❑ By L'FER Ground (4295) Approved Date ❑ By Ditch corer (4030) Approved Date ❑ Bs- Slab/Concrete Floor (4255) Approved to place concrete Date ❑ By Pool Bonding (4195) Approved Date ❑ Bg Temporary Power (4275) Approved Date 0 By Service (4235) Approved Date Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) Approved Approved By Date JBy Date Final - Electrical (4055) Approved By Date MECHANICAL El Ceiling Cover (4020) Approved By Date ❑ tlechanical Rough -in (4165) ❑ Gas Piping (4125) Q Final - \lechanical (4065) Approved Approved to release tat Approved By Date By Date I By Date PLUMBING ❑ Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) 3❑ Final - Plumbing (4075) Approved to voter Approved Approved By Date By Date By A.Tj Date $h'1�7�?s