23-103889City of Federal Way
Commupity Development Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
FILE'
Plumbing
Permit #:23-103889-00-PL
Inspection Request Line: (253) 835-3050
Project Name: TOLENTINO/BUENSUCESO
Project Address: 32226 23RD AVE SW Parcel Number: 873180 1150
Project Description: repipe only no new fixture water pipes change inside house
Owner
Applicant
Contractor
DIANE TOLENTINO
HARPREET KAURRED CEDAR
RED CEDAR PLBG & DRAIN CLN LLC
32226 23RD AVE SW
PLUMBING
(PLUMBING)
FEDERAL WAY WA 98023
4928 S 293RD AVE
REDCECP79404 (11/24/23)
AUBRUN WA 98001
4928 S 293RD AVE
AUBRUN WA 98001
Bathtubs
2 Showers
2 Water Closets
PERMIT EXPIRES Sunday, 28 January, 2024
Permit Issued on Tuesday, August 1, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: 0 IN I N1 Date:
CITY 0*
Federal Way
THIS C-ARD IS TO RE]I_U'1 ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 535-3040
Scheduled inspections ma;: be failed if this card is not on -site, DO NOT LOSE THIS CARD- Inspections are listed as close to sequential order as possible
(read left to right. top to bottom). Please schedule inspections as appropriate VS'ork must not be covered until it is approved. Check with your -inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are lowed on the back of this card.
ELECTRICAL
❑
By
L'FER Ground (4295)
Approved
Date
❑
By
Ditch corer (4030)
Approved
Date
❑
Bs-
Slab/Concrete Floor (4255)
Approved to place concrete
Date
❑
By
Pool Bonding (4195)
Approved
Date
❑
Bg
Temporary Power (4275)
Approved
Date
0
By
Service (4235)
Approved
Date
Feeders/Sub-panels (4045) ❑ Rough Electrical (4225)
Approved Approved
By Date JBy Date
Final - Electrical (4055)
Approved
By Date
MECHANICAL
El Ceiling Cover (4020)
Approved
By Date
❑
tlechanical Rough -in (4165)
❑
Gas Piping (4125)
Q
Final - \lechanical (4065)
Approved
Approved to release tat
Approved
By
Date
By
Date
I By
Date
PLUMBING
❑
Plumbing Groundwork (4190)
❑
Rough Plumbing (4230)
3❑
Final - Plumbing (4075)
Approved to voter
Approved
Approved
By
Date
By
Date
By
A.Tj Date $h'1�7�?s