Loading...
23-103675City of Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 FILE Ph: (253) 835-2607 Fax: (253) B35-2609 Project Name: MCGINN Project Address: 32482 22ND AVE SW Project Description: Electrical connection for gas to gas furnace swap out Electrical Permit #:23-103675-00-EL Inspection Request Line: (253) 835-3050 Parcel Number: 638670 0020 Owner Applicant Contractor PATRICK & BETHANY MCGINN JAIMIE HOWBRENNAN HEATING & A/C BRENNAN HEATING & A/C LLC 32482 22ND AVE SW 4601 S 134TH PL (ELECTRICAL) FEDERAL WAY WA 98023 SEATTLE WA 98168 BRENNHA962DU (3/31/24) 4601 S 134TH PL SEATTLE WA 98168 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes Electrical Fixtures Circuits - Residential 1 Thermostat 1 PERMIT EXPIRES Monday, 15 January, 2024 Permit Issued on Wednesday, July 19, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washi , gto of Federal Way 0 Owner or agent: jafqjQ�L Cate: r-1 tea, J -4k C;T.Y OF Federal Way THIS CARD IS TO REALAIN ON -SITE Construction Inspection Record INSPECTION REQITSTS: (253) 335-3050 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS (ARD. Inspections are listed as close to sequential order as possible (read left to right. top to bontom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check tivith your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. 1 111107rt01 ❑ By LTFER Ground (4295) Approved Date ❑ By Ditch cover (4030) Approved Date ❑ By Slab/Concrete Floor (4255) Approved to place concrete Date Q Pool Bonding (4195) ❑ Temporary Power (4275) ❑ Service (4235) Approved Approved Approved Bv- Date By Date By Date ❑ Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) ❑ Ceiling Cover (4020) Approved Approved Approved By Date By Date By Date Fi 1 - Electrical (4055) By /��Date MECHANICAL ❑ Alechanical Rough -in (4165) ❑ Gas Piping (4125) 3❑ -Final - Alechanical (4065) Approved Approved to release test Approved By Date By Date By Date PLUMBING l Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) ❑ Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date BY Date