Loading...
23-104083City of Federal Way FILE Community Development Dept 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Electrical Permit #:23-104083-00-EL Inspection Request Line: (253) 835-3050 Project Name: FAIRWAY 7 TERRACE CONDOMINIUMS; Unit B-8 Project Address: 2814 SW 327TH ST Project Description: Replacing a Zinsco NILO panel with a new 125A NIB panel. Parcel Number: 246950 0080 Owner Applicant Contractor STEVEN SADENWASSER TAYLOR NANCEMAUNA ELECTRIC LLC MAUNA ELECTRIC LLC 2814 SW 327TH ST UNIT B-8 17810 110TH STREET CT E MAUNAEL809CJ (2/11/24) FEDERAL WAY WA 98023 BONNEY LAKE WA 98391 17810 110TH ST CT E BONNEY LAKE WA 98391 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes Electrical Fixtures Alt. Serv./Feeder: 0 to 200 aml 1 PERMIT EXPIRES Tuesday, 6 February, 2024 Permit Issued on Thursday, August 10, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the wi, be in accordance with the laws, rules and regulations of the State of i �n E Federal Way. Owner or agent: Date: CITY nr Federal Way THIS CARD IS TO REM_2I1 ON -SITE Construction Inspection Record INSPECTION REQUESTS: (21-53) 83-5-3050 Scheduled inspections nix: be failed if this card is not on -site. DO NOT LOSE TEES CARD. Inspections are listed as close to sequential order as possible (read left to right. top to bottom), Please schedule inspections as appropriate. Work must not be covered until it is approved. Check -with your inspector if you are unsure about am of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. ELECTRICAL Q By LIFER Ground (4295) Approved Date ❑ By Ditch cover (4030) Approved Date 0 By Slab/Concrete Floor (4255) Approved to place concrete Date 0 Pool Bonding (4195) ❑ Temporary Poker (4275) ❑ Service (4235) Approved Approved Approved By Date By Date By Date ❑ FeederslSab panels (404� ❑ Rough Electrical (4225) ® Ceiling Cover (4020) Approved Approved Approved Bp Date By Date By Date ❑ Final - Electrical (4055) Approved By Date MECHANICAL ❑ 'Mechanical Rough -in (4165) ❑ Gas Piping (4125) ❑3 Final -Mechanical (4065) Approved Approved to release test Approved By Date By Date By Date PLUMBING ❑ Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) ❑ Final - Plumbing (4075) Approved to cover Approwd Approved By Date By Date Bi- Date