Loading...
06-101077_1 FILE CITY OF CITY HALL ` 33325 8th Avenue South �. Federal Way Mailing Address: PO Box 9718 Federal Way, WA 98063-9718 (253) 835-7000 www.cityoffederalway.com May 12, 2006 Doug Garner Hammes Company 1325 4 h Avenue, Suite 1035 Seattle, WA 98101 RE: File #06-101077-00-UP; DIRECTOR'S DECISION St. Francis Hospital Loading Dock Reconfiguration & Mechanical Room Construction 34515 9`h Avenue South, Federal Way, WA Dear Mr. Garner: The City has completed Process I Land Use Review and conditionally approves the proposed loading dock relocation and mechanical equipment room construction at the existing Hospital located at 34515 91h Avenue South. Formal plans were submitted on March 7, 2006, and a resubmittal received on April 13, 2006. The zoning for the site is Office Park (OP). The hospital use is permitted within the OP zoning district pursuant to Federal Way City Code (FWCC) Section 22-831 "Hospital." The applicant proposes to relocate the loading dock to accommodate a future ICU/PCU expansion, and to cover the dock with a metal canopy. In addition, the applicant proposes to construct within the central plant area on the northwest side of the building a new 1,040 square -foot electrical switch gear room to accommodate a new generator along with new air cooled chiller. This building is proposed to be constructed of CMU walls. The building and the new canopy will be painted consistent with the existing building colors. As noted, the loading dock relocation is proposed as phase one of an ICU/PCU expansion to be located over the existing Emergency Room portion of the Hospital. With the ICU/PCU expansion, exiting paths must be established at the loading dock to accommodate the future expansion. Required exit paths from the ICU/PCU expansion cannot cross the loading dock unless there are other conforming exits we are not aware of. Therefore, a ramp shall be provided from the easternmost corner of the loading dock to the ground level as depicted on the red -lined site plan. Alternatively, an exit path location outside of the loading dock can be identifed by the applicant. A building permit is required for the proposed Phase I improvements.' The proposed improvements do not reduce required parking, landscaping, buffering, open space, or public areas; do not change the location of utilities or easements; are consistent with and support the approved architectural design; and creates no impacts to sensitive areas or significant -trees. As conditioned, the loading dock reconfiguration will maintain existing and future building egress and pedestrian connection. Based on the City's review, the Process I application to relocate the loading dock and construct a building to house mechanical equipment is conditionally approved as follows: Construction permit 06-102054-CO has been submitted and is under review. Mr. Garner May 12, 2006 Page 2 Condition of Approval Prior to issuance of construction permits, an exit ramp shall be depicted on the construction drawings based on the red -lined plan sheet A-102 dated April 10, 2006, prepared by Callison Architecture, Inc., unless an alternative exiting path outside of the loading dock is approved by the Building Department. This decision shall not waive compliance with future City of Federal Way codes, policies, and standards relating to this project site. The effective date of decision is May 15, 2006, or three days from the date of this letter. Pursuant to FWCC Section 22-355(a), any person who received notice of the administrative decision may appeal this decision to the Federal Way Hearing Examiner by May 29, 2006 (14 days from the effective date of decision). In that you are the only party of record, you may waive your right to appeal by submitting a letter to this effect to the City of Federal Way, Department of Community Development Services. If you waive your right to appeal, you may begin work on May 15, 2006, assuming you have obtained the necessary building permit approvals. Additional hourly Process I fees in the amount of $198 (4.0 hours at $66 per hour less a one -hour deposit of $66.00) are due at this time and shall be paid prior to building permit issuance. If you have any questions, please call Associate Planner Deb Barker at 253-835-2642. Sincerely, eazL�_ mcckt"It92 - Kathy McClung, Director Community Development Services enc: Red -lined approved site plan dated April 10, 2006, prepared by Callison Architecture Inc. Approved elevations prepared by Callison Architecture, Inc. dated April 10, 2006 c: Deb Barker, Associate Planner Kevin Peterson, Public Works Engineer Scott Sproul, Assistant Building Official Greg Brozek, South King Fire Brian Asbury, Lakehaven Utility District 06-101077 Doc LD 36287 CITY OF �. Federal Way June 20, 2006 Mr. Doug Garner Hammes Company 1325 4`h Avenue, Suite 1035 Seattle, WA 98101 RE: File #06-102054-00-CO; PLANNING DEPARTMENT REVIEW St. Francis Hospital Loading Dock and Electrical Room Dear Mr. Garner: FILE CITY HALL 33325 8th Avenue South Mailing Address: PO Box 9718 Federal Way, WA 98063-9718 (253) 835-7000 www.cityoffederalway.com The City has received resubmitted information for the building permit for the proposed loading dock reconfiguration and electrical room at the St. Francis Hospital in Federal Way. Process I land use approvalwas granted on May 12, 2006. The Planning Department reviews building permit applications for consistency with land use decisions. The City .ranted land use approval of the loading dock reconfiguration and new electrical room project subject to the following condition: Prior to issuance of construction permits, an exit ramp shall be depicted on the construction drawings based on the red -lined plan sheet A-102 dated April 10, 2006, prepared by Callison Architecture, Inc.; unless an alternative exiting path outside of the loading dock is approved by the Building Department. To date, as no information to address this condition has been received, I am unable to sign off on this building permit. When resubmitting, please provide five copies of any revised plans with the enclosed resubmittal form. I can be reached at 253-835-2642 if you have any questions about this letter. Sincerely, Deb Barker Acting Senior Planner enc: Resubmittal Information Form c: Scott Sproul, Assistant Building Official 06-102054 Doc, I.D. 36884 Deb barker - St. Francis Hospital Leading Dock Reconfiguration & Mechanical Room Construction {06-101077-OU-UP Rage 1 From: "Brian Asbury' <BAsbury@lakehaven.org> To: "Scott Sproul" <Scott.Sproul@cityoffederalway.com> Date: 5/25/2006 8:50:02 AM Subject: St. Francis Hospital Loading Dock Reconfiguration & Mechanical Room Construction (06-101077-00-UP) Scott, Just FYI and reiterating our previous comments on this - no side sewer permit will be required to plumb the drain from the compactor/dock area back into building plumbing, but a Discharge Agreement will need to be executed to address this 'non-standard' (and other standard) discharge configuration. Doug Garner has previously been informed of this, but I'll also follow-up with a message to him stating the same (and moving forward with the Discharge Agreement process). Let me know if you have any questions or need additional information. Brian Asbury Engineering Technician III Lakehaven Utility District http://www.lakehaven.org FAX 253-529-4081 NOTE: Lakehaven Utility District neither warrants nor guarantees the accuracy of any facility information provided. Facility locations and conditions are subject to field verification. All fees and charges subject to change without notice. CC: "Deb Barker" <Deb. Barker@cityoffederalway.com > CITY OF �. Federal April 5, 2006 Mr. Doug Garner Hammes Company 1325 4f` Avenue, Suite 1035 Seattle, WA 98101 CITY HALL �� 33325 Sth Avenue South Mailing Address: PO Box 9718 Federal Way, WA 98063-9718 (253) 835-7000 www.cityoffederalway.com Re: File #06-101077-00-UP; Complete Application/Additional Information Requested St. Francis Hospital - Loading Dock Reconfiguration/Central Plant Addition 34515 9'h Avenue South, Federal Way, WA Dear Mr. Garner: On March 7, 2006, the City of Federal Way's Department of Community Development Services received your Process I land use application reconfiguration of the existing loading dock and compactor, as well as reconfiguration of the existing central plant to include a new 1,040 square foot electrical gear switch room for the new generator and air cooled chiller for the existing hospital. The site is zoned Office Park (OP). Hospital uses are permitted pursuant to Federal Way City Code (FWCC) Section 22-831. According to code regulations, upon receipt of an application the City has 28 days to determine whether all information and documentation required for a complete application pursuant to FWCC Section 22-33 has been submitted. NOTICE OF COMPLETE APPLICATION Please consider this letter as a Letter of Complete Application. Pursuant to the FWCC, the application is deemed complete as of March 30, 2006, based on a review of your submittal relative to those requirements as set out in the Development Requirements Checklist. Having met the submittal requirements, your application is now ready for processing. The Department of Community Development Services has responsibility to notify other agencies that may have jurisdiction over your development project or an interest in it. TECHNICAL COMMENTS The following items were identified in reviewing the application for completeness. Planning Division — Deb Barker, 253-835-2642 Site Plan: The following information must be provided prior to Process I approval: 1. Depict the existing configuration of the loading dock and central plant, including existing loading dock and trash compactor locations and existing mechanical equipment units. File N06-101077-00-UP Doc. I D. 35689 Mr. Doug Garner Page 2 April 5, 2006 2. Label pedestrian connections and pathways proposed for the revised loading dock. Is there a grade change between the proposed compactor location and the western most truck bay? 3. Show full location of canopy on site plan. 4. Shear walls should be depicted if they are part of phase H. Public Works Traffic Division, Raid Tirhi, 253-835-2744 Traffic mitigation measures will be included as part of the second phase of the ICU-PCU expansion project. Please see the December 2, 2005, revised traffic comments from file #05-105889-00-PC. South King Fire and Rescue, Greg Brozek, 253-946-7241 The Fire Marshal's Office requirements will be addressed during the plan review process associated with construction permits. Lakehaven Utility District, Brian Asbury, 253-946-5407 Lakehaven's previous comments on this issue with regard to drainage from the trash compactor area still apply. If this area is not covered, then the applicant will be required to submit semi-annual discharge volume reports to Lakehaven for the purpose of monitoring precipitation flows into the sanitary sewer system. Lakehaven understands that the applicant intends to route the drainage from the trash compactor area through a pump and back into the building to connect to building plumbing, which ultimately drains to the sanitary sewer system. This will not require a Side Sewer Permit from Lakehaven as no physical connection is proposed to either an existing public sewer main or an existing building sewer line. The applicant should continue to coordinate the construction of the compactor drainage system with Lakehaven Utility District. Please note that Process I land use approval can be issued following submittal of requested information to satisfactorily address the land use comments. Please submit five copies of any requested plans, along with the enclosed resubmittal form. If you should have any questions regarding this letter or your development project, please feel free to call me at 253-835-2642. Sincerely, Deb Barker Associate Planner Enc Resubmittal Information Form c: Kevin Peterson, Public Works Engineer Raid Tirhi, Public Works Senior Traffic Engineer Brian Asbury, Lakehaven Utility District File H06-101077-00-UP Doc ID 35689 C�7 CHICAGO TlTLE"INSURANCE COMPANY 701 FIFTH AVENUE, #3400, SEATTLE, WA 98104 FJESUBMITTED ORDER NO: G�7 YOUR NO: UNIT NO: APR 3 LOAN NO: BUILDINGOF FEDERALWA-, fl PTo. SUPPLEMENTAL COMMITMENT PHONE: (206)628-5623 FAX (206)628-56.7 001153726 ST. FRANCIS HOSPITAL 10 O R D E R R E F S R S N C S I N F O R M A T I O N SUPPLEMENTAL NUMBER: 1 SELLER: PURCHASER/BORROWER: ST. FRANCIS HOSPITAL PROPERTY ADDRESS: WASHINGTON Our Title Commitment dated 01/03/05 at 8:00 A.M. is supplemented as follows: rs THE FOLLOWING PARAGRAPH(S) HAS (HAVE) BEEN ADDED TO OUR COMMITMENT: ra PARAGRAPH NUMBER 84: rr 1. LICENSE, INCLUDING THE TERMS AND CONDITIONS THEREOF: GRAR: FRANCISCAN HEALTH SYSTEM -WEST, A WASHINGTON CORPORATION GRAE: CITY OF FEDERAL WAY RECORDED: DECEMBER 16, 2005 RECORDING NUMBER: 20051216000474 AFFECTS: PARCEL B >L rr THERE HAS BEEN NO CHANGE IN THIS COMMITMENT SINCE JANUARY 3, 2005, EXCEPT THE MATTERS NOTED HEREINABOVE. DECEMBER 28, 2005 AUTHORIZED BY: MIKE HARRIS surpt=M/RDA am CHICAGO TITLE INSURANCE COMPANY 701 FIFTH AVENUE, #3400, SEATTLE, WA 98104 PHONE: {2W62&5623 FAX ({ 62&5557 ORDER NO: 001153726 YOUR NO: ST. FRANCIS HOSPITAL UNIT NO: 10 LOAN NO: SUPPLEMENTAL COMMITMENT #2 >w O R D E R R x F$ R B H C B I N F O R M A T I O N SUPPLEMENTAL NUMBER: 2 SELLER: PURCHASER/BORROWER: ST. FRANCIS HOSPITAL PROPERTY ADDRESS: WASHINGTON Our Title Commitment dated 01/03/05 at 8:00 A.M. is supplemented as follows: rs PARAGRAPH NUMBER(S) 40, 41, 42, 43, 45, 47, 50, 53 AND 55 HAS (HAVE) BEEN AMENDED AS FOLLOWS: rs PARAGRAPH NUMBER 40: a� 1. GENERAL AND SPECIAL TAXES AND CHARGES, PAYABLE FEBRUARY 15, DELINQUENT IF FIRST HALF UNPAID ON MAY 1, SECOND HALF DELINQUENT IF UNPAID ON NOVEMBER 1 OF THE TAX YEAR (AMOUNTS DO NOT INCLUDE INTEREST AND PENALTIES): YEAR: 2006 TAX ACCOUNT NUMBER: 750451-0050-03 LEVY CODE: 1205 ASSESSED VALUE -LAND: $ 660,200.00 ASSESSED VALUE -IMPROVEMENTS: $ 5,455,900.00 GENERAL & SPECIAL TAXES: BILLED: $ 75,008.26 PAID: $ 0.00 UNPAID: $ 75,008.26 AFFECTS: LOT 1 ru PARAGRAPH NUMBER 41: or 2. GENERAL AND SPECIAL TAXES AND CHARGES, PAYABLE FEBRUARY 15, DELINQUENT IF FIRST HALF UNPAID ON MAY 1, SECOND HALF DELINQUENT IF UNPAID ON NOVEMBER 1 OF THE TAX YEAR (AMOUNTS DO NOT INCLUDE INTEREST AND PENALTIES): SEE NEXT PAGE surrc:0M2/s NM9 go jw CHICAGO TITLE INSURANCE COMPANY Order No.: 1153726 Your No.: ST. FRANCIS HOSPITAL Unit No.: 10 SUPPLEMENTAL COMNIITMENT (Continued) YEAR: TAX ACCOUNT NUMBER: LEVY CODE: ASSESSED VALUE -LAND: ASSESSED VALUE -IMPROVEMENTS GENERAL & SPECIAL TAXES: AFFECTS. LOT 2 PARAGRAPH NUMBER 42: 2006 750451-0040-06 1205 $ 386,300.00 $ 0.00 BILLED: $ 6,277.56 PAID: $ 0.00 UNPAID: $ 6,277.56 3. GENERAL AND SPECIAL TAXES AND CHARGES, PAYABLE FEBRUARY 15, DELINQUENT IF FIRST HALF UNPAID ON MAY 1, SECOND HALF DELINQUENT IF UNPAID ON NOVEMBER 1 OF THE TAX YEAR (AMOUNTS DO NOT INCLUDE INTEREST AND PENALTIES): YEAR: TAX ACCOUNT NUMBER: LEVY CODE: ASSESSED VALUE -LAND: ASSESSED VALUE -IMPROVEMENTS GENERAL & SPECIAL TAXES: AFFECTS: LOT 3 PARAGRAPH NUMBER 43: 2006 750451-0030-08 1205 $ 176,900.00 $ 0.00 BILLED: $ 2,854.97 PAID: $ 0.00 UNPAID: $ 2,854.97 aff 4. GENERAL AND SPECIAL TAXES AND CHARGES, PAYABLE FEBRUARY 15, DELINQUENT IF FIRST HALF UNPAID ON MAY 1, SECOND HALF DELINQUENT IF UNPAID ON NOVEMBER 1 OF THE TAX YEAR (AMOUNTS DO NOT INCLUDE INTEREST AND PENALTIES): YEAR: TAX ACCOUNT NUMBER: LEVY CODE: ASSESSED VALUE -LAND: ASSESSED VALUE -IMPROVEMENTS: GENERAL & SPECIAL TAXES: 2006 750451-0010-02 1205 $ 217,600.00 $ 0.00 BILLED: $ 3,529.09 PAID: $ 0.00 UNPAID: $ 3,529.09 9UPLC0M2/RDA/0M n ar rs HA CHICAGO TITLE INSURANCE COMPANY Order No.: Your No Unit No.: SUPPLEMENTAL COAIIVIITMENT (Continued) AFFECTS: LOT 4 PARAGRAPH NUMBER 45: 1153726 ST. FRANCIS HOSPITAL 10 5. GENERAL AND SPECIAL TAXES AND CHARGES, PAYABLE FEBRUARY 15, DELINQUENT IF FIRST HALF UNPAID ON MAY 1, SECOND HALF DELINQUENT IF UNPAID ON NOVEMBER 1 OF THE TAX YEAR (AMOUNTS DO NOT INCLUDE INTEREST AND PENALTIES): YEAR: TAX ACCOUNT NUMBER: LEVY CODE: ASSESSED VALUE -LAND: ASSESSED VALUE -IMPROVEMENTS: GENERAL & SPECIAL TAXES 2006 750451-0060-01 1205 $ NOT AVAILABLE $ NOT AVAILABLE BILLED: $ 2,325.40 PAID: $ 0.00 UNPAID: $ 2,325.40 AFFECTS: SPECIAL TAXES FOR AS TO LOT 5 PARAGRAPH NUMBER 47: 6. GENERAL AND SPECIAL TAXES AND CHARGES, PAYABLE FEBRUARY 15, DELINQUENT IF FIRST HALF UNPAID ON MAY 1, SECOND HALF DELINQUENT IF UNPAID ON NOVEMBER 1 OF THE TAX YEAR (AMOUNTS DO NOT INCLUDE INTEREST AND PENALTIES): YEAR: TAX ACCOUNT NUMBER: LEVY CODE: ASSESSED VALUE -LAND: ASSESSED VALUE -IMPROVEMENTS GENERAL & SPECIAL TAXES: 2006 750451-0020-00 1205 $ NOT AVAILABLE $ NOT AVAILABLE BILLED: $ 4,208.10 PAID: $ 0.00 UNPAID: $ 4,208.10 AFFECTS: SPECIAL TAXES AS TO LOT 6 PARAGRAPH NUMBER 50: 7. GENERAL AND SPECIAL TAXES AND CHARGES, PAYABLE FEBRUARY 15, DELINQUENT IF FIRST HALF UNPAID ON MAY 1, SECOND HALF DELINQUENT IF UNPAID ON NOVEMBER 1 OF THE TAX YEAR (AMOUNTS DO NOT INCLUDE INTEREST AND PENALTIES): suers )WJPM /0M as az as CHICAGO TITLE INSURANCE COMPANY Order No.: Your No.: Unit No.: SUPPLEMENTAL COMMMENT (Continued) YEAR: TAX ACCOUNT NUMBER: LEVY CODE: ASSESSED VALUE —LAND: ASSESSED VALUE —IMPROVEMENTS: GENERAL & SPECIAL TAXES: 1153726 ST. FRANCIS HOSPITAL 10 2006 750451-0070-09 1205 $ NOT AVAILABLE $ NOT AVAILABLE BILLED: $ 598.32 PAID: $ 0.00 UNPAID: $ 598.32 AFFECTS: SPECIAL TAXES AS TO LOT 8 PARAGRAPH NUMBER 53: 8. GENERAL AND SPECIAL TAXES AND CHARGES, PAYABLE FEBRUARY 15, DELINQUENT IF FIRST HALF UNPAID ON MAY 1, SECOND HALF DELINQUENT IF UNPAID ON NOVEMBER 1 OF THE TAX YEAR (AMOUNTS DO NOT INCLUDE INTEREST AND PENALTIES): YEAR: TAX ACCOUNT NUMBER: LEVY CODE: ASSESSED VALUE —LAND: ASSESSED VALUE—IMPROVEMENTS- GENERAL & SPECIAL TAXES: 2006 750451-0090-05 1205 $ NOT AVAILABLE $ NOT AVAILABLE BILLED: $ 851.78 PAID: $ 0.00 UNPAID: $ 851.78 AFFECTS: SPECIAL TAXES AS TO TRACT "X" PARAGRAPH NUMBER 55: 9. GENERAL AND SPECIAL TAXES AND CHARGES, PAYABLE FEBRUARY 15, DELINQUENT IF FIRST HALF UNPAID ON MAY 1, SECOND HALF DELINQUENT IF UNPAID ON NOVEMBER 1 OF THE TAX YEAR (AMOUNTS DO NOT INCLUDE INTEREST AND PENALTIES): YEAR: TAX ACCOUNT NUMBER: LEVY CODE: ASSESSED VALUE —LAND: ASSESSED VALUE —IMPROVEMENTS: GENERAL & SPECIAL TAXES 2006 202104-9038-04 1205 $ 670,500.00 $ 0.00 BILLED: $ 7,910.74 PAID: $ 0.00 s Ul'LCOM2/RDA/0999 TCHICAGO TITLE INSURANCE COMPANY Order No.: 1153726 YourNo.: ST. FRANCIS HOSPITAL Unit No.: 10 SUPPLEMENTAL COMIVIITMENT (Continur,d) UNPAID: $ 7,910.74 AFFECTS: PARCEL B ro THE FOLLOWING PARAGRAPH(S) HAS (HAVE) BEEN ADDED TO OUR COMMITMENT: rr PARAGRAPH NUMBER 85: off 10. GENERAL AND SPECIAL TAXES AND CHARGES, PAYABLE FEBRUARY 15, DELINQUENT IF FIRST HALF UNPAID ON MAY 1, SECOND HALF DELINQUENT IF UNPAID ON NOVEMBER 1 OF THE TAX YEAR (AMOUNTS DO NOT INCLUDE INTEREST AND PENALTIES): YEAR: TAX ACCOUNT NUMBER: LEVY CODE: ASSESSED VALUE -LAND: ASSESSED VALUE -IMPROVEMENTS: GENERAL & SPECIAL TAXES: AFFECTS: SPECIAL TAXES FOR LOT 7 rp PARAGRAPH NUMBER 86: 2006 750451-0080-07 1205 $ NOT AVAILABLE $ NOT AVAILABLE BILLED: $ 1.68 PAID: $ 0.00 UNPAID: $ 1.68 ao 11. GENERAL AND SPECIAL TAXES AND CHARGES, PAYABLE FEBRUARY 15, DELINQUENT IF FIRST HALF UNPAID ON MAY 1, SECOND HALF DELINQUENT IF UNPAID ON NOVEMBER 1 OF THE TAX YEAR (AMOUNTS DO NOT INCLUDE INTEREST AND PENALTIES): rR YEAR: TAX ACCOUNT NUMBER: LEVY CODE: ASSESSED VALUE -LAND: ASSESSED VALUE -IMPROVEMENTS: GENERAL & SPECIAL TAXES: AFFECTS: SPECIAL TAXES FOR LOT 9 PARAGRAPH NUMBER 87: 2006 750451-0100-03 1205 $ NOT AVAILABLE $ NOT AVAILABLE BILLED: $ 3.00 PAID: $ 0.00 UNPAID: $ 3.00 SUPLC0Mz/RnA/0M CHICAGO TITLE INSURANCE COMPANY Order No.: Your No.: Unit No.: SUPPLEMENTAL COMMITMENT (Contiaued) 1153726 ST. FRANCIS HOSPITAL 10 OF 12. GENERAL AND SPECIAL TAXES AND CHARGES, PAYABLE FEBRUARY 15, DELINQUENT IF FIRST HALF UNPAID ON MAY 1, SECOND HALF DELINQUENT IF UNPAID ON NOVEMBER 1 OF THE TAX YEAR (AMOUNTS DO NOT INCLUDE INTEREST AND PENALTIES): ac YEAR: TAX ACCOUNT NUMBER: LEVY CODE: ASSESSED VALUE -LAND: ASSESSED VALUE -IMPROVEMENTS: GENERAL & SPECIAL TAXES: 2006 750451-0110-01 1205 $ NOT AVAILABLE $ NOT AVAILABLE BILLED: $ 3.00 PAID: $ 0.00 UNPAID: $ 3.00 AFFECTS: SPECIAL TAXES FOR TRACT Z THERE HAS BEEN NO CHANGE IN THIS COMMITMENT SINCE JANUARY 3, 2005, EXCEPT AS SHOWN HEREIN ABOVE AND ON SUPPLEMENTAL(S) 1. w APRIL 7, 2006 AUTHORIZED BY: MIKE HARRIS sVeiC0bl2lR.UAI0M CITY OF FEDERAL WAY DEPARTMENT OF COMMUNITY DEVELOPMENT SERVICES DEVELOPMENT REVIEW COMMITTEE TRANSMITTAL DATE: March 13, 2006 TO: Will Appleton, Development Services Manager Scott Sproul, Assistant Building Official Brian Asbury, Lakehaven Utility District Greg Brozek, Federal Way Fire Department FROM: FOR DR MTG. ON. - FILE NUMBER(s): RELATED FILE NOS.: PROJECT NAME PROJECT ADDRESS ZONING DISTRICT: Deb Barker March 30, 2006 06-101077-00-UP 05-105889-PC (Preapplication conference for ICU/PCU Expansion) St. Francis Hospital ICU/PCU Central Plant Expansion & Loading Dock Relocation 34515 — 9 h Avenue South [@A PROJECT DESCRIPTION: Proposed relocation of loading dock near the existing hospital loading dock to accomate future ICU/PCU expansion and compactor. Also construction of new 1,040 SF electrical switch gear room to accomoadate new generator along with new air cooled chiller, both in Central plant area on northwest side of building. LAND USE PERMITS: PROJECT CONTACT: Process I Hammes Company Doug Garner 1325 4th Avenue, Suite 1035 Seattle, WA 98101 (206) 464-4200 MATERIALS SUBMITTED: Site plan, elevations, materials sheet, undated Detailed Narrative Description St. Francis Hospital — Loading Dock Remodel / Central Plant Expansion Process I Detailed Narrative Description New construction for St. Francis Hospital will include the relocation of the existing loading dock and the expansion of the existing central plant. The existing truck ramp will be removed. The new ramp will have the same configuration as the existing with 2 truck spaces and 1 trash compactor space but will shift to the north. This shift to the north will free up space along the north wall of the existing hospital for future hospital expansion. The existing loading dock, which is currently covered, will remain whole and the new dock will be added to this existing dock. The new dock will be covered by a structural steel framed canopy. The canopy will have a built-up roof, metal siding fascia, and weather resistant soffit. The color of the fascia will match the dark colored EIFS of the existing hospital New construction will also include an addition and remodel to the existing central plant. pa O Additions inside the existing building will include a new boiler and (2) new cold w pumps. In the plant yard on the north side of the building an above ground fuel ig and air cooled chiller will be added. Also in this yard will be a new generator and switchgear building. This building will measure roughly 40'L x 23'W x 17'H. It will be constructed with split faced CMU walls with louvers as required by the electrical equipment inside. The steel frame roof with metal deck will be covered with a standing seam metal roof. The split face CMU will match the color of the Outpatient Center building on campus and the standing seam metal roof will match the light color EIFS of the existing hospital. RECEIVED MAR 0 7 2006 CITY OF FEDERAL WAY BUILDING DEPT. FCITY ederal Way RECEIVED MASTER LAND USE APPLICATION DEPARTMENT OF COMMUNITY DEVELOPMENT SERVICES 33325 8'h Avenue South MAR 0 7 2006 PO Box 9718 Federal Way WA 98063-9718 CITY OF FEDERAL WAY 253-835-2607; Fax 253-835-2609 BUILDING DEPT. m.w; v,- L yuffedcrulway_cuul APPLICATION NO(S) —f L2 S Date 3l7/Oz-- ProjectName T... �+ c s f4ca-5 i- i TAL L-1 f PG v Property Address/Location _y��- S!� [� r,.-�� �� F��� $�• �' Parcel Numbers) 75 ~- o O Z O Project Description % h ] ;: 2 -2 e_-& z: 1-2��� 'LLB A,E Type of Permit Required Annexation Binding Site Plan Boundary Line Adjustment Comp Plan/Rezone Land Surface Modification Lot Line Elimination Preapplication Conference Process I (Director=s Approval) Process II (Site Plan Review) Process III (Project Approval) Process IV (Hearing Examiner's Decision) Process V (Quasi -Judicial Rezone) Process VI SEPA w/Project SEPA Only Shoreline: Variance/Conditional Use Short Subdivision Subdivision Variance: Commercial/Residential Required Information P Zoning Designation Comprehensive Plan Designation 6 O tj Value of Existing Improvements Value of Proposed Improvements International Building Code (IBC): T -2 Occupancy Type f[r-TJConstruction Type Applicant Name: Address: City/State: Zip: Phone: Fax: Email: Signature: Agent (if, Name: Address: City/State: Zip: Phone: Fax: Email: Signature: Douglas Garner 1325 Fourth Avenue, Suite 1035, Seattle, Washington 98101 Tel 206 464 4200 Facsimile 206 464 4201 Cell 206 3213251 E-mail: dgarner@hammesco.com Name: 1= R A v-aG G ,5 c.fA h1 &4iE74i_-%-w '.57>r6z�'t' Address: l-117 So u i'�-1 .1 5 c-7L� t-=-7` City/State: _FW c-c a -z N c-J Pt Zip: 1:t54-0S-4�33 Phone: ZS-3/426-4/o( Email: RECEIVE[) Signature: Cny Bulletin #003 -August 18, 2004 Page 1 of 1 Use Application 4111kk� I CITY 4�'f Federalo, Way DEPARTMENT OF COMMUNITY DEVELOPMENT SERVICES 33325 8's Avenue South PO Box 9718 Federal Way WA 98063-9718 253-835-2607; Fax 253-835-2609 www.citvoffederalway.com DEVELOPMENT REQUIREMENTS FOR PROCESS I Director's Approval Project Name: �ct� c CF14 Project Description: n •��� - .r t� ke Z =fie P,7rr c, A44riD Applicant/Agenf- I( , ,c File No(s): (0 — t U (() 7 T LA Y • This form is to be used by an applicant as a guide in determining what constitutes a complete application for Process I, Directors Approval. • All checked items must be submitted to constitute a complete application. • Process I applications that contain all checked items will be determined complete at intake. The applicant or agent will be notified immediately if an application is considered complete. ■ A complete application does not imply compliance or conformance with applicable codes. COMPLETE APPLICATION DATE: — 0 (0 How To APPLY The applicant (owner, or owner's appointed agent) must file the following items: D—,.:.,-A Q„1,—;ftati ❑ A. Master Land Use Application [� ❑ B. A detailed narrative description of the project, on a separate 8t/2 x 11 sheet [� ❑ C. Eight copies of the site plan I� ❑ D. Submittal Fee If the project involves a new structure or changes to the exterior of an existing structure, also provide: I7—;rAd .Cnhmiftati C� ❑ E. Eight copies of existing and proposed building elevations ❑ F. Color & materials indicators (color photos or color board and materials sample) Bulletin #053 — August 19, 2004 Page 1 of 2 k:\Iandouts\Process I Development Requirements WHEN USE PROCESS I IS USED Reference to Process I is found in various places in the FWCC, indicating that certain development, activities, uses, or interpretations are permitted only if approved using Process I. Any Process I application that is not exempt from the requirements of the State Environmental Policy Act (SEPA) will be reviewed using the procedural requirements of Process III. See Federal Way City Code (FWCC) Chapter 22, Article IV-B, for a detailed explanation of Process I. WHO MAKES THE DECISION Under Process I, the Director of Community Development Services makes the decision based on review and analysis of decisional criteria and the official file. See FWCC Section 22-351 for decisional criteria. APPEALS Any decision issued by the director can be appealed. Appeals of Process I, Director's Decision, are decided by the City of Federal Way Hearing Examiner after a public hearing. See FWCC Section 22-356 for detailed information regarding appeals of Process I decisions. STAFF USE ONLY FOR PROCESS I APPLICATIONS Please consider this as a Notice of Completeness. As of , 200_, this Process I application is determined to be complete based on the minimum submittal requirements. Review of the project will begin upon application assignment. The City of Federal Way will take action on the application upon the determination that all applicable requirements are met. Please note that City review will be halted at any time City staff requests additional information. Signed: Title: THIS FORM SHALL ACCOMPANY THE LAND USE APPLICATION. A COPY OF THIS NOTICE SHALL BE PROVIDED TO THE APPLICANT OR AGENT FOR THE APPLICATION. Bulletin #053 — August 19, 2004 Page 2 of 2 k:\Handouts\Process I Development Requirements Facsia Metal Panel on Loading Dock Canopy (To match the darker colored existing EIFS) Existing Colors @ Loading Dock (Match Colors for New Construction) Standing Seam Metal Roof @ Generator Building (To'match the lighter colored existing EIFS) CMU Split -faced Block @ Generator Building (To match color of block @ Outpatient Center) Loading Dock Canopy Materials Generator Building Materials Design concept of the new canopy at the loading dock and new generator building is to match the color and materials of the existing hospital. Use of simple forms and straight forward materials. This is a support area and the attempt is to not draw additional attention to the area, a blended match will be achieved. A modification to the original materials is to use a flat metal siding at the canopy fas- cia rather than EIFS. RECEIVE: St Francis Hospital Loading Dock & Generator Bldg a 7 200 March CAT'fZUOSEDI�fiAL WAY Phase 1: Central Plant Expansion 6UILDINoDEPT,