Loading...
95-100653JC1T�Y0F,g'=.--F410010" 33530 1ST WAY SOUTH May 5, 1995 (206) 661-4000 FEDERAL WAY, WA 98003-6210 Mr. Mark Miller Mark Miller Consultants, Inc. 110 10801 Main Street, Suite 100 Bellevue, WA 98004 AV RE: Federal Way Retail Center - PRE95-0026 Dear Mr. Miller: This letter summarizes our pre -application meeting held April 27, 1995, at which time members of the Community Development Review Committee discussed general requirements that apply to your proposal. Those requirements are summarized below or are enclosed with this letter. Also enclosed is the meeting attendance sheet for your reference. In summary, you propose to construct a 200,000 square foot multi -building retail center on nine contiguous lots totalling 19.4 acres, at 34508 16th Avenue South, Federal Way. For reference, the site is zoned Community Business (BC). The proposed land uses (other retail, restaurant, fast food restaurant, entertainment, and office) are allowed pursuant to Federal Way City Code (FWCC) through a Process One approval. LAND USE (Bill Kingman, 661-4110) A Process One approval is necessary for the proposed development. Enclosed is a Master Land Use Application, Site Plan Review Drawing Requirements, and Process One Flow Chart for your reference. Process One applications are processed administratively, take approximately 120 days to process from date of complete application submittal, and conclude with a decision by the Director of Community Development Services. Process One filing fee is $1,333, payable at time of filing. Please note, Process One approval is valid for one year. Substantial completion of project construction and Process One decision conditions must be accomplished within five years of the Process One decision. If phased construction is considered, time limits may be extended. However, phasing must be discussed as part of the Process One application in order for the Director of Community Development Services to make a decision on extending the one year approval period. Mr. Mark Miller May 5, 1995 Page 2 2. A lot line elimination is necessary to eliminate all interior lot lines. Approval must be obtained prior to issuance of any related building permit. For reference, construction over property lines is not allowed. Enclosed is a Lot Line Elimination application. Lot line elimination filing fee is $100, payable at time of filing. 3. A binding site plan is not necessary provided the principle property owner retains ownership of the entire center and leases only building pads for tenant use. Binding site plan approval is necessary if ground leases are proposed or the center is divided for lease or sale purposes. Binding site plan require Process Three approval from the City Council, takes approximately five months and may be processed concurrently with the Process One application. Enclosed is a binding site plan handout for your reference. Binding site plan filing fee is $5,145, payable at time of filing. 4. A State Environmental Policy Act (SEPA) review is necessary with the Process One application. Enclosed is a SEPA checklist and handout describing how to obtain mailing labels. Please provide one set of stamped envelopes addressed to all property owners and occupants within 300 feet of the site for public notice. SEPA filing fee is $472, payable at time of filing. 5. A stream and wetland delineation and wetland report must be provided with the Process One application if any stream or wetland is within 100 feet of the site. The report, if necessary, must include all elements of FWCC Section 22-1356. Also, any delineated stream or wetland edge within 100 feet of the site must be flagged, surveyed, and the data incorporated into all submitted drawings. 6. Site design requirements. Listed below are major site design requirements. Please consult your FWCC for all requirements. * Building setbacks are 20 feet from 16th Avenue South and zero feet from all other property lines. * Building height could not be verified from submitted information. You propose building to 35 feet and architectural features possibly extending to 50 feet above grade. Building height is limited to 35 feet above average building elevation. Process Two height variance approval is necessary for architectural features taller than 35 feet above average building elevation except those allowed by FWCC Section 22-1047(2). Enclosed is methodology for calculating building height. * Exterior building wall facade modulation is necessary for all building walls longer than 50 feet. Minimum building wall modulation is three feet deep, minimum four feet wide, and maximum 35 feet wide for every 50 foot long wall section. * There is no floor area ratio requirement for the proposal. * If Retail #11 building includes a drive -through window, provide detail drawings with the Process One application for city review. * Storefront elements of Retail # 8, 9, 10 and 11 must face 16th Avenue South. Blank walls facing the street will not be supported. Mr. Mark Miller May 5, 1995 Page 3 * Concrete retaining walls or fencing around the surface water retention/detention pond adjacent 16th Avenue South will not be supported. * Proposed parking count could not be verified from submitted material. For reference one stall per 300 square feet of gross floor area is necessary for general ietail, one stall per 80 square feet for fast food, one stall per 100 square feet for restaurant, one stall per 200 square feet for medical, dental, or veterinary office, one stall per 300 square feet for other office, and case by case basis for entertainment uses. * Full size parking stalls must be at least 81/2 by 18 feet. Compact stalls must be at least 8 by 15 feet. No more than 25 percent of the proposed parking may be compact size. Please note, these dimensions are based on a 251/2 foot wide two way drive aisle. * Curbing is necessary around all parking areas. * Sidewalks are not necessary between every other row of parking stalls. * A five foot wide sidewalk is necessary from 344th Street to Retail #1 and 8 buildings, from 16th Avenue South to Retail #8 and 10 buildings, along south side of Retail #5 to 6 buildings, west side of Building #1, along the north side of 347th Place South from the Dairy Queen site to Retail Building #7, and both sides of the 16th Avenue South main entrance. * A five foot wide sidewalk, excluding car overhang, is necessary between all parking areas and proposed buildings. This may be accomplished by installing wheelstops two feet from the sidewalk or widening the sidewalk two feet and not installing wheelstops. * Several trash enclosures, with minimum 1,000 square foot area set aside for recycling purposes, must be provided. The enclosure must be six feet tall, concrete, and include steel frame doors. Please contact Federal Way Disposal at 839-1000 to determine appropriate number of enclosures, enclosure location, and dimensions. * Trash enclosure must be screened with appropriate landscaping. * Trash enclosures may not be located in building setback areas. * Screening wall must be provided for Retail #4 building. * Solid sight obscuring screening must be provided for all rooftop equipment. * All lights must be shielded to prevent offsite glare. 7. A landscape plan must be submitted with the Process One application. Several landscape requirements are listed below. Please consult your FWCC for all requirements. * A significant tree inventory and tree retention plan, pursuant to FWCC Section 22-1568, must be prepared for submittal with the Process One application. This plan will be used to determine whether or not replacement trees are necessary. Replacement trees will be necessary if more than 75 percent of the significant trees will be removed. For reference, significant trees are greater than 12 inch diameter as measured 4.5 feet above the ground, in good health, and not detrimental to the community. Red alder, cottonwood, poplar, and big leaf maple are not significant regardless of their size. Replacement trees are either 12 foot tall evergreen or 31/2 inch diameter deciduous. * Landscape plan must be coordinated with the utility and drainage plan. Trees are not allowed over utility lines. Mr. Mark Miller May 5, 1995 Page 4 * Five feet of Type Three landscape material is necessary along the west, south, and north property lines, except as noted in this letter. * Landscaping along the north property line, running west 50 feet from the west end of the service entrance, must include Type One material. * Landscaping at the northeast corner of the site must include 15 feet of Type One material. * Landscaping along the east property line, and abutting the truck parking area along the south property line, must include five feet of Type One material. * Minimum 25 percent of proposed landscaping must be drought tolerant and grouped together, with exception of lawn for sod areas. All parking lot landscaping must be drought tolerant. Drought tolerant landscaping must be hand irrigated for one year to insure its success. * Deciduous trees must be 1.5 inch caliper at 4.5 feet above ground and evergreen trees six feet tall at time of planting. * Large shrubs must be 24 inches tall, medium shrubs 18 inches tall, and small shrubs 12 inches tall at time of planting. * Groundcover must be planted and spaced to attain 100 percent coverage within three years of planting. * Maximum 75 percent of proposed landscaping may be sod lawn. * Automatic irrigation system is necessary for all permanent lawn or sod areas. * Parking lot landscaping area calculations must be submitted with the Process One application. Twenty-two square feet of landscaping per stall is necessary within each respective parking lot, as measured within the curb line. Landscaping adjacent internal sidewalks within parking area, perimeter landscaping in excess of the minimum required, and water quality areas immediately adjacent to parking area may not be included. * A three foot tall berm or equivalent landscaping is necessary between all right-of-ways and parking areas to provide a solid sight obscuring screen for parked cars. * Building walls greater than 240 square feet that are uninterrupted by windows, doors, or other architectural features and not located on a property line must be screened by trees, shrubs, and groundcover appropriate for area proposed. 8. Signs are reviewed through separate permits. Please contact Richard Cottage, Code Compliance Officer, at 661-4017 to discuss sign allowances. PUBLIC WORKS DEPARTMENT (Ron Garrow, 661-4137) Drainage 1. The site will develop more than 5,000 square feet of impervious surface area and the resulting runoff from the site would increase more than 0.5 cfs for a 100-year storm event. Consequently, you must provide on -site detention facilities for the storm drainage system. Mr. Mark Miller May 5, 1995 Page 5 All storm drainage facilities shall be designed in accordance with the King County Surface Water Design Manual (KCSWDM) and any other criteria provided below. As part of the submittal for Process One approval, you should submit a narrative on the relevance to the site of all core and special requirements listed in the KCSWDM and a Level 1 drainage analysis. In lieu of providing on -site detention facilities and provided that regional facilities are available, you may pay a pro -rate share to the development of the regional facilities downstream of the site. You will also be required to conduct a Level 2 drainage analysis from the site to the regional facility. If this analysis indicates any deficiencies caused by the increase in runoff from the subject site, you will be required to upgrade the system in those locations to the ultimate system configuration to handle runoff from the entire basin. You may use whatever analytical information is available from the city on the downstream system to assist in the analysis. 2. The site is located in the West Branch Hylebos Creek Sub -Basin as defined in the Executive Proposed Basin Plan, Hylebos Creek and Lower Puget Sound (Plan). The site is also located in an area identified for implementation of supplemental, on -site detention standards. If on - site detention control is used, the detention facility shall be designed in accordance with recommendation BW-3 of the Plan which requires the facility to be sized to detain the runoff from the site for a 24-hour, 100-year storm event and release the water at a rate no greater than 70 percent of the predeveloped two-year runoff rate. A 30 percent factor of safety need not be used in the sizing. 3. The site will be required to provide all the necessary treatment facilities for the storm water runoff in accordance with the KCSWDM. This will include biofiltration swales and may require the use of a wetpond if the site meets the criteria in Special Requirement #5. The use of a wetvault in lieu of a wetpond will not be accepted by the city. Also, the use of a coalescing plate separator will be required if the site develops five -acres or more of impervious surface area subject to vehicular traffic. In the preapplication material, you made a statement that a compost stormwater filter may be substituted for either the biofiltration swale, the wet pond, or both. This type of system has not been approved by the City of Federal Way. Any use of such a system would need to be through the approval of a variance. A previous development proposed such a use due to limited space as a result of lot size constraints and not overdevelopment of the site. The rationale for the use of the compost stormwater filter for this site appears tenuous. 4. The site is located along a ridge which divides runoff from the site and directs it in two separate directions. Development of the site will require the continuation of this runoff orientation with appropriate controls for each sub -basin. Mr. Mark Miller May 5, 1995 Page 6 Streets 5. The site will front onto 16th Avenue South. This street is classified as a Major Arterial and is fully developed except for sidewalks and street trees. You will be required to upgrade 16th Avenue South to city standards by widening the sidewalk to eight feet in width for the entire frontage of the site and provide street trees at 30 feet on centers to be located behind the sidewalk. 6. The site fronts onto South 344th Street to the north. This street is classified as an Industrial/Commercial street and is not fully improved. Partial improvements were installed by the Cash and Carry Warehouse to the north of the street a little more than a year ago. You will be required to complete the improvements to South 344th Street for the entire frontage of the site. This will require installation of pavement to 40 feet in width, 20 feet either side of the centerline of the right-of-way, vertical curbs, gutters, six-foot landscape strips, five-foot sidewalks, street trees at 30 feet on centers, illumination, and associated storm drainage facilities, all on both sides of the street centerline. Tapers from the terminus of these improvements at the east end of the site will also be required. No half street improvements will be permitted. 7. All overhead utilities shall be underground for the entire frontage of the site on both 16th Avenue South and South 344th Street. 8. South 347th Place is a private access roadway and shall be improved along the frontage of the site in conformance with the standards for an Industrial/Commercial roadway. Traffic 9. You will be required to conduct a Traffic Impact Analysis (TIA) for the proposed development. A scoping sheet for guidance as to the development of this TIA will be provided by the city's traffic division if the applicant decides to go forward with the proposed project. Please contact Saeid Daniari, Traffic Engineer, at 661-4133 for the scoping sheet. 10. The most northerly driveway on 16th Avenue South as depicted on the submitted plan will not be supported and must be deleted from the proposal. Also, the southerly driveway just south of retail pad #11 should be relocated further north to a point equidistant between the driveway north of retail pad #10 and South 347th Place. Miscellaneous 11. Plans to be submitted for construction permits shall be designed at a scale of 1" =20' or larger for both the site and the street improvements. 12. All topographic information shall be provided on KCAS datum. Mr. Mark Miller May 5, 1995 Page 7 BUILDING DIVISION (Hap Watkins, 661-4113) Comments enclosed. LAKEHAVEN UTILITY DISTRICT (Mary Cossette, 941-2288) Comments enclosed. FIRE DEPARTMENT (Greg Brozek, 946-7334) Comments enclosed. Thank you for your participation in the pre -application process. As you know, this is a preliminary review only and does not take the place of the full review that follows formal application. We look forward to working with you on this project. Should you have any questions, please contact me at 661-4110, or other staff person as appropriate. Respectfully, Bill Kingman, AICP Associate Planner enc: Meeting Attendance Sheet Master Land Use Application Site Plan Drawing Requirements Process One Flowchart Lot Line Elimination Application Binding Site Plan Handout SEPA Checklist Procedure for Obtaining Mailing Labels Methodology for Calculating Building Height Building Division Memo Lakehaven Utility District Memo Fire Department Memo c: Ron Garrow, Senior Development Engineer Hap Watkins, Senior Building Inspector Mary Cossette, Lakehaven Utility District Greg Brozek, KC Fire District #39 PRH9526.Ll dw 13 Z L),�-- �-IPT 4� 69 Ole L776- CAM,�Jv gl%ll 7 w 4- i�a,--k 4=x4- - -- ! �� ��►�- rat + III- n: ,�� �.� �s -� � ��-��. LOA 05 U-sv, Acfailv `6+Y -� (a (el- 4107 DATE: k CITY OF FEDERAL WAY DEPARTMENT OF COMMUNITY DEVELOPMENT SERVICES MEMORANDUM April 12, 1995 �•••�•b+wieif I Ulm V LL'vrlri Lid1 MNY 2- W45 Community Development Review Committee (CDRC) Members Kathy McClung, Land Use Administrator Ron Garrow, Senior Development Engineer Dick Mumma, Building Official Mary Cossette, Supervisor of Technical/Support Services, Lakehaven Utility District Pat Kettenring, Fire Marshal, KC Fire District #39 Steve Maxwell, Crime Prevention Unit, Federal Way King County Police Tina Piety, Administrative Assistant . /Y-,:;, -FR$A4: ?D_' Bill Kingman, Associate PlannerV PROJECT PLANNER: Bill Kingman PHONE: 661-4110 PLEASE RESPOND BY: April 20, 1995 FILE NUMBER: PRE95-0026 PROJECT NAME: Federal Way Retail Center PROJECT ADDRESS: 34508 16th Avenue South PROJECT DESCRIPTION: New 200,000 square foot retail shopping center on a 19.5 acre site. PROJECT CONTACT: Mark Miller, Mark Miller Consultants, 10801 Main Street, Suite 100, Bellevue, WA 98004, phone: 455-1724. SEPA: SEPA will be required. NOTE: The preapplication meeting with the applicant is 9:00 am, April 27, 1995. PRE9526.Ml TECHNICAL REVIEW COMMERCIAL Agenda Date: April 27, 1995 Subject: Federal Way Retail Center/PRE95-0026 To: Community Development Review Committee From: Greg Brozek, Fire Marshal's Office WATER SUPPLIES FOR FIRE PROTECTION Fire hydrants shall be in service PRIOR to the start of combustible construction. [UFC 10.5021 Existing fire hydrants on public streets are allowed to be considered as available for the project. Existing fire hydrants on adjacent properties shall not be considered available unless fire apparatus access roads extend between properties and easements are established to prevent obstructions of such roads. [UFC Appendix III-B] A Certificate of Water Availability shall be provided indicating the fire flow available at the site. [UFC 10.4021 When any portion of the facility or building protected is in excess of 150 feet from a water supply on a public street, as measured by an approved route around the exterior of the facility or building, on site fire hydrants and mains capable of supplying the required fire flow shall be provided. [UFC 10.4011 Hydrants shall be located not more than 300 feet on center. Such distances shall be measured on the path of vehicular access. * Hydrants shall not be located closer than 50 feet to any building. * Hydrants shall not be obstructed by any structure or vegetation, nor shall the visibility of the hydrant be impaired for a distance of 50 feet in the direction of vehicular approach to the fire hydrant. * Fire hydrant locations are subject to the approval of the Fire Marshal or his/her designee. [Administrative Policy 10.0041 When exposed to vehicular damage, fire hydrants shall be suitably protected. [UFC 10.105d] FIRE DEPARTMENT ACCESS ROADWAY Plans for fire apparatus access roads shall be submitted to the fire department for review and approval prior to construction. [UFC 10.2021 During construction, an all-weather fire department access roadway is required when any portion of an exterior wall of any facility, building or portion of a building is more than 150 feet from a fire department access roadway. [UFC 10.2031 EXCEPTION: provisions for a sprinklered building. All fire department access roadways shall be constructed of an all-weather surface capable of supporting a 25 ton vehicle; the maximum roadway grade shall not exceed 12 percent. * All fire department access roadways shall have (1) a clear and unobstructed width of not less than 20 feet, (2) an overhead clearance of not less than 13 feet six inches, (3) all turns or bends shall be designed at not less than a 32 foot inside and 40 foot outside turning radius. * All fire department access roadways which have dead ends exceeding 150 feet shall be provided with a cul- de-sac at the dead end. All such cul-de-sacs shall be not less than 80 feet in diameter. [Administrative Policy 10.0061 Designated fire lanes may be required for emergency access. This may be done during the plans check or after the facility is in operation. [Federal Way City Code Chapter 15, Article IV, Division 31 When required, approved signs or other approved notices shall be provided and maintained for fire apparatus access roads to identify such roads and prohibit the obstruction thereof. [UFC 10.2061 Gated access to the complex shall meet the following conditions: A: Gates when fully opened shall not reduce the required 20 foot width of the access road. B: Locking or securing of gates shall be in a manner approved by the Fire Prevention Division. [Administrative Policy 10.0031 AUTOMATIC FIRE SUPPRESSION SYSTEMS Plans and specifications for fire alarm systems, automatic fire -extinguishing systems, standpipes and their appurtenances shall be submitted to the fire department for review and approval prior to installation. [UFC 10.5031 An automatic fire sprinkler system shall be installed in all occupancies requiring 2,000 gpm or more fire flow or where the total floor area included within the surrounding exterior walls on all floor levels, including basements, exceeds 10,000 square feet. [Federal Way City Code Chapter 8, Article II, Division 41 Area separation walls shall not be considered to separate a building to enable deletion of the required fire sprinkler system. The automatic fire sprinkler system shall be tied into the fire alarm system (last zone) in all buildings having an automatic fire detection system. Fire Department Connections shall be located at the front of the building(s) or structure(s) served; not located on the walls of the building(s) or structure(s); and shall be identified as to the type of system served. Fire Department Connections shall not be located more than 50 feet from a fire hydrant and shall be located on the same side of the road as the fire hydrant. Fire Department Connections shall be located not less than 18 inches nor more than 120 inches from the finished edge of an approved roadway or fire lane. The inlets shall be not less than 18 inches nor more than 36 inches above the finished grade. The inlets shall face the driving surface and be protected with caps. [Administrative Policy 10.0021 Sprinkler Plans shall bear a Washington State Certificate of Competency stamp. AUTOMATIC FIRE DETECTION SYSTEM An automatic fire detection system is required in all buildings exceeding 3,000 square feet gross floor area. This system shall be monitored by an approved central station and/or remote station conforming to the current requirements of the National Fire Protection Association standards and/or the Fire Marshal or his/her designee. [Federal Way City Code Chapter 8, Article II, Division 41 Plans and specifications for fire alarm systems shall be submitted for review and approval prior to system installation. [UFC 14.103(a)] Alarm -initiating devices, alarm -signaling devices and other fire alarm system components shall be designed and installed in accordance with Uniform Fire Code Standards 14-1 and 14-2. [UFC 14.103(b).] The fire alarm control panel shall be installed at the following location: [UFC 14.103(f).] A remote fire alarm annunciator panel(s) shall be installed at the following location(s): _ [UFC 14.103(f).] Fire alarm control panel and remote annunciator panel keys shall be located in a Supra lock -box to be located [UFC 14.103(f).] The fire alarm system shall be supervised by an approved central, proprietary or remote station service. [UFC 14.1051 FIRE DEPARTMENT ACCESS TO BUILDINGS Approved numbers or addresses shall be placed on all new and existing buildings in such a position as to be plainly visible and legible from the street or road fronting the property. Said numbers shall contrast with their background. [UFC 10.3011 When access to or within a structure or area is unduly difficult because of secured openings or where immediate access is necessary for life-saving or firefighting purposes, the chief is authorized to require a key box to be installed in an accessible location. The key box shall be a type approved by the chief and shall contain keys to gain necessary access as required. [UFC 10.3021 ADDITIONAL COMMENTS: THESE COMMENTS VALID FOR 180 DAYS FROM REVIEW AND ONLY FOR THE PLANS REVIEWED. CITY OF �.. .�_ A PUBLIC WORKS MEMORANDUM TO: Bill Kingman FROM: Ronald Garrow For Your Information Date: April 25, 1995 SUBJECT: Federal Way Retail Center, PRE95-0026 The following comments are provided in response to the submittal made on a proposed shopping center on 16th Ave. S. just north of S. 348th Street. Drainage 1. The site will develop more than 5,000 square feet of impervious surface area and the resulting runoff from the site would increase more than 0.5 cfs for a 100-year storm event. Consequently, the applicant will need to provide on -site detention facilities for the storm drainage system. All storm drainage facilities shall be designed in accordance with the King County Surface Water Design"Manual (KCSWDM) and any other criteria provided below. As part of the submittal for site plan approval, the applicant should submit a narrative on the relevance to the site of all core and special requirements listed in the KCSWDM and a Level 1 drainage analysis. In lieu of providing on -site detention facilities and provided that regional facilities are available, the applicant may pay a pro -rate share to the development of the regional facilities downstream of the site. The applicant will also be required to conduct a Level 2 drainage analysis from the site to the regional facility. If this analysis indicates any deficiencies caused by the increase in runoff from the subject site, the applicant will be required to upgrade the system in those locations to the ultimate system configuration to handle runoff from the entire basin. The applicant may use whatever analytical information is available from the City on the downstream system to assist in the analysis. 2. The site is located in the West Branch Hylebos Creek Sub -Basin as defined in the Executive Proposed Basin Plan, Hylebos Creek and Lower Puget Sound (Plan). The site is also located in an area identified for implementation of supplemental on -site detention standards. If on -site detention control is used, the detention facility shall be designed in accordance with recommendation BW-3 of the Plan which requires the facility to be sized to detain the runoff from the site for a 24-hour, 100-year storm event and release the water at a rate no greater than 70 % of the predeveloped 2-year runoff rate. A 30 % factor of safety need not be used in the sizing. 3. The site will be required to provide all the necessary treatment facilities for the storm water runoff in accordance with the KCSWDM. This will include biofiltration swales and may require the use of a wetpond if the site meets the criteria in Special Requirement #5. The use of a wetvault in lieu of a wetpond will not be accepted by the City. Also, the use of a coalescing plate separator will be required if the site develops 5-acres or more of impervious surface area subject to vehicular traffic. In the submittal package from the applicant, a statement was made that a compost stormwater filter may be substituted for either the biofiltration swale, the wet pond, or both. This type of system has not been approved by the City of Federal Way. Any use of such a system would need to be through the approval of a variance. A previous development proposed such a use due to limited space as a result of lot size constraints and not overdevelopment of the site. The rationale for the use of the compost stormwater filter for this site appears tenuous. 4. The site is located along a ridge which divides runoff from the site and directs it in two separate directions. Development of the site will require the continuation of this runoff orientation with appropriate controls for each sub -basin. Streets 5. The site will front onto 16th Ave. S. This street is classified as a Major Arterial and is fully developed except for sidewalks in accordance with city code and street trees. The applicant will be required to upgrade 16th Ave. S. to city standards by widening the sidewalk to 8 feet in width for the entire frontage of the site and provide street trees at 30 feet on centers to be located behind the sidewalk. 6. The site fronts onto S. 344th Street to the north. This street is classified as an Industrial/Commercial street and is not fully improved. Partial improvements were installed by the Cash and Carry Warehouse to the north of the street a little more than a year ago. The applicant will be required to complete the improvements to S. 344th Street for the entire frontage of the site. This will require the installation of pavement to 40 feet in width, 20 feet either side of the centerline of the right-of-way, vertical durbs, gutters, 6-foot landscape strips, 5-foot sidewalks, street trees at 30 feet on centers, illumination, and associated storm drainage facilities, all on both sides of the street centerline. Tapers from the terminus of these improvements at the east end of the site will also be required. No half street improvements will be permitted. 7. All overhead utilities shall be underground for the entire frontage of the site on both 16th Ave. S. and S. 344th Street. 8. S. 347th Place is a private access roadway and shall be improved along the frontage of the site in conformance with the standards for an Industrial/Commercial roadway. Traffic 9. The applicant will be required to conduct a Traffic Impact Analysis (TIA) for the proposed development. A scoping sheet for guidance as to the development of this TIA will be provided by the city's traffic division if the applicant decides to go forward with the proposed project. Please contact Saeid Daniari, Traffic Engineer, at 661-4133 for the scoping sheet. 10. The most northerly driveway on 16th Ave. S. as depicted on the submitted plan will not be permitted and must be deleted from the proposal. Also, the southerly driveway just south of retail pad #11 should be relocated further north to a point equidistant between the driveway north of retail pad #10 and S. 347th Place. Miscellaneous 11. Plans to be submitted for construction permits shall be designed at a scale of 1" =20' or larger for both the site and the street improvements. 12. All topographic information shall be provided on KCAS datum. MEMORANDUM Date: April 18, 1995 To: Ron Garrow From: Fay Schafi Subject: Federal Way Retail Center Pre -Application Review The Pre -Application review comments for the above referenced project is as follows: 1. The proposed project will generate 986 trips during the PM peak hours. An impact of this size could result in a reduced Level of Service (LOS). As a result, we require a Traffic Impact Analysis (TIA) study to be prepared to determine the level of impact and mitigation measures. 2. Level of Service should be analyzed for the following intersection: SW Campus Drive and 7th Way SW, SW Campus Drive and 6th Ave. SW., SW Campus Drive and 1st Avenue S., S. 356th Street and Enchanted PKWY., S. 356 St. and Pacific HWY S.,S. 344th St. and 16th Ave. S., S. 336th St. and Pacific HWY. S., S. 324th St. and Pacific HWY. S., S. 320th St. and Pacific HWY. S. Level of Service should also be calculated for the SW Campus Corridor, between 1st Ave. S. and 7th Way S.W. 3, S. 344th Street, between 16th Ave. S. and 16th Ave. S. (along the frontage) should be analyzed to determine a need for a Two Way Left Turn Lane (TWLTL). 4. All driveways and access points must meet the minimum- spacing requirements. No more than two driveways is permitted along 16th Ave. S. 5. The TIA shall include a traffic signal warrant study for the proposed traffic signal at 16th Ave. S. and S. 344th St. 6. All High Accident Locations within the study area must be identified and analyzed. Accident data can be obtained from the City. 7. Mitigation measures required to improve the levels of service to acceptable levels should be identified. 8. Pipeline projects' traffic should be considered in the analysis. CC: Saeid Daniari fwreWi 4 COMMUNITY DEVELOPMENT TECHNICAL REVIEW COMMITTEE AGENDA OF: April 20, 1995 ATTN: Mr. Bill Kingman Associate Planner FROM: Lakehaven Utility District SUBJECT: Agenda Item No. 4 — Federal Way Retail Center Preapplication Meeting with Staff (PRE95-0026) COMMENTS: Water: A developer extension agreement will be required to extend water mains on —site. Sewer: A developer extension agreement will be required to extend sewer mains on —site. An Industrial User Survey (IUS) will be required for each building/retail space. Pretreatment requirements, if any, will be determined upon review of said IUS. NOTE: Copies of the District's facilities maps are attached for your convenience. By: Date: MaAE.0 sette Supervisor of Technical/Support Services K-11 R 344TH. ST. Q Q N I m �' 36 KC SP 1277092 - 7812061042 LOT 1 LOT 2 42' 1 n LOT 4 LOT 3 �O 8� + g0 _a it KC SP 6820 F - 8409200861 i �z m LOT 3 LOT 4 OLOT 1 LOT 2 6 si �. 2-2'1 O DI SPOOLS 7 86 1[lDl r 10'DI 46'- Z•I I Ae 50 3-yam KC SP 577,OOR - 7508030293 ta YIP' , LOT 1 SUPER 8 MOTEL RESTALtNT LOT z 11 15T. S . D S.R. 18 S. 348TH. 8 JCT. PSH NO 1 TO AUBURN 1 5 Cal sv +■ay a to ,cq ICU CA MP a b r� US 152- 1 r DI SQUARE ,2x10 17 b j OY77CE A9ANOONCO r_a•-, 7 d CLUB ,Dx12 1tso1 16 �1 1� 18 of ol-e L � KCSP 251074 - 8110JC LOT 1 Be LOT 2 b� a A j9 p{ 6 N 1 6 O 41 ® AIR VAC y, 101'GUL tun �1 50 4 85•-dt4 dAc fAc as 1s'5 me r& S. 3467Fi. ST. ,, 10 , J 16 t 11 a 1e 7r � 7 B � N 4 eAe Ac +c >ao CL 1 = 6 +o• 4s• m 9 vi b 20 19 1 21 e2 1x a Is 13 1 Di i i 14 r BUS �S j S. 341ST. P °C'-a �H 7 e d as �11 lr3 6 1. � 5 3 �0 S. 341 ST. PL KCSP 582058-6208090925 LOT 2 2 1 4 a0 N' LOT 1 eQ 14'-1 Y DI E k 1 _ 16 d'd LOT 1 590• era 3 t5• E'�!r• 1 a S' 15 t 2 3 SER oRa GE w Q ,. J � c r9a LOT 2 it y..p. Sl30' SIX 23 2- 5' B V c Vl m 5 co��{Y X m 4 KC Sp 8:80.2 +g0g280755 1' 12 b n N 55 COO 11 d 27• R a +r-dD, ]� 3 C aS a7 i 5� 6 TR. 1 2,° r-dd 10 7 R bTR a a 6 60 F', w-1dDI Yip fe 18 S. 3d•47ii. S Y NOTE: fIW VALVE BURIED + L H01{TH (DETECTOR CHECK VALVE) yQ � `- O ,dAC - 2 +dc RolD+c • d s1L (A&—.) wM+ D.V.VJ7.Gx 11EVIelON S DATE R..L- F�AL ' t I OF FEDWAY BOUNDARY CA'E��S C WATER F A 11-18-oi Ri'7•I [ CRY Iw ONLY) KC SP 1277092 - 7612061042 LOT 1 11 W R7.CRR. :r RP.cvrr. LOT 4 8� LOT 2 LOT 3 g0 KC SP 91320 9 - 8409200861 LOT 3 LOT 4 r li LOT 1 / 1; LOT 2 I�f! "' g I 1SPVC , gg KC SP 577100R - 7508030293 VIP'S L1DT ' 0 TEL RESTA UANT LOT z 530 , (I ST. ST. ) S.R. 18 s S. 349M. JCT. PSH NO 1 TO AUBURN 1382 CAMPUS Ir SQUARE O"7= cum 2 3cr 0 UU ! dd ( LJO, y �r CeKc er PROJECT NAME Al Ir2. 3 Ir 4. 5. 6. 9. _!i�-10. 11. ZE-DEVELOPMENT INFORIVi :'ION FEDERAL. WAY BUILDING SECTION 661-4118 6 , VV OCCUPANCY TYPE CONSTRUCTION Submit with completed application for permit, seven complete sets of plans of-24"x36" maximum dimension (include architectural, structural, electrical, drainage, utilities, and landscaping). Provide three each 8'/2"xll" and three full size site plans for addressing multiple building sites. At submittal provide two sets of structural calculations prepared by a professional engineer, registered in the State of Washington. At submittal provide two copies of soil investigations and reports, as specified in Chapter 29 of the Uniform Building Code. At submittal provide two sets of energy code calculations, including lighting budget. Washington State Energy Code (1991). Non -Residential Energy Code (NREC) effective April 1, 1994. Provide two copies of King County Health Department approved drawings. At the time of submittal, those regulations which are currently in effect shall be applicable to all project plans and specifications. The City of Federal Way has currently adopted all Uniform Codes, 199I editions. '�(� 6i�--cC-b'ue �Fqm_ 36, ( ,?qj- Washington State Disability Standards apply (WAC 51-20). Special inspection by an approved testing laboratory is required for site welding, high -strength bolting, piling operations, sprayed -on fireproofing, structural masonry, and cast -in -place concrete. Include testing lab selection and personnel credentials with building permit submittal for Building Section approval prior to construction (must be WABO certified agency and inspectors on January 1, 1994). Separate permits are required for demolition, signs, rack storage, rockeries, etc., refer to Washington State Department of L & I for electrical permits. Plumbing and mechanical hould be included on the main a plicatio for permits,, escrib�a� in 1, above. C r�� L� S� u e�� r _ 'V tl-utrS Sd��r� � /�qs' Revisions to submifted drawings will be subject to additional lan rev' ees 8xlz "x11". p f ew, ifs larger sheets than D G' Minimum estimated fireflow (gpm) 7 LTC F � 6�3� Cf Z- _ 12. Provide TWO FULL SIZE SITE PLANS APPROVED BY THE FEDERAL WAY POSTMASTER; showing approved locations, when installing gang -type mail boxes. 13. No building or portion of a building shall be occupied or used for storage prior to the issuance of the CERTIFICATE OF OCCUPANCY. A- 14. No work shall start prior to the issuance of the permit. — 15. Other: PREPARED BY - M ✓ QS DATE PREDEv.FRM A R C H I T E C T S April 3, 1995 Located on the east side of 16th Avenue South and extending from South 347th Place to South 344th Street, this currently unimproved site contains approximately 19.5 acres. The site generally slopes from the southwest corner up to the northeast corner, crests at the middle of the southeast section of the site and falls to the east. The site was identified as appropriate for Business development in February of 1990 when the City Council adopted the current Comprehensive Plan. Retail, commercial, office and many other specific and general uses were identified as appropriate for this site when Council adopted the current Land Use Regulations and designated this site as BC - Community Business. Concurrently, Council adopted the BC zoning designation for the adjacent properties to the west, south and east; the MP designation to the north with a small insertion of the RS 7.2 designation in recognition of an existing residential neighborhood. This project proposal is intended to implement the established development patterns of the Comprehensive Plan and the Land Use Regulations. It includes approximately 200,000 SF of commercial uses including neighborhood and community retail and service providers, full service and fast food restaurants, entertainment, banks and professional offices, and other uses as allowed in the zoning designation. Structures will be arranged to accommodate the needs of the retail providers, facilitate easy vehicle circulation and provide strong pedestrian linkages from the public rights -of -way and throughout the site. Parking will be provided sufficient to meet the requirements of the city and the requirements for successful )retail and service providers. Landscaping will be provided to meet and exceed the city's requirements at the public rights -of -way and all perimeter boundaries. Further, substantial landscaping will be provided within the parking areas to meet and exceed the city's requirements. Site amenities will include screened areas for dumpster and recycling bins and loading docks concealed from public view. The structures will vary in size, height, material, color and detail in a way to create interest and character, but will be bound by a common architectural concept. Building sizes will range from 2,500 SF to 80,000 SF. Height will vary from 18 feet to 35 feet with architectural features possibly extending to 50 feet. Materials will be selected for their durability and aesthetic values. No design concepts have been developed for this project to date. However, finish materials might include concrete, masonry, brick, ceramics, metals, stucco, glass and metal or concrete shingles. Building elevations facing service and truck areas will be lowered into the hillsides as much as practicable and those areas remaining exposed will be designed for ease of maintenance. Elevations facing the customer areas will be designed to create an interesting pedestrian experience and will include variations in plan to highlight display windows and entrance and provide covered walkways for weather protection along the storefronts. Building colors will be selected to be consistent with the architectural characters when designed. ASSOCIATES El Baylis, AIA Planning • Architecture • Interiors Kent Pearse, AIA Brian Brand, AIA Mitch Yockey, AIA Richard L. Wagner, AIA 10801 Main Street Bellevue, WA 98004 FAX (206) 453-8013 (206) 454-0566 Johan Luchsinger, AIA Thomas Frye, Jr., AIA Mark MillerCONSULTANTS INC. DEVELOPMENT ■ LAND USE ■ CONSTRUCTION MANAGEMENT April 3, 1995 City of Federal Way Department of Community Development 33530 1st Way South Federal Way, WA 98003 RE: Opus Northwest LLC Federal Way Retail Center On behalf of Opus Northwest LLC I am applying for a pre -application meeting with the City of Federal Way for Opus' proposed Retail Center at South 344th Street and 16th Avenue South. As part of the pre -application submittal, I am enclosing eight copies of the following items: A. Master Land Use Application with attachments; B. Opus Northwest informational brochures; C. Site plan and section drawings by project architect, Bayless Brand Wagner; D. Questions from project architect; E. Preliminary storm drainage analysis by W&H Pacific; F. Issues for clarification by W&H Pacific. We look forward to meeting with you in the pre -application meeting to discuss in detail the proposed Federal Way Retail Center. Very truly yours, MARK MILLE CONSULTANTS, INC. Mark Miller MM:pp Enclosures CC: Opus Northwest Bayless Brand Wagner W&H Pacific 10801 Main Street, Suite 100 o Bellevue, Washington 98004 ■ 206/455-1724 ■ FAX 206/455-5076 A R C H I T E C T S FEDERAL WAY RETAIL CENTR April 3, 1995 SITE DEVELOPMENT QUESDONS (1) Landscape in parking areas is required at the rate of 22 SF/stall. To meet this requirement: o . Can perimeter areas be counted if they are in excess of the minimum required � perimeter dimension? �p . Can landscaping adjacent internal sidewalks within the parking areas be counted? �° . Can water quality areas immediately adjacent the parking areas be counted? (2) Pedestrian access is required throughout parking areas. . Is the sidewalk every 2nd row requirement as shown required under the current code? (3) FAR requirements appear to have been dropped from this zone. �'� . True? ASSOCIATES El Baylis, AIA Planning Architecture • Interiors KentPearse,AIA Brian Brand, AIA Richard L. Wagner, AIA Mich Yockey, AIA Thomas Frye, Jr., AIA 10801 Main Street • Bellevue, WA 98004 • FAX (206) 453-8013 • (206) 454-0566 Johan Luchsinger, AIA April 3, 1995 Federal Way Retail Center Storm Drainage: 1. Storm drainage from the entire site will be collected and directed into the existing conveyance system at 16th Avenue So. 1 A master drainage plan will not be required and standard peak runoff control criteria in the King County Surface Water Design Manual will be the accepted design criteria. 3. Due to the previous downstream studies completed in conjunction with the downstream retail developments, the downstream analysis will be limited to a Level 1 analysis. 4. If needed, a wet vault will be acceptable for water quality management. 5. A coalescing plate will not be required due to the proposed biofiltration swale and 3-cell wetpond (or wet vault). Road Improvements: 6. No improvements to 16th Avenue South are required. 7. Half -street improvements to S. 344th Street along the property frontage will be required. What is the design standard? Plat Procedures: 8. Binding site plan process vs. lot line adjustment. d F o 1,t LM to L FEDERAL WAY RETAIL CENTER April 3, 1995 PRELIMINARY STORM DRAINAGE ANALYSIS City of Federal Way/King County Core Requirements for site development: Core Requirement #1: Discharge at Natural Location. Page 1 Surface water from the site generally flows to the southwest into the existing storm drainage system of 16th Avenue South, with a small portion of the proposed development flowing southeast. It is unclear whether drainage from this portion flows into the state right-of-way or into the private street bordering the south side of the property. The drainage characteristics of this area will be determined during the design process. However, for the purposes of this report, all proposed storm drainage features will be placed in the southwest corner of the property. Discharge is assumed to be into the existing storm drainage system in the recently widened 16th Avenue South. Core Requirement #2: Off -Site Analysis. Both upstream tributary drainage characteristics and an analysis of downstream conditions must be quantified and calculated. Estimated off -site tributary areas have been included in runoff and storage calculations. The limits of the proposed basin boundary are as follows: North: So. 344th St. West: 16th Ave So. South: Property line East: Ridge Additional off -site runoff may contribute to the drainage basin, but will require additional survey or field inspections to determine. A Level 1 downstream analysis must accompany the initial permit application. Additional downstream analysis may be required depending on the findings of the Level 1 analysis. Similar developments in the area have had to perform up to a Level 2 downstream analysis. No downstream analysis has been performed at this time. 11420501/wp/pmstorm.doc :S FEDERAL WAY RETAIL CENTER April 3, 1995 Page 2 Core Requirement #3: Runoff Control. Runoff controls must be provided to reduce developed runoff rates to pre -development peak rates. The allowable release rate is the pre -development 2-year 24-hour storm and the system must detain up to a 10-year post -development storm, plus 30%. Conveyance must be provided to allow passage for up to a 100-year storm. Runoff controls may be in the form of a detention pond, vault, or tank. In addition to the runoff control requirement, a biofiltration swale must also be constructed to enhance the quality of runoff leaving the site. Biofiltration and detention requirements and alternatives are discussed further below. Core Requirement #4: Conveyance System. A conveyance system will be designed during the preliminary drawing phase. Required at the downstream end of the conveyance system is at least one oil/water separator prior to discharge off the site. Core Requirement #5: Temporary Erosion and Sedimentation Control. An approved temporary erosion control plan will be required with the construction drawings. Core Requirement #6: Maintenance and Operation. Maintenance and operation of all drainage facilities will be the responsibility of the property owner. A maintenance and operation manual is usually only required for special design items, such as a water storage vault, compost stormwater filter, or other special oil/water separators. Core Requirement # 7: Bonds and Liability. All storm drainage systems must be constructed in conformance with the bond and liability requirements of King County Code. 11420501 /wp/preetorm.doc W&H PACIFIC FEDERAL WAY RETAIL CE1V'I'ER April 3, 1995 Page 3 In addition to the Core Requirements, the following Special Requirements may be applicable to the proposed development. Special Requirement #5: Special Water Quality Controls. A wetpond or wetvault is required if the proposed development discharges to and is within one mile of a Class 1 or Class 2 stream. Hylebos Creek is listed as a Class 2 stream with salmoniods and is within one mile of the proposed development. It has been assumed that runoff from the site eventually enters Hylebos Creek and therefore and wetpond or wetvault will be required. Wetponds and wetvaults are discussed further below. Special Requirement #6: Coalescing Plate Oil/Water Separators. If the proposed development will result in more than 2,500 vehicle trips per day, then a coalescing plat or equivalent oil/water separator is required prior to discharge from the site. A retail center of this size typically results in more than 2,500 vehicle trips, and a coalescing plate will most likely be required. The coalescing plate may be substituted for the oil/water separator required under Core Requirement #4. 11420501/wp/preetorm.doc FEDERAL WAY RETAIL CENTER April 3, 1995 Storm Water Detention Requirements Page 4 Storm water detention may be in the form of either a pond, vault, or tank. Because of the size of facility required and the proposed use of the property, an underground vault is the most feasible option. The following conditions were used to approximate the amount of storage required. Existing Site Conditions: On -Site Area: 18.55 Ac Cn=60 (2nd growth & brush, soil group AB) Off -Site Area: 5.81 Ac C,,=60 24.36 Ac Proposed Conditions: On -site Area: 18.55 Ac Ca=98 (impervious) Off -site Area: 5.81 Ac Co=60 24.36 Ac Based on the existing topographic information, an allowable release rate equal to the runoff from a 2-year pre -development storm, and storage for a 10-year post -development storm plus 30 %, a total volume of 213,000 CF of stormwater storage is required. Possible detention vault sizes are as follows: Stormwater Detention Vault Depth, Length Width 7' 1480' 24' 8' 1269' 24' 9' 1110, 24' 10, 987' 24' ' Includes 1 ft. of freeboard. An equivalent detention pond would be approximately 150 feet by 225 feet, 10 feet deep, 3:1 side slopes. 11420501/wp/prestorm.doc n t. FEDERAL WAY RETAIL CENTER April 3, 1995 Biofiltration Reguirements Page 5 The biofiltration requirement may be satisfied using a biofiltration swale. The bio-swale must be designed to pass a 2-year storm. If biofiltration takes place after detention, the facility must pass a 2-year pre -development storm (equal to the release rate of the detention facility). If placed before detention, it must pass a 2-yearpost-development storm. Therefore the most economical placement of the biofiltration facility is after detention. However, the biofiltration swale must, in all cases, be placed before a wetpond or wetvault. If the bio-swale is placed after the detention vault, it may be smaller, but either a second vault (wetvault) or wetpond must follow the bio-swale. If it is placed before the detention vault, the swale must be larger to accommodate greater flows, and the vault would have to be increased in size to accommodate the dead storage requirement. Typical bio-swale dimensions that would satisfy the requirements are as follows: Post -Detention Bio-Swale Bottom Width 8' Top Width 15' Side Slopes 3:1 Water Depth .08' Swale Slope 2 % Length 50' (minimum allowed) Pre -Detention Bio-Swale Bottom Width 16' Top Width 22' Side Slopes 3:1 Water Depth .33' Swale Slope 2% Length 200' 114205011wp/prestorm.doc W&H PACIFIC FEDERAL WAY RETAIL CENTER April 3, 1995 Page 6 Wet Pond/Wet Vault Requirements Dead storage in the form of either a wetpond or wetvault must be provided because of the proximity of the proposed development to Hylebos Creek. The surface area of a wetpond/wetvault must be at least one percent of the total proposed impervious area and it must contain a storm volume equal to one-third of the volume resulting from a 2-year post - development storm. This is in addition to the stormwater detention requirements discussed above. These requirements result in a pond with a surface area of 8,060 square feet and a volume of 34,000 CF. Alternatively, the detention vault may be increased in size to accommodate an additional 34,000 CF of storage. As discussed above, if a combination detention vault/wetvault is chosen, a bio-swale must be constructed before the vault, resulting in a larger swale than if it were constructed after the vault. If a wet pond is constructed, the detention vault would be smaller and the bio-swale could be constructed after the vault with smaller dimensions. A wetpond would be a typical three -cell pond constructed at the end of the drainage system. The City of Federal Way has expressed a preference for above ground ponds. A 3-cell pond that would accommodate the requirements could have the following dimensions: Wetpond Dimensions Water Surface Area: 8,060 sf (divided into 3 cells) Volume: 34,000 cf Water Depth: 4.2 ft If the dead storage is to be contained within the vault, the possible vault sizes increase as follows: Combination Detention/Wetvault Depth, Length Width 7' 1717' 24' 8' 1471' 24' 9' 1288' 24' 10, 1144' 24' 11' 1030' 24' 12' 936' 24' ` Includes 1 ft. of freeboard. 11420501/wp/prestorm.doc 0 W&H PACIFIC FEDERAL WAY RETAIL CENTER April 3, 1995 Notes Page 7 1. Storm drainage from building roofs may bypass the water quality features (wet pond/vault and bio-swale) but may not bypass the detention facility unless rooftop detention is provided. The calculations for the proposed detention facility include runoff from rooftops, however if rooftop detention is provided runoff from those areas could be eliminated from the calculations, and the proposed detention facility may be significantly reduced in size. 2. A compost stormwater filter may be substituted for either the biofiltration swale, the wet pond/vault, or both. The filter has been approved for use within King County but has not been used in the City of Federal Way yet. Use of a compost stormwater filter for either or both of these facilities will reduce construction costs and land -area requirements, but will require a variance from the City prior to approval. 3. The calculations performed are a first-time run using available information and are intended to provide an estimate of the approximate size and type of stormwater facilities that will be required by the City of Federal Way. It should be anticipated that the calculations and results may be modified and refined throughout the design process. 4. Design and calculations is in conformance with the Surface Water Design Manual, King County Department of Public Works, latest revision (November, 1994). 11420501/wp/preetorm.doc Creative Solutions ... Superior Servio,- 1 1 PACIFIC 3025-112th Avenue N.E. P.O. Box C-97304 (206) 827-0220 •Planning Bellevue, WA 98009-9304 Fax (206) 8221-5341 • Engineering • Environmental Services •Surveying • Landscape Design r 1 i Project' Date: A-?F=i L Sheet No. I of • Checked bv: Job No Prepared by: Ztk-V : I OS'al _ CITY OF FEDERAL WAY DEPARTMENT OF COMMUNITY DEVELOPMENT SERVICES MEMORANDUM DATE: April 12, 1995 TO: Community Development Review Committee (CDRC) Members Kathy McClung, Land Use Administrator Ron Garrow, Senior Development Engineer Dick Mumma, Building Official Mary Cossette, Supervisor of Technical/Support Services, Lakehaven Utility District Pat Kettenring, Fire Marshal, KC Fire District #39 Steve Maxwell, Crime Prevention Unit, Federal Way King County Police Tina Piety, Administrative Assistant FROM: Bill Kingman, Associate Planner *t/ PROJECT PLANNER: Bill Kingman PHONE: 661-4110 PLEASE RESPOND BY: April 20, 1995 FILE NUMBER: PRE95-0026 PROJECT NAME: Federal Way Retail Center PROJECT ADDRESS: 34508 16th Avenue South PROJECT DESCRIPTION: New 200,000 square foot retail shopping center on a 19.5 acre site. PROJECT CONTACT: Mark Miller, Mark Miller Consultants, 10801 Main Street, Suite 100, Bellevue, WA 98004, phone: 455-1724. SEPA: SEPA will be required. �` s NOTE: The preapplication meeting with the applicant is 9:00 am, April 27, 1995. PRE9526.M1 ��\ MAST'�R LAND USE APPLICATION Cie. CfrV OF �0 APPLICATION NO. cj iOO kJ& So DEPARTMENT OF COMMUNITY DEVELOPMENT 33530 1st Way South+Federal Way, WA 98003 Date April 3, 1995 Mark Miller Agent Name of Applicant us Northwest LLC Owner See attached list cro Mark Miller Consultants, Inc. Address 10801 Main St., Suite 100 Phone 455-1724 -Gy_ q-S5^5040 , Bellevue, WA-3�4_ Signature Owner Name/Address See attached list Phone (if different than applicant) S . 3 4 4th St. and 16th Ave. S . �nninn�.l-v T nnn** " Kroll 737 W Legal Description Project Description SW 1/ 4 Sec 21 T 21 N R 41 E . one BC ax Lot Nos: 21210490 2121049081, 2121049043, 2121049087, 2121049079, 2121049080, 2121049086 2121049088 Parcel Numbers} Pa1G`1 Nos: 1, 2, 3, 4, 5, 6, 7, 8 and 9 11T�Type,f Permit Required: SEPA Notice Sign Checklist Mailed Board Site Plan Review R R Land Surface Modification R R Boundary Line Adjustment Binding Site Plan R R R Short Subdivision Subdivision R R R • 4 Shoreline R R !� Variance R R R Conditional Use R R R Use - Process I R R Use - Process II R R R Use - Process III R R R Quasi -Judicial Rezone R R R Variance R* R R Comp. Plan/Rezone R R Annexation R R Lot Line Elimination X *Pre -Application Meeting R = Required * = Optional by City MA5TFRI_A.11kI-1