Mr. Walter Rubio March 24, 2008
Awbrey Cook Mcgill Architects
2970 Fifth Avenue, Suite 340
San Diego, CA 92103-5997
� J
Re: File #08-101368-00-AD; SITE PLAN/LANDSCAPE PLAN MODIFICATION
Celebration Square Building I; 1320 South 3241h Street, Federal Way
Dear Mr. Rubio:
This letter grants approval to your request received February 21, 2008, to modify the approved site plan
and landscape plan for the Celebration Center -Building I project at the above -referenced address. Land
use approval was granted for this project on August 19, 2004. A subsequent modification was approved
on July 31, 2006 (file #06-103478-AD), to provide for an interim parking layout in the portion of the site
where a future "Building C" was originally proposed.
Your February 14, 2008, letter proposes changes to Building I to reduce the total square footage of the
existing building by approximately 16,000 square feet. The east facade of Building I will be improved
with a new arcade and canopy per design previously reviewed and approved per the August 19, 2004,
decision noted above. With the proposed modification, an approximate 29,820 square foot addition
originally proposed for the south end of Building I has been eliminated.
In conjunction with the proposed building footprint change, parking area and interior parking lot
landscaping improvements are proposed. With the proposed modification, the number of parking stalls
would increase from 1,075 to 1,184 parking spaces. Proposed interior parking lot landscaping is 25,508
square feet which slightly exceeds the minimum 22 square feet per parking stall required by Federal Way
City Code (FWCC) Section 22-1567.
Pursuant to FWCC Section 22-411, "Subsequent Modification," the modification request does not
constitute a change in use and is determined to have no substantial changes to the impacts on the
neighborhood or the City. The modification request is therefore hereby approved.
Please contact Senior Planner Janet Shull, AICP, at 253-835-2644 should you have any questions about
this letter.
Sincerely,
Greg Fewins, Director
Community Development Services
Enc_ Approved Modified Land Use Site Plan Sheet A0.1 and Landscape Plan Sheets P2, P3, P4, P5, and P7
c: Janet Shull, AICP, Senior Planner
Scott Sproul, Acting Assistant Building Official
Ann Dower, Engineering Plans Reviewer
Doc [ D 44714
os-lof 34 Of- 4b
February 14, 2008
Janet Shull, AICP / Senior Planner
City of Federal Way, City Hall
P.O. Box 9718
Federal Way, WA 98063-9718
Re. Celebration Square - Bldg. I phase B
Permit #08-100070-00-CO
Dear Janet,
a r c h
AWBREY
COOK
MCGILL
i t e c t s
Tom Awbrey, Architect, AIA
Clifford Cook, Architect
Scot McGill, Architect
Dennis Rogers, Architect
Tim Fleming, Architect
Ricardo Garcia
Renee Jones
Please find this letter in response to your letter dated Jan. 31, 2008 which requests a
summary of the proposed changes to Bldg. I and related site improvements.
The proposed revisions to Bldg. I include:
■ demolition of approximately 16,000 SF of existing building area
• construction of new arcade canopy along eastern side of bldg. I
• enclose existing exterior service yard to become additional 824 SF of new
interior area for Bldg. I
The proposed improvements to the site adjacent to Bldg. I include:
• construction of new parking, walkways, site lighting, site amenities and
landscaped areas to replace portion of demolished Bldg. I
• replace portions of existing striped asphalt with new landscaped curb islands
(occurs directly south of bldg. I and east of bldg. 1) to meet landscaping area
requirements generated by new parking.
Please contact me with any questions or comments you may have.
Sincerely,
Walter Rubio
Project Leader
ACM Architects
Cc: file
FEB 2 1 2008
CITY OF FEDERAL WAY
BUILDING DEPT.
1045 14th Street, Suite 100, San Diego, CA 92101-5701 Ph: 619.398.3480 Fax: 619.398.3488
Comcast Webmail - Email Message
Page 1 of 1
From: "Walter Rubio" <Walter@acm-architects.com>
To: <JanetShullDesign @comcast.net>
Subject: Celebration Square
Date: Thursday, November 08, 2007 9:09:22 AM
Hi Janet,
Please see attached drawing and photos for reference to question below ("image 60" taken from center of the drawing looking
left/south, "image 53" from center looking down/east).
I'm preparing a new submittal to the City which will added a new trash compactor outside an existing bldg., at a rear service yard where
it is not visible from either the street or pedestrians within the shopping mall. It will be next to a service drive which in turn is next to the
rear property line, but separated by landscaping (so adjacent lot cannot view into service area).
Would the City code have any screening requirements for such an item? New compactor is being located to an adjacent one that does
not have any screening.
Thank you,
Walter Rubio
Project Leader
Awbrey Cook McGill Architects
1045 14th Street, Suite 100
San Diego, CA 92101-5701
AWB y
Phone 619.398.3480
COOK
Direct 619.814.5469
MSCGILL
Fax 619.398.3488
o n , . � , ,
walter@acmarchitects.com
PLEASE NOTE: This message, including any attachments, may include privileged, confidential and/or inside information. Any distribution or use of this communication
by anyone other than the intended recipient(s) is strictly prohibited and may be unlawful. If you are not the intended recipient, please notify the sender by replying
to this message and then delete it from your system. Thank you.
(Attachments successfully scanned for viruses.)
Attachment 1: (application/octet-stream)
Attachment 2: (image/jpeg)
Attachment 3: (image/jpeg)
http://mailcenter.comcast.net/wmc/v/wml4733775300084F36000023OE2205 8861720209O... 11 /8/2007
O Q
W O
U U Z Q
z¢aQEL
o 5zo
j<OZ
W U U Q
J
Q Z
g
o
r(Ka
cn U —
(L
m
XJO
U
W W W
Nm
z
y
z
in
❑ W
W
m
QZ
I
a
0
48
yb
zmz
o ¢
ra
mo,X
��<
3~
zi
U o
W
Z
IJNIlSIX3)
JNIN3dO
dn-"llom
Ol 8af13
(ONIlSIX3)
LI000 do
-IION.O-.B
SNIN3dO
do-iiou Ol
❑HVIIOS
d0 33Vd) -Z
}
Q
N o
XO
w o
d0 3nVd} -L
CO
CO
0�I
0
NE�
ao
w
Q
2
a
Z
J
D
m
Q
a
J
Q
a
a
W z
Z°
W z
U x
O 3
a
co
3
J¢
J w
W
ULU
W2P SLGDZhVB[
RECEIVED BY
COMMUNITY Y DEVELOPMENT D5PARTMEN [
U IL1TY D15fRlu'
November 1, 2007
NOV 0 2 2007
LAKEHAVEN UTILITY DISTRICT
31627 -1st Avenue South • P.O. Box 4249 • Federal Way, Washington 98063-4249
Federal Way: 253-941-1516 ■ Tacoma: 253-927-2922
www.lakehaven.org
John M Kuhl
Harsch Investment Properties
P.O. Box 2708
Portland, OR 97205
RE: Celebration Square Phase I
Agreement No. 04-592
Dear Mr. Kuhl:
The District has received all closing documentation and has completed a satisfactory final
inspection of the referenced project for compliance with Lakehaven Utility District
standards for materials and construction of water systems. Lakehaven hereby initially
accepts this project for ownership, operation and maintenance.
The Maintenance Bond (No. 104415813) submitted for the project in the amount of
$5,000.00, shall be maintained in force for a period of two years from this date of initial
acceptance and until the District gives written notice of its release, pending satisfactory
results of a final inspection to ensure the systems remain in compliance with District
standards for materials and construction.
The cash deposit held to guarantee construction under the substantial completion policy is
hereby satisfied and may now be released. The deposit, in the amount of $13,694.00, is in
the process of being refunded. Please allow approximately thirty (30) days for completion
of this process.
The District has reviewed the project account and has estimated the anticipated expenses
needed to complete the project through the two-year warranty period. If the actual costs
exceed the amount held on deposit following completion of the two-year warranty period,
you will be invoiced accordingly. The invoice must be paid prior to release of the
Maintenance Bond. Any funds remaining in the account will be refunded following the
satisfactory completion of the two-year warranty period, as evidenced by a successful
inspection of the systems by District personnel, at which point the project will be granted
Charles Gibson Donald L.P. Miller Ronald E. Nowicki Ed Stewart Beverly J. Tweddle
Commissioner Commissioner Commissioner Commissioner Commissioner
John M. Kuhl
Harsch Investment Properties
November 1, 2007
Page 2
final acceptance by Lakehaven.
Please do not hesitate to call John Jensen, if you have any questions. John may be
reached by phone at (253) 946-5406, by electronic mail at jjensen@lakehaven.org, or by
fax at (253) 529-4081.
Sine rel -
Jo C. Bowman, P.E.
En Bering Manager
JCB/JAJ