Loading...
22-105474City of Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: LAFONTAINE Project Address: 29727 3RD AVE S Building - Single Family Permit #:22-105474-00-SF Inspection Request Line: (253) 835-3050 Parcel Number: 692860 0300 Project Description: BLUEBEANI - Construction of new master bath into existing finished space. Demo interior non -load bearing walls to expand and remodel kitchen. Includes plumbing and mechanical. Owner Applicant Contractor Lender JASON LAFONTAINE ERIC KLISKEYFINISH LINE FINISH LINE SOLUTIONS LLC OWNER IS LENDER 29727 3RD AVE S - SOLUTIONS LLC 6218 MONTEVISTA DR SE FEDERAL WAY WA 6218 MONTEVISTA DR SE AUBURN WA 98092-8272 AUBURN WA 98092 . 98003 Census Category: 434 - Residential alt/add - no change in number of units Includes: # 1 92 #3 #4 Occupancy Class: R-3 Construction Type: Type V - B Occupancy Load: Floor Area (sq. ft.) Additional Permit Information Occupancy 41 - Construction Type ......................... Type V - B Mechanical to be Included?..................................... Yes Plumbing Work Valuation? ..................................... 10000 Mechanical Work Valuation?.................................. 2000 Number of Stories.......... ......................................... 0 Is this an Online or O.T.C. application?.................. No Plumbing to be Included? ........................................ Yes Occupancy # I - Use................................................ Residence (1 or 2 family) Comprehensive Plan Designation ........................... SF - High -Density Zoning Designation................................................. RS 9.6 Residential Total Valuation: 65,000.00 Mechanical Fixtures Ducting 1 Fans I Plumbing Fixtures Dishwashers I Lavatories 1 Showers i Sinks 1 Water Closets I PERMIT EXPIRES Tuesday, 3 October, 2023 Permit Issued on Thursday, April 6, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will Ise-in.accordance with the laws, rules and regulations of the State of nFii: nd the'City of Federal Way. Owner or agent: Date: I';AAk THIS CARD IS TO REMAIN ON -SITE CITY OF Construction Inspection Record Federal Way INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 22 105474 00 Address: 29727 3RD AVE S Project: TIFFANY LAFONTAINE FEDERAL WAY WA 98003-3618 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. Q Plumbing Groundwork (4190) -'� Underfloor Framing (4285) 0 Floor Sheathing (4105) Approved to cover Approved to sheath floor Approved to install flooring By Date By Date By Date 0 Shear Walls (4245) 0 Roof Sheathing (4220) Rough Plumbing (4230) Approved to install siding - Approved to install roofing Approved Date �7 By Date � Ca By Date By Mechanical Rough -in (4165) 0 Gas Piping (4125) 9❑ Fire/Draft Stops (4095) Approved Approved to release test Approved By Dtj_ate By Date By IL DateT)da Prior to scheduling a Framing inspection; 1 p Framing (4120) Electrical, Plumbing & Mechanical Rough -in and Fire/Draft Stop inspections must be signed- off and approved. IBC 109.3.4 By Approved to insulate �� Date 12 Gypsum Wallboard Nailing (4130) 13 Final - Mechanical (4065) Approved to install mud & tape AppioN ed By Date By Ali Dante C W x 1 5 Final - Building (4050) Approved By Date El Insulation (4150) Approved to install wallboar By O Date7,5�) 0 Final - Plumbing (4075) Approved By Date Rough Electrical Final Electrical ❑ Right of Way Approved Approved Approved By Date By Date By Date