22-105474City of Federal Way
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: LAFONTAINE
Project Address: 29727 3RD AVE S
Building - Single Family
Permit #:22-105474-00-SF
Inspection Request Line: (253) 835-3050
Parcel Number: 692860 0300
Project Description: BLUEBEANI - Construction of new master bath into existing finished space. Demo interior
non -load bearing walls to expand and remodel kitchen. Includes plumbing and mechanical.
Owner
Applicant
Contractor
Lender
JASON LAFONTAINE
ERIC KLISKEYFINISH LINE
FINISH LINE SOLUTIONS LLC
OWNER IS LENDER
29727 3RD AVE S
- SOLUTIONS LLC
6218 MONTEVISTA DR SE
FEDERAL WAY WA
6218 MONTEVISTA DR SE
AUBURN WA 98092-8272
AUBURN WA 98092
. 98003
Census Category: 434 - Residential alt/add - no change in number of units
Includes:
# 1
92
#3
#4
Occupancy Class:
R-3
Construction Type:
Type V - B
Occupancy Load:
Floor Area (sq. ft.)
Additional Permit Information
Occupancy 41 - Construction Type .........................
Type V - B
Mechanical to be Included?.....................................
Yes
Plumbing Work Valuation? .....................................
10000
Mechanical Work Valuation?..................................
2000
Number of Stories.......... .........................................
0
Is this an Online or O.T.C. application?..................
No
Plumbing to be Included? ........................................
Yes
Occupancy # I - Use................................................
Residence (1 or 2
family)
Comprehensive Plan Designation ...........................
SF - High -Density
Zoning Designation.................................................
RS 9.6
Residential
Total Valuation: 65,000.00
Mechanical Fixtures
Ducting 1 Fans I
Plumbing Fixtures
Dishwashers I Lavatories 1 Showers i
Sinks 1 Water Closets I
PERMIT EXPIRES Tuesday, 3 October, 2023
Permit Issued on Thursday, April 6, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will Ise-in.accordance with the laws, rules and regulations of the State of
nFii:
nd the'City of Federal Way.
Owner or agent: Date:
I';AAk
THIS CARD IS TO REMAIN ON -SITE
CITY OF Construction Inspection Record
Federal Way INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 22 105474 00 Address: 29727 3RD AVE S
Project: TIFFANY LAFONTAINE FEDERAL WAY WA 98003-3618
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
Q Plumbing Groundwork (4190) -'� Underfloor Framing (4285) 0 Floor Sheathing (4105)
Approved to cover Approved to sheath floor Approved to install flooring
By Date By Date By Date
0 Shear Walls (4245)
0 Roof Sheathing (4220)
Rough Plumbing (4230)
Approved to install siding -
Approved to install roofing
Approved
Date
�7
By Date � Ca
By Date
By
Mechanical Rough -in (4165)
0
Gas Piping (4125)
9❑
Fire/Draft Stops (4095)
Approved
Approved to release test
Approved
By
Dtj_ate
By
Date
By
IL DateT)da
Prior to scheduling a Framing inspection;
1 p
Framing (4120)
Electrical, Plumbing & Mechanical Rough -in
and Fire/Draft Stop inspections must be signed-
off and approved. IBC 109.3.4
By
Approved to insulate
�� Date
12
Gypsum Wallboard Nailing (4130)
13
Final - Mechanical (4065)
Approved to install mud & tape
AppioN ed
By
Date
By
Ali Dante C W x
1 5 Final - Building (4050)
Approved
By
Date
El Insulation (4150)
Approved to install wallboar
By O Date7,5�)
0 Final - Plumbing (4075)
Approved
By Date
Rough Electrical
Final Electrical
❑
Right of Way
Approved
Approved
Approved
By
Date
By
Date
By
Date