Loading...
23-103713City of Federal Way FILE Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: MCKNIGHT Project Address: 35833 6TH AVE SW Electrical Permit #:23-103713-00-EL Inspection Request Line: (253) 835-3050 Parcel Number: 302104 9048 Project Description: ELECTRICAL FOR PANEL REPLACEMENT, CIRCUIT FOR HEAT PUMP AND GENERATOR INSTALL Owner Applicant Contractor ROSS MCKNIGHT KAREN MATHENEYWASHINGTON WASHINGTON ENERGY SERVICES CO 35833 6TH AVE SW ENERGY SERVICES CO (ELECTRICAL 01) FEDERAL WAY WA 98023 3909 196TH ST SW WASHIES854NG (9/7/23) LYNNWOOD WA 98036 3909 I96TH ST SW LYNNWOOD WA 98036 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes J� Electrical Fixtures Alt. Serv./Feeder: 0 to 200 aml 2 Circuits - Residential I PERMIT EXPIRES Tuesday, 16 January, 2024 Permit Issued on Thursday, July 20, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of the City of Federal Way. s in ❑ an Owner or agent: F Date: PCx-, ) a" ::_ �_,_ clrr of Federal Way THIS CARD IS TO RE�I_AI\ ON -SITE Construction Inspection Record INSPECTION REQL-ESTS: (253) S35-3050 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE T1D.S CARD. Inspections are listed as close to sequential order as possible (read left to right. top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card_ ELECTRICAL Q LIFER Ground (4295) El Ditch cover (4030)❑ Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date B} Date 0 Pool Bonding (4195) Q Temporary Power (4275) 0 Service (4235) Approved Approved Approved By Date By Date By Date ❑ Feeders/Sub-panels (4045) CJ Rough Electrical (4225) Q Ceiling Corer (4020) Approved Approved Approved By Date By Date By Date El Final - Electrical (4055) Approved By Date �i MECHANICAL Mechanical Rough -in (4165) ❑ Gas Piping (4125) ❑ Final - Mechanical (4065) Approved Approved to release test 1By Approved By Date Date By Date PLUMBING 0 Plumbing Groundwork (4190) 0 Rough Plumbing (4230) Q Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date By Date