23-102537City of Federal Way
`�
Community Development Dept.
1
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: SBA
Project Address: 33400 9TH AVE S
Project Description: Relocate one existing thermostat.
Electrical
Permit #:23-102537-00-EL
Inspection Request Line: (253) 835-3050
Parcel Number: 926501 0060
Owner
Applicant
Contractor
RH GOLDEN STONE KBH LLC
VAN DUONGPerformance Mechanical Group
PERFORMANCE HEATING & A/C (EL 06)
PO BOX 5003
1012 CENTRAL AVE S
PERFOHC777JK (4/13/25)
BELLEVUE WA 98003
KENT WA 98032
1012 CENTRAL AVE S
KENT WA 98032
Additional Permit Information
Is this an Online or O.T.C. application? .................. Yes
Electrical Fixtures
Thermostat 1
PERMIT EXPIRES Wednesday, 8 November, 2023
Permit Issued on Friday, May 12, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way -
Owner or agent: Date.
40�&
C11V o/
Federal Way
THIS CARD IS TO RENUUN ON -SITE
Construction Inspection Record
INSPECTION REQI7ESTS: (253) $35-3050
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE TIUS C:aRD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. TA"ork ntttst not be covered until it is approved. Check With your inspector if
you are unsure about any of the inspections or the inspection sequence- On -going inspections are logged on the back of this card -
ELECTRICAL
El
L-FER Ground (4295)
❑
Ditch cover (4030)
❑
Slab/Concrete Floor (4255)
Approved
Approved
Approved to place concrete
By
Date
By
Date
By
Date
❑
Pool Bonding (4195)
❑ Temporary Power (4275)
❑
Service (4235)
Approved
Approved
Approved
By
Date
By
Date
By
Date
❑
Feeders/Sub-panels (4045)
❑
Rough Electrical (4225)
❑
Ceiling Cover (4020)
Approved
Approved
Approved
By
Date
By
Date
By
Date
E ] Final - Electrical (4055)
Approved
B}-
f
MECHANICAL
El
Mechanical Rough -in (4165)
0
Gas Piping (4125)
Q
-Final -Mechanical (4065)
Approved
Approved to release tat
Approved
By
Date
By
Date
By
Date
PLUMBING
❑
Plumbing Groundwork (4190)
❑
Rough Plumbing (4230)
❑
Final - Plumbing (4075)
Approved to cover
Approved
Approved
By
Date
By
Date
BY
Date