23-103847City of Federal Way
FILE
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: HEATHERWOOD APARTMENTS, Unit 108
Project Address: 27314 24TH AVE S
Project Description: Remove/replace electric water heater, Unit 108
Plumbing
Permit #:23-103847-00-PL
Inspection Request Line: (253) 835-3050
Parcel Number: 720480 0004
Owner
Applicant
Contractor
KC HOUSING AUTHORITY
JASON HANLEYBROWNFAST WATER
FAST WATER HEATER CO (PLUMBING)
600 ANDOVER PARK W
HEATER COMPANY
FASTWWH79901 (10/1/23)
TUKWILA WA
11715 NORTH CREEK PKWY S SUITE C-106
1715 NORTH CREEK PKWY S SUITE C-10i
98188
BOTHELL WA 98011
BOTHELL WA 98011
— - - ` - — Plumbing Fixtures
Water Heaters
PERMIT EXPIRES Wednesday, 24 January, 2024
Permit Issued on Friday, July 28, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
,-.Washington a, d jhe Cit f Federal Way-
Owner or agent: L � Date:
rI/1
I / M'4�7t/)
CITY or
Federal Way
THIS C LRD IS TO REALkIN ON -SITE
Construction Inspection Record
I\SPEC•TION REQUESTS: (253) 335-130- 0
Scheduled inspections :ua.,• be failed if this card is not on -site. DO NOT LOSE THIS CARD. L1Spections are listed as close to sequential order as possible
(read left to right. top to bottom). Please schedule inspections as appropriate. Work must not be co-vered until it is approved. Check with your inspector if
cou are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of ibis card_
ELECTRICAL
Q
i;FER Ground (4295)
❑
Ditch cover (4030)
❑
Slab/Concrete Floor (4255)
Approved
Approved
Approved to place concrete
By
Date
By
Date
B3
Date
Q
Pool Bonding (4195)
Q
Temporarc Power (4275)
Q
Sertice (4235)
Approved
Approved
Approved
By
Date
By
Date
By
Date
❑
Feeders/Sub-panels (404'
0
Rough Electrical (4225)
0
Ceiling Cover (4020)
Approved
Appru.ed
Approved
By
Date
By
DateI
By
Date
❑
Final - Electrical (4055)
Approved
By
Date
MECHANICAL
Q
!Mechanical Rough -in (4165)
❑
Gas Piping (4125)
3❑
-Final - Mechanical (4065)
Approved
Approved to release test
Approved
By
Date
By
Date
By
Date
PLUMBING
❑ Plumbing Groundwork (4190) 0
Rough Plumbing (4230) Q Final - Plumbing (4075)
B1
Approved to cover
Date
By
Approved
Date
131
wrowd ✓%
x rx `"
Date