23-104184City of Federal Way
-L
-
9
F-..,,
Community Development Dept
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: GOMEZ
Project Address: 30629 1ST PL SW
Project Description: Septic Install
Electrical
Permit #:23-104184-00-EL
Inspection Request Line: (253) 835-3050
Parcel Number: 556000 0880
Owner
Applicant
Contractor
GASPAR GOMEZ
JACOB TABARESA ADVANCED SEPTIC
A ADVANCED SEPTIC SERVICES
30629 1ST PL SW
SERVICES
(ELECTRICAL)
FEDERAL WAY WA
1602 S 1602 W VALLEY HWY
ADVANSS814MA (7/l/25)
98023-3902
AUBURN WA 98001
1602 WEST VALLEY HWY S
AUBURN WA 98001
Additional Permit Information
Is this an Online or O.T.C. application? .................. Yes
Electrical Fixtures
Circuits - Residential
CONDITIONS:
Inspection approval is required prior to covering or concealing any portion of the septic electrical system,
including the pump. New septic & effluent tanks containing electrical wires and equipment MUST be
inspected and approved PRIOR to being loaded with sewage. (Per 296-46B-501-001(b)(7)WAC)
PERMIT EXPIRES Tuesday, 13 February, 2024
Permit Issued on Thursday, August 17, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
as ington and the City of Federal Way.
sN1Owner or agent: Date:
CITY W
Federal Way
THIS CARD IS TO RE]I_-UN ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (2-53) 53-5-30-50
Scheduled inspections nix be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right. top to bottom). Please schedule inspections as appropriate. Fork nitrst not be covered until it is approved. Check with y=r inspector if
you are unstue about ant. of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
ELECTRICAL
❑
By
UFER Ground (4295)
Approved
Date
❑
By
Ditch corer (4030)
Approved
Date
❑
By
Slab/Concrete Floor (4255)
Approved to place concrete
Date
Pool Bonding (4195)
❑
Temporary Power (4275)
Q
Service (4235)
Approved
Approved
Approved
B,,-
Date
By
Date
By
Date
❑
Feeders/Sub-panels (4045)
❑
Rough Electrical (4225)
❑
Ceiling Cover (4020)
Approved
Approved
Approved
By
Date
By
Date
By
Date
0
Final - Electrical (4055)
By
Approved
MECHANICAL
❑ Mechanical Rough -in (4165)
❑
Gas Piping (4125)
Q
Final - Mechanical (4065)
Approved
Approved to release test
Approved
By Date
Date
By
Date
PLUMBING
❑ Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) ❑ Final - Plumbing (4075)
Approved to cover Approved Approved
By Date By Date By Date