23-104242City of Federal Way
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: THE RETREAT AT MAPLE HILL, PH 1; BLDG 6
Project Address: 32115 20TH LN SW
Project Description: Pull new wire to bldg 6
Electrical
Permit #:23-104242-00-EL
Inspection Request Line: (253) 835-3050
Parcel Number: 132103 9101
Owner
Applicant
Contractor
BMF IV WA RETREAT MAPLE HILLS
MARK JENSENINNOVATIVE SYSTEMS
INNOVATIVE SYSTEMS TECHNOLOGY
I I I E SEGO LILY DR SUITE 400
TECH, INC.
INC (EL 01)
SANDY UT 84070
1402 LAKE TAPPS PKWY SE SUITE 104-147
INNOVST881B4 (1/24/24)
AUBURN WA 98092
402 LAKE TAPPS PKWY SE SUITE 104-14'
AUBURN WA 98092
Additional Permit Information
Is this an Online or O.T.C. application? .................. Yes
Electrical Fixtures
Circuits - Multi -family 1
PERMIT EXPIRES Saturday, 17 February, 2024
Permit Issued on Monday, August 21, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
OVNn
nIrN rf Federal Way.
Owner or agent: Date:
rr.al
CITY Of
Federal Way
THIS CARD IS TO REAI_Jk \ ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (2-53) S35-30-50
Scheduled inspections ma,r be : tiled if this crud is not on -site- DO NOT LOSE TBIS CARD, Inspections are listed as close to sequential order as possible
(read left to right. top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with •yott_r inspector if
you are unsure about an:.- of the inspections or the inspection sequence. On -going inspections are logged on the back of this card,
Q
L-FER Ground (4295)
0
Ditch corer (4030)
0
Slab/Concrete Floor (4255)
Approved
Approved
Approved topliace concrete
BV
Date
By
Date'!" � v/
B}
Date
0
Pool Bonding (4195)
0
Temporary- Power (4275)
❑
Sen-ice (4235)
Approved
Approved
Approved
By
Date
By
Date
B3•
Date
❑
Feeders/Sub-panels (4045)
0
Rough Electrical (4225)
❑
Ceiling Cover (4020)
Approved
appro ea
Approved
By
Date
By
Date
By
Date
El
Final - Electrical (4055)
Bv
roved
4��Date
MECHANICAL
❑'
Mechanical Rough -in (4165)
0
Gas Piping (4125)
Q
Final - liechanical (4065)
Approved
Approved to release test
Approved
By
Date
By
Date
By
Date
PLUMBING
Plumbing Groundwork (4190)
❑
Rough Plumbing (4230)
❑
Final - Plumbing (4075)
Approved to cover
Approved
Approved
By
Date
By
Date
By