23-104327City ofFederal Way
Community Development Dept
FILE
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: CHASE BANK
Project Address: 32000 PACIFIC HWY S
Project Description: Install Wall pack and Blank off GFI
Electrical
Permit #:23-104327-00-EL
Inspection Request Line: (253) 835-3050
Parcel Number: 162104 9041
Owner
Applicant
Contractor
JP MORGAN CHASE BANK
ERIC OLSENOLSEN ELECTRIC
OLSEN ELECTRIC INC (01)
PO BOX 1919
325 WASHINGTON AVE S SUITE 91
OLSENEI93IPE (10/5/23)
WICHITA FALLS TX 76307
KENT WA 98032
325 WASHINGTON AVE S SUITE 91
KENT WA 98032
Additional,Permit Information
Is this an Online or O.T.C. application? .................. Yes
Electrical Fixtures
Circuits - Commercial 2
PERMIT EXPIRES Wednesday, 21 February, 2024
Permit Issued on Friday, August 25, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
W f�iF
9ngt n n -City of Federal Way.
Owner or agent: " Date.
CITY O*
Federal Way
THIS CARD IS TO REAL -VI\ ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (2-53) 835-30-50
Scheduled inspections nLu, be failed if this card is not on -sire. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read :eft to right, top to bottom). Please schedule inspections as appropriate. 'Work- must not be co:•ered until it is approved. Check with •your inspector if
you are unsiLre about ant: of the inspections or the inspection sequence- Chi -going inspections are logged on the back of this card -
ELECTRICAL
0
LTFER Ground (4295)
❑
Ditch corer (4030)
❑
Slab/Concrete Floor (425:)
Approved
Approved
Approved to place concrete
By
Date
By
Date
By
Date
0
Pool Bonding (4195)
❑
Temporary Power (4275)
Q
Service (4235)
Approved
Approved
Approved
By
Date
By
Date
By
Date
❑
FeederslSab-panels (4045)
❑
Rough Electrical (4225)
❑
Ceiling Cover (4020)
Approved
Approved
Approved
By
Date
I Bi
Date
By
Date
E J
Final - Electrical (4055)
By
Approved
Date _
✓//
MECHANICAL
Q
lechanical Rough -in (4165)
❑
Gas Piping (4125)
Q
Final - Mechanical (4065)
Approved
Approved to release test
Approved
Br
Date
By
Date
B v
Date
PLUMBING
Q
Plumbing Groundwork (4190)
0
Rough Plumbing (4230)
21
❑
Final - Plumbing (4075)
Approved to toner
Approved
Approved
By
Date
By
Date
By
Date