23-104263Mechanical
city Federa] CommunityfDevelopment Dept. E
Permit #:23-104263-00-ME
S8th Ave S
Federalal Way, WA 98003 Inspection Request Line: (253) 835-3050
Ph: (253) 835-2607 Fax: (253) 835-2609 F I L
Project Name: PRATT
Project Address: 245 SW 298TH PL Parcel Number: 720532 0150
Project Description: Replace gas water heater
Owner
Applicant
Contractor
JEFFREY A PRATT
JAIMIE HOWBRENNAN HEATING & A/C
BRENNAN HEATING & A/C LLC
PO BOX 54014
4601 S 134TH PL
(GENERAL 01)
REDONDO WA 98054-0014
SEATTLE WA 98168
BRENNHA971R9 (12/29/23)
4601 S 134TH PL
SEATTLE WA 98168
Additional Permit Information
Mechanical Work Valuation?.. 1900 Is this an Online or O.T.C. application? .................. Yes
Hot Water Tanks
Mechanical Fixtures
PERMIT EXPIRES Sunday, 18 February, 2024
Permit Issued on Tuesday, August 22, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: Date
-IN"
cn.r os
Federal Way
THIS CARD IS TO RE-NLU s ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 83-5-30-50
Scheduled inspections ma-; be failed if this crud is not on -site. DO NOT LOSE TBIS CARD. Inspections are listed as close to sequential order as possible
(read left to right. top to bottom). Please schedule inspections as appropriate Work must not be covered until it is approved. Check with your inspector if
;rots are utvme about auv of the inspections or the inspection sequence On -going inspections are logged on the back of this card.
ELECTRICAL
0
By
LTFER Ground (4295)
Approved
Date
Q
By
Ditch corer (4030)
Approved
Date
Q
By
Slab/Concrete Floor (4255)
Approved to place concrete
Date
0
Pool Bonding (4195)
0
Temporary Power (4275)
Q
Service (4235)
Approved
Approved
Approved
By
Date
Bv
Date
By
Date
Q
Feeders/Sub-panels (4045)
®
Rough Electrical (4225)
El
Ceiling Cover (4020)
Approved
Approved
Approved
Bs
Date
By
Date
By
Date
Final - Electrical (4055)
Ape. owed
By
Date
MECHANICAL
0
tlechanical Rough -in (4165)
0
Gas Piping (4125)
n3,
•Final - \Mechanical (4065)
Bv
Approved
Date
By
Approved to release test
Date
By
Approved
7 Date
/
PLUMBING
0
Plumbing Groundwork (4190)
Q'
Rough Plumbing (4230)
Q
Final - Plumbing (4075)
Approved to cover
Approved
Approved
By
Date
B-.•
Date
By
Date