Loading...
23-104263Mechanical city Federa] CommunityfDevelopment Dept. E Permit #:23-104263-00-ME S8th Ave S Federalal Way, WA 98003 Inspection Request Line: (253) 835-3050 Ph: (253) 835-2607 Fax: (253) 835-2609 F I L Project Name: PRATT Project Address: 245 SW 298TH PL Parcel Number: 720532 0150 Project Description: Replace gas water heater Owner Applicant Contractor JEFFREY A PRATT JAIMIE HOWBRENNAN HEATING & A/C BRENNAN HEATING & A/C LLC PO BOX 54014 4601 S 134TH PL (GENERAL 01) REDONDO WA 98054-0014 SEATTLE WA 98168 BRENNHA971R9 (12/29/23) 4601 S 134TH PL SEATTLE WA 98168 Additional Permit Information Mechanical Work Valuation?.. 1900 Is this an Online or O.T.C. application? .................. Yes Hot Water Tanks Mechanical Fixtures PERMIT EXPIRES Sunday, 18 February, 2024 Permit Issued on Tuesday, August 22, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date -IN" cn.r os Federal Way THIS CARD IS TO RE-NLU s ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 83-5-30-50 Scheduled inspections ma-; be failed if this crud is not on -site. DO NOT LOSE TBIS CARD. Inspections are listed as close to sequential order as possible (read left to right. top to bottom). Please schedule inspections as appropriate Work must not be covered until it is approved. Check with your inspector if ;rots are utvme about auv of the inspections or the inspection sequence On -going inspections are logged on the back of this card. ELECTRICAL 0 By LTFER Ground (4295) Approved Date Q By Ditch corer (4030) Approved Date Q By Slab/Concrete Floor (4255) Approved to place concrete Date 0 Pool Bonding (4195) 0 Temporary Power (4275) Q Service (4235) Approved Approved Approved By Date Bv Date By Date Q Feeders/Sub-panels (4045) ® Rough Electrical (4225) El Ceiling Cover (4020) Approved Approved Approved Bs Date By Date By Date Final - Electrical (4055) Ape. owed By Date MECHANICAL 0 tlechanical Rough -in (4165) 0 Gas Piping (4125) n3, •Final - \Mechanical (4065) Bv Approved Date By Approved to release test Date By Approved 7 Date / PLUMBING 0 Plumbing Groundwork (4190) Q' Rough Plumbing (4230) Q Final - Plumbing (4075) Approved to cover Approved Approved By Date B-.• Date By Date