Loading...
21-101048ti City of Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 836-2609 Building - Conimercial Permit #:21-101048-00-CO Inspection Request Line: (253) 835-3050 Project Name: Sound Transit - FWLE - Mark Twain Play Structure Project Address: 2450 S STAR LAKE RD Parcel Number: 720480 0010 Project Description: New Play Structure for FWLE Restoration of Mark Twain Elementary Owner Applicant Contractor Lender MIKE BENZIENFEDERAL WAY DANA WILKSOUND TRANSIT KIEWIT INFRASTRUCTURE PUBLIC SCHOOLS 401 S JACKSON ST WEST CO (GENERAL) 33330 8TH AVE S SEATTLE WA 98104-2826 2505 S 320TH ST FEDERAL WAY WA 98003-5433 FEDERAL WAY WA 98003 Census Category: 328 - New Other Non -Residential Building Includes: #1 #2 #3 #4 Occupancy Class: Construction Type: Occupancy Load: Floor Area (sq. ft.) 0.00 0.00 0.00 0.00 Additional Permit Information Mechanical to be Included? ..................................... No Number of Stories.................. I Is this an Online or O.T.C. application? .................. No Permit for Building Shell Only?.............................. No Plumbing to be Included? ........................... I............ No No Fixtures.Asspciated With This Permit it PERMIT EXPIRES Sunday, 9 January, 2022 Permit Issued on Tuesday, July 13, 2021 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of City of Federal Way. FItlam Owner or agent: Date: 0UL3".(,'., O'Neill Service Group, City of Federal Way 33325 81h Ave S Federal Way, WA 98003 C/O: Building Official Subject: Final Summary of Special Inspections Sound Transit — FWLE — Mark Twain Play Structure Permit 21-101048-00-CO To whom it may concern: August 23, 2023 OSG Project #2021 O'Neill Service Group, LLC (OSG) respectfully submits this final summary letter to acknowledge that special inspections have been completed for the above -referenced project. OSG performed inspections for this project as described by our Daily Field Reports and corresponding laboratory test reports. These reports, copies of which were previously submitted, form the basis for this final summary of our inspections. OSG performed inspections for the following: Soil backfill compaction testing. + Structure Steel. Structural Concrete and Reinforcing Steel. The work which was inspected as referenced in our Daily Field Reports was performed in general conformance with the approved plans, building codes, and changes authorized by the structural engineer. If you have any questions or desire additional information, please call at your convenience. Sincerely, O'N ill ery ce G LLC. i Slava Kur NW Branch Manager www.oneillsg.com 1 17619 NE 671h Ct. Suite 100 Redmond, WA 98052 1425.429.7800 rr -, CITY OF Federal Way THIS CARD IS TO REMAIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 21 101048 00 Address: 2450 S STAR LAKE RID Project: MIKE BENZIEN FEDERAL WAY WA 98003-6977 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. ❑ Footings/Setback (4110) ❑z Foundation Wall (4115) 0 Drainage/Downspout (4040) Approved to place concrete Approved to place concrete Approved to backfill By Date _'I 10 IZJ By Date By Date ® Re -steel (4215) 0 Slab/Concrete Floor (4255) ® Underfloor Framing (4285) Approved to place concrete or grout Approved to place concrete Approved to sheath floor By Date By Date By Date Q Floor Sheathing (4105) ® Shear Walls (4245) Roof Sheathing (4220) Approved to install flooring Approved to install siding Approved to install roofing By Date By Date By Date Fla Fire/Draft Stops (4095) Approved By Date 92 Insulation (4150) 13 Gypsum Wallboard Nailing (4130) 14 Suspended Ceiling Grid (4265) Approved to install wallboard Approved to install mud & tape Approved to drop tile By Date By Date By Date 15 Final - S K F & R (4060) 96 Final - Planning Final - Building (4050) Approved Approved Approved By Date By Date By Date Rough Electrical ❑ Final Electrical ❑ Right of Way Approved Approved Approved By Date By Date By Date