RE: File #12-104285-00-UP; `PROCESS I `DIRECTOR'S APPROVAL'
Sprint - SE63XC320 Jeffries, 29205 181h Avenue South, Federal Way
The City of Federal Way's Community and Economic Development Department has completed an
administrative land use review of the proposed upgrades to an existing Personal Wireless Service Facility
(PWSF) located on an 85-foot Puget Sound Energy (PSE) monopole, at the above -mentioned site.
Additional modifications to existing ancillary equipment located within a fenced area are also proposed.
The modification is part of a technology upgrade being performed on Sprint Spectrum's network, in order
to improve service to its customers in the area.
The Process I application was submitted and determined to be complete on September 19, 2012. Your
proposal is found to be consistent with provisions of Federal Way Revised Code (FWRC) Chapter 19.55,
`Process I — Director's Approval', and Chapter 19.255, `Personal Wireless Services Facilities'. Your
Process I proposal is hereby approved.
The Process I land use approval is supported by the following statement of facts:
1. Zoning & Land Use — The zoning designation for the subject property is Community Business (BC).
PWSFs are permitted in the BC zone pursuant to the zoning chart found in FWRC 19.220.120.
Review Process — According to submitted materials, the applicant proposes to remove six existing
antennas, and install three new panel antennas. No height increase is proposed. Two equipment
cabinets will be removed and replaced with three new cabinets and ancillary equipment within an
existing fenced equipment area. The replacement of antennas on an existing PWSF is subject to
Process I Director's Approval pursuant to FWRC 19.15.030 `Review processes for improvements and
additions to developed sites'.
3_ Prioritized Locations — AppIicant proposes PWSF improvements in an "existing broadcast, relay
and transmission towers" or the second prioritized location set forth in FWRC 19.255.010(4). The
highest prioritized location is not feasible as this proposal is an upgrade to an existing facility. By
choosing the higher priority location, redundant facilities would be created and possibly cause
negative effects to the overall network. Staff finds the applicant has met the burden to utilize the
second prioritized location.
4. Cumulative Effects — The City must consider the cumulative visual effects of PWSFs mounted on
existing structures and/or located on a given permitted site in determining whether additional permits
may be granted so as to not adversely affect the visual character of the City. As shown on the site
Ms. Ausink
October 2, 2012
Page 2
plan, elevations, and photos, the replacement of six antennas with three new panel antennas and
cabinet equipment are not a substantial increase to the existing site. The PWSF will not adversely
affect the visual character of the City and there is no proposed height increase.
5. Facility — The existing and proposed facility exceeds microcell and minor facility thresholds defined
in FWRC 19.05.130. Facilities exceeding such thresholds may be permitted if (1) adverse visual
impacts are not created; (2) equipment cabinets meet adopted development standards; and (3) the
number of antennas and their size are appropriate for the location. All three criteria have been met as
further analyzed in this document's findings.
6. Exempt Activity — Applicant proposes to remove two cabinets and add three cabinets within the
equipment enclosure. Proposed upgrades will occur within the enclosure and within the existing
fenced area resulting in no exterior alteration. Therefore, these changes are exempt from PWSF
standards set forth in FWRC Chapter 19.255 and are permitted outright with no further zoning
compliance required pursuant to FWRC 19.255.010(3)(g).
7. State Environmental Policy Act (SEPA) —The proposed improvements are exempt from State
Environmental Policy Act review as the scope of work meets categorical exemption WAC 197-11-
800(25)(a)(ii), a facility exceeding microcell status, attached to an existing structure, not a residence
or school, and located in a commercial zone.
8. Additional Permits — A separate electrical permit will be required. Please contact a Development
Specialist at 253-835-2607 if you have questions regarding the electrical permit application process.
9. Process I Thresholds —The proposed improvements meet Process I purpose criteria set forth in
FWRC 19.55.020 including compliance with applicable provisions of FWRC Title 19 `Zoning and
Development' and health, safety, and welfare standards.
CLOSING
This decision shall not waive compliance with future City of Federal Way codes, policies, and standards
relating to this site. This Process I approval does not constitute approval of an electrical permit.
The effective date of this decision is October 5, 2012, or three days from the date of this letter. Pursuant
to FWRC 19.55.050, any person who received notice of this administrative decision may appeal the
decision to the Federal Way Hearing Examiner by October 19, 2012. Any appeal must be in the form of a
letter delivered to the Department of Community and Economic Development with the established fee.
The appeal letter must contain a clear reference to the matter being appealed and a statement of the
alleged errors in the Director's decision. No work on the proposal can commence until the end of the
appeal period.
In that you are the only party of record, you may waive your right to appeal by submitting a letter to this
effect to the City of Federal Way, Department of Community and Economic Development Services.
Work on the site may not commence until you have been issued the appropriate electrical permit.
This Process I approval is valid for one year from the effective date of this decision. If no further action is
taken within one year, this decision will expire. A one-time, 180-day extension may be granted only if a
written request is submitted to the City's Department of Community and Economic Development at least
30 days prior to the expiration of the decision.
12-104285
Dce. I.D. 62293
Ms. Ausink
October 2, 2012
Page 3
If you have any questions regarding this decision, please contact Becky Chapin, Assistant Planner, at 253-
835-2641 or Rebecca.Chapin@cityoffederalway.com.
Sincerely,
Issac Conlen
Planning Division Manager
for Patrick Doherty, Director
enc_ Approved Site Plan
Becky Chapin, Assistant Planner
Email to Sunny Ausink, sausink@ptswa.com
12-104285 Doc. I.D. 62393
111 S Jackson St, 2nd Floor
Seattle, WA 98104
(206) 342 9000
18 September 2012
City of Federal Way
Department of Community Development Services
33325 8th Avenue South
Federal Way, WA 98003-6325
RE: Process I Application Narrative — Sprint site modification — SE63XC320 Jeffries/CCI#880427
Site Address: 29205 18th Avenue S., Federal Way, WA 98003
Dear Sir or Madam,
Enclosed please find an the Master Land Use Application and six (h6) sets of drawings for a proposed
AT&T modification to an existing wireless site located at 29205 18` Avenue S., Federal Way, WA 98003,
APN#304020-0065.
The proposed modification consists of removing (6) existing panel antennas, installing (3) new panel
antennas, remove (2) existing cabinets, install (3) new cabinets, and adding ancillary equipment to
existing facility located within a Neighborhood Business (BC) zone. No height increase proposed.
Proposed modifications do not change the use of the existing facility. Project is exempt from SEPA and
there is no reduction, material change or adverse impact to landscaping, parking, utilities, approved
architectural design, or environmentally critical areas as defined by FWRC 19.145.
The modification will not result in a change in visual impact, and is part of a technology upgrade being
performed on Sprint Spectrum's network, in order to improve service to its customers and strengthen
reliability and capacity in its network.
The construction valuation is $20,000.
Enclosed with this narrative you will find:
• Master Land Use Application
• Applicable Fees
• (6) copies of the site plan folded
• (6) copies of existing/proposed elevations folded
Please let me know if you require further information to process this application.
ce ler y
Sunny usin
Senior Land Use Planner
Pacific Telecom Services
sausink@otswa.com
(206)446-0448
V
d
RECEIVE® E
SEP 19 2012
CITY OF FEDERAL WAY
CDS
,<ECEIVE®
SEP 19 2012 MASTER LAND USE APPLICATION
DEPARTMENT OF ComKuNrrY DEVELOPMENT SERVICES
a .r CITY OF FEDERAL WAY 33325 8`' Avenue South
CITY OF �` CDS PO Box 9718
Federal Way Federal Way Fax
98835-2608
253-835-2607; Fax 253-35-609
w.w_w,r,i"QLdenaway.com
APPLICATION NO(S) v — (10 ` �_ 65_0O v Date 09-12-2012
Project Name 880427/SE63XC320JEFFRIES
Property Address/Location 29205 18TH AVENUES., FEDERAL WAY, WA 98003
Parcel Number(s) 304GZO-COES
Project Description MODIFICATIONTO EXISTING SITESBYUPRGPADING WITH ANTENNAS AND ADDING ANCILLARY EQUIPMENT.
'LILA`uL MUN 1
Type of Permit Required
Annexation
Binding Site Plan
Boundary Line Adjustment
Comp Plan/Rezone
Land Surface Modification
Lot Line Elimination
Preapplication Conference
X Process I (Director=s Approval)
Process H (Site Plan Review)
Process III (Project Approval)
Process IV (Hearing Examiner's Decision)
Process V (Quasi -Judicial Rezone)
Process VI
SEPA w/Project
SERA Only
Shoreline: Variance/Conditional Use
Short Subdivision
Subdivision
— Variance: Commercial/Residential
Required Information
EC Zoning Designation
COMMERCIAL Comprehensive Plan Designation
Value of Existing Improvements
Value of Proposed Improvements
International Building Code (IBC):
IIB------+--- Occupancy Type
5-2 Construction Type
Applicant
Name: SPRINT SPECTRUM LLC
Address: 1750 FOUNDERS PARKWAY, SUITE 120
City/State: ALPHARETTA,GA
Zip: 30004
Phone: 206-200-0256
Fax:
Email:
Signature:
Agent (if different than Applicant)
Name: SUNNY AUSINK/ PTS
Address:
111 S. JACKSON STREET#200
City/State:
SEATTLE, WA
Zip:
98104
Phone:
206-446-0448
Fax:
206-903-8513
Email: SAUSINK@PTSWA.COM
Signature:
/)� _/1
Owner
Naive: PUGFT SOUND ENERGY
Address: PO BOX 91269 BOT-01 H
City/State: BELLEVUE, WA
Zip: 99009
Phone:
Fax:
Email: 4/m.,7cascer (e pse . cot-,
Signature: y� y�
/ems
Bulletin 4003 - August 18, 2004 Page I of 1 k:\Handouts\Master Land Use Application
SUBMITTAL REQUIREMENTS FOR PROCESS I
Project Name: SE63XC320 JEFFRIES/880427
Project Description: MODIFICATION TO EXISTING SITE BY URPGRADING WITH ANTENNAS AND ADDING
ANCILLARY EQUIPMENT.
Applicant: SUNNY ALISINK
File #:
R spired Submitted
❑
K
Master Land Use Application, signed by owner
❑
A narrative description of the project, on a separate 81/2" x 11" sheet
❑
Application fees
❑
EX
Six copies of the site plan (folded to 9" x 12")
❑
,�
Six copies of existing & proposed building elevations (folded to 9" x 12")
rDJ
❑
Color & materials indicators (photos or color & materials board) IQ
STAFF USE ONLY
Please consider this as a Notice of Completeness.
As of , 20_, this Process I application is determined to be complete
based on the minimum submittal requirements.
Review of the project will begin upon application assignment. The City of Federal Way will
take action on the application upon the determination that all applicable requirements are
met. Please note that City review will be halted at any time City staff requests additional
information.
Intake by;
THIS FORM SHALL ACCOMPANY THE LAND USE APPLICATION AND A COPY SHALL BE PROVIDED TO THE APPLICANT.
Bulletin #053 — January 1, 2011 Page 2 of 2 k:\Handouts\Process I Submittal Requirements