Loading...
16-102226CITY OF ti. Federal Way June 17, 2016 Mr. Jacob Sabin Green Field Services 15607 Canyon Road East Puyallup, WA 98375 CITY HALL 33325 8th Avenue South Federal Way, WA 98003-6325 (253) 835-7000 www.cityoffederalway.com FILE Jim Ferrell, Mayor Re: File #16-102226-00-UP; PROCESS I APPROVAL Cascade Saw & Drilling — Vehicle Wash Cover, 27500 16th Avenue South, Federal Way Dear Mr. Sabin: The Department of Community Development is in receipt of your Process I application to build a 720 square foot pre-engineered freestanding structure for vehicle washing at the Cascade Sawing and Drilling site located at 27500 16t" Avenue South. The Process I application is hereby approved pursuant to conclusions based on findings made by the department's Planning Division. Please note that this approval is limited to land use review of the proposed improvements and does not constitute building permit approval that is required prior to construction. CONCLUSIONS The subject property is zoned Community Business (BC). Pursuant to the Federal Way Revised Code (FWRC) 19.15.030(1), "Review Processes for Improvements and Additions to Developed Sites," additions to an existing developed site that are exempt from the State Environmental Policy Act (SEPA) shall be processed using Process I, Director's Approval; provided the improvements and/or additions do not exceed 25 percent of the gross floor area of the existing use, or 2,000 square feet of new gross floor area. The proposed addition is 720 square feet, which is approximately 6 percent of the existing building (12,200 square feet); therefore, it is subject to Process I. Based on the findings below, the proposed improvements to the developed site meet the following Process I approval criteria of FWRC Chapter 19.55, "Director's Approval": (1) The proposal complies with the provisions of FWRC Tide 19, "Zoning and Development Code," and all other applicable law. (2) The health, safety, and welfare of the citizens of the city are preserved. FINDINGS OF FACT 1. Proposal— The applicant submitted a Process I application on May 10, 2016, to add a 720 square foot pre- engineered freestanding structure for vehicle washing. Mr. Jacob Sabin Page 2of3 June 17, 2016 2. Comprehensive flan & Zoning Designation — The subject property is located within the Conununity Business comprehensive plan designation and BC zone. 3. Use Process — The application is subject to Process I, Director's Approval, pursuant to FWRC 19.15.030(1). 4. Noncanforming Devl l6pNent —'The principal structure was built in 1968, prior to the city's incorporation, and is considered a nonconformng development. Pursuant to FWRC 19.30.090, "Nonconformance," a nonconforming development must be brought into conformance if, "An applicant proposes to add to the subject property either 2,500 square feet of new gross floor area or more, or 25 percent of the gross floor area or more of the building(s) on the subject property, whichever is less, within any consecutive 36- month time -period commencing at the time of building permit issuance." The proposal is for the addition of a 720 square foot free standing structure, which is approximately 6 percent of the gross floor area of the existing building; therefore, the site is not required to meet existing regulations. 5. Height — The proposed height of the car wash is 10 feet, which complies with the maximum 35 foot height for this use. 6. Setbacks— The setbacks are 0 feet for office in the BC zone. The proposed location complies with required setbacks. 7. Community Design Guidelines Compliance — The location of the proposed structure is not visible from any right-of-ways, therefore it is exempt from FWRC 19.115.060(2),I wluch requires building modulation or screening. 8. Environmental Review — SEPA review is not required based on its size.2 9. Review by other Divisions and Departments — Staff from the city's Planning and Building Divisions and Public Works Department, and representatives from Lakehaven Utility District and South King Fire and Rescue reviewed the Process I application. The only comments received on the Process I was from the Lakehaven Utility District (enclosed). You may have already received comments on your building permit (#16-102228-00-CO), and/or will be receiving comments from the other reviewers. LAND USE REVIEW FEE A zoning review fee of $155.00 must be submitted prior to building permit issuance. Please see the enclosed invoice. BUILDING PERMIT ISSUANCE REQUIRED The department's Building Division will review the building permit for these improvements once submitted. No work may begin until the building permit is issued. I Building Design — All Zoning Districts of the Community Guidelines 2 FWRC 14.15.030(1)(b) exempts office, commercial, recreational, service, or storage buildings up to 12,000 square feet gross floor area from SEPA review. File #1 6-102226-00-UP D— I.D. 73871 Mr. Jacob Sabin Page 3 of 3 June 17, 2016 APPEALS The effective date of this decision is June 20, 2016. Pursuant to FWRC 19.55.050, "Appeals," any person who receives a notice of this administrative decision may appeal the decision to the Federal Way Hearing Examiner by July 8, 2016. Any appeal must be in the form of a letter delivered to the Department of Community Development with the established fee. In that you are the only party of record, your appeal period is waived (assuming you do not wish to appeal this decision). Waiver of the right to appeal does not affect the effective date of this decision. No work on the proposal may begin until the end of the appeal period. CLOSING This Process I approval does not constitute approval of a building permit. If you have any questions regarding this decision, please contact Principal Planner Margaret Clark, AICP, at m irgaret.clark rri7gc offederalway.com, or 253-835-2646. Sincerely, Scott Sproul Acting Community Development Director Enc: Lakehaven's Comments Lakehaven Utility District Application for Certificate of Availability Lakehaven Utility District Vehicle Wash Pad Sewer Design & Operation Standards — 2011 Lakehaven Utility District Service Connection Application Invoice c: Margaret Clark, Principal Planner Peter Lawrence, Plans Examiner Kevin Peterson, Engineering Plans Reviewer Sarady Long, Senior Transportation Engineer EJ Walsh, Deputy Public Works Dune-tor/PAEC Project Director Brian Asbury, Lakehaven Utility District Vince Faranda, South King Fire & Rescue Doc. LD. 73871 File #16-102226-00-UP Cascade Saw and Drilling Proposal f Proposed addition to an improved site of a 720 square foot pre-engineered freestanding cover for vehicle washing Existing Use The existing use is an Office and Maintenance Shop. Vehicles and equipment associated with off -site sawing concrete and drilling are stored on -site. This use does not fit cleanly into any zoning category. It is more similar to "Contractor's yards for storage of commercial equipment, vehicles, bulk building materials, and similar items," which is only allowed in the Commercial Enterprise (CE) Zone. If we considered it as an office, it would be allowed in the Community Business (BC) Zone. Location Address Parcel Number Zoning Lot Size Building Size East of Ave S and west of Pacific Highway South, just south of LA Fitness 27500 16th Ave South 332204-9170 Community Business (BC) 0.86 acres (37,462 sq. ft.) 12,200 sq. ft. Review Process Process I pursuant to Federal way Revised Code (FWRC) 19.15.030 Review processes for improvements and additions to developed sites. Improvements and/or additions to existing developed sites, except critical area intrusions as regulated by Division V of this title, shall be subject to land use review processes as follows: (1) Minor improvements, modifications and additions. Minor improvements, modifications and additions to a site such as parking lot and landscape area modifications and improvements, and/or additions to an existing developed site that are exempt from SEPA shall be processed using process I, provided the improvements and/or additions do not exceed either of the following thresholds: Nonconforming Use Nonconforming (a) Twenty-five percent of the gross floor area of the existing use"; or (b) Two thousand square feet of new gross floor area. 19.30.080 Nonconforming use. Any nonconforming use must be terminated if: (1) The applicant is expanding gross floor area on the subject property, whether the expansion involves an addition to an existing building or a new and separate structure. (2) The subject property has been abandoned. 19.30.090 Nonconforming development. development (1) All nonconforming aspects of a development must be brought into conformance if: (a) An applicant proposes to add to the subject property either 2,500 square feet of new gross floor area or more, or 25 percent of the gross floor area or more of the building(s) on the subject property, whichever is less, within any consecutive 36- month time period commencing at the time of building permit issuance; or 1 The car wash is about six percent of the existing building. (b) The property is abandoned. Design Guidelines Per Section 2 of FWRC 19.115.060 Building design, — All zoning districts, building modulation or screening is not required as it is not visible from a right-of-way. 719,rj i ,, r-�r, 4w b LO Af Vm- 1440 qw t . y+A y / ! .A:.. 1 •mow. � r � r r i r Go .... ler- rtil Goog - { All s CITY OF FEDERAL WAY COMMUNITY DEVELOPMENT DEPARTMENT TRANSMITTAL DATE: May 19, 2016 TO: EJ Walsh, Deputy Public Works Director (3 copies) Rick Perez, Traffic Engineer Peter Lawrence, Plans Examiner Brian Asbury, Development Engineering Supervisor, Lakehaven Utility District Vince Faranda, Deputy Fire Marshal, South King Fire & Rescue FROM: Margaret Clark, Principal Planner, Planning Division REQUEST. Please e-mail ant technical comments to Margaret.clarkL,cityo£federalway.com FILE NUMBER(s): 16-102226-00-UP PROJECT NAME: CASCADE SAWING AND DRILLING PROJECTADDRESS: 27500 16t' Ave South PARCEL No.: 332204-9170 ZONING DISTRICT: Community Business (BC) PROJECT DESCRIPTION: Proposed 720 square foot pre-engineered freestanding cover for vehicle washing LAND USE PERMITS. PROJECT CONTACT.• Process I Greenfield Services 15607 Canyon Road East . Puyallup, WA 98375 253-531-3176 goteamgreenfield.com MATERIALS SUBMITTED BYAPPLICANT. Signed MLU application Submittal Checklist Cover Letter Site Plan Design Notes, Design Criteria, & Drawing Index CITY OF FEDERAL WAY COMMUNITY DEVELOPMENT DEPARTMENT TRANSMITTAL DATE: May 19, 2016 TO: EJ Walsh, Deputy Public Works Director (3 copies) Rick Perez, Traffic Engineer Peter Lawrence, Plans Examiner Brian Asbury, Development Engineering Supervisor, Lakehaven Utility District Vince Faranda, Deputy Fire Marshal, South King Fire & Rescue FROM: Margaret Clark, Principal Planner, Planning Division REQUEST. Please e-mail ant technical comments to marizaret.clarkOcityoffederalwM.com FILE NUMBER(s): 16-102226-00-UP PROJECT NAME: CASCADE SAWING AND DRILLING PROJECT ADDRESS: 27500 16t' Ave South PARCEL No.: 332204-9170 ZONING DISTRICT.- Community Business (BC) PROJECT DESCRIPTION. Proposed 720 square foot pre-engineered freestanding cover for vehicle washing LAND USE PERMITS PROJECT CONTACT. Process I Greenfield Services 15607 Canyon Road East Puyallup, WA 98375 253-531-3176 goteamgreenfield. com MATERIALS SUBMITTED BY APPLICANT. Signed MLU application Submittal Checklist Cover Letter Site Plan Design Notes, Design Criteria, & Drawing Index 1 KECEIVED MAY 10 2016 „� CM OF FEDERAL WAY Cl*" of CDS Federal Way MASTER LAND USE APPLICATION DUARTMOrr of CotvtwNrrr DEVEcoPmv%,r SrsvicEs 33325 V Avenue South Federal Way, WA 98003-6325 253-835-2607;Fax 253-835-2609 ww W.cityniffrierlway.com APPLICATION lr't?l, ? , � I � � �P .1 /t • Date Project Natnte __r 0 11 Property Address/Location fir_ �,�5 �k '; oqnar__�l Parcel Number(®) -- 3 :2 0 ? 19 J 1 O Project Iieserilrr-en ke,t% . t`. vCLrae PLEASE I'al!%r Type of Pertnit Required _ Annexation Binding Site Plan _ Boundary Un; Adjustment Camp Plaruz:eL.:rte Lane Surface Modification Lot Line Eliminal idn --f'*estl>nl�c�.t5c•r Ca;inerett::e Piocr;.es III (Project Approval)' Process IV (Heatiag Examiner's Decision) Process V ;G.l asi-lndidal Rezone) _ prous" , SEPA w&rojet _, Only A a.Faa:'�,,10juditional Use Variance. Corniner'cio.i/Rce idential Required inforrriation if L I.f „—__Zoning Designation C,P.y'V', Plan Designation 3 Value of Existing Improvements ,4171-, QQValue of Proposed Improvements Inrernativnral tim-V ing (.'ode (IBQ: Occupancy Typc _.�._ Construction Type s Applicant Name; C P-rt _'V F1ZT i7 �--W' tt�Y Address: )S(o,7 o4,iyool gC), z,+9. City/State: Pu`1ls44,r..P WN, Zip: 9y.I'75 Phone: 2 53 -3 / 9 /d Fax: }},,� l" ritztil: c oZr ova � g r� 9 N F; �%� r Signature- f Agent (if different.rhan Applicant) Name: Address: City/State: Zip: Phone: Fax: Email: Signature: Owner Name: ��4 C{ • ��iU t� ct Zap: Plione: Fax: : Z 3 ` g f�c• —, . Email:.r�6�`X-tllftF-fCt�lctl,(i1�1.��ri� Signature: Bulletin #06--- J'I;Uary 1, 2w t � Page I of I k4landow,%Nlaster land Use Application RECEIVED SUBMITTAL REQUIREMENTS FOR PROCESS I Q • - �llflLs"ia' IJ► Project Description: Applicant: File #: MAY 10 Z016 CITY OF FEDERAL WAY CDS STAFF USE ONLY Please consider this as a Notice of Completeness. As of U 201 C this Process I application is determined to be complete based on the minimum submittal requirements. Review of the project will begin upon application assignment. The City of Federal Way will take action on the A plic l07? Upon the determination that all applicable requirements are ,met. Please note � City ew will be halted at any time City staff requests additional ]nforrnation. 1 Intake by: THis FORM THE LEWD UsL APPLICATION AND A COPY SHALL BE PROVIDED TO THE APPLICANT. Bulletin #053 — January 1, 2011 Page 2 of 2 k:\Handouts\Process I Submittal Requirements GREENFIELD SERVICES IIAC. 15607 Canyon Rd. Ea. Puyallup, WA. RECEIVED Office PH # 253-531-3176 MAY 1, 0 2016 CITY OF FEDERAL WAY CDS DATE: TO: City of Federal Way ATTN: Becky Chapin RE: Proposed scope of work for the addition of 1 ea. 18' x 40' x15' covered vehicle wash area behind the existing office/maintenance building. SUMMARY SITE WORK TO INCLUDE: The removal of the existing asphalt to accommodate the proposed vehicle wash area which will include 1 ea. 18' x 40' concrete slab (6" of concrete and 4" crushed rock), 100 feet of 8" x 2' concrete stem walls (on 3 sides of the perimeter of the new canopy) and 1 ea. 18' x 40'x 15' open canopy to be placed on top of the new concrete stem walls ALSO INCLUDDED: There will be 242 LF of 6" PVC D3034 Sewer pipe, 3 ea. Clean outs, 1 ea. TY 1 catch basin and 1 ea. CPS-25 OWS. This will also include any restoration required to complete the site. Sincerely, �f acob Sabin w v s In 1 Q v 0 GO rn 7fACC.R(l Lf) y �?S N IN0) co � m ivswravy"TJ n ID 1h0 b'G (v Nj d• N'• res p W N Q v Sol S2 Sr1� /wit gCy1,7` E+r�l;�-iy�fI , , • ;3' �A m V 41. ` Q � Y"Ss /SI X3 y.4 RECEIVED JUN 0 6 2016 t� CITY OF FEDE RAL WAY t,10 CDS 00 City of Federal Way Q&A Based on a phone conversation you had with the Permit Center, it is my understand that you are preparing plans to construct a canopy and/or carport. A Process I land use review will be required as it is an improvement/addition to a developed site (FWRC 19.15.030). There is potential that any storage use may need to be screened if visible from the right of way or adjacent property. Four copies of a site plan and elevations drawings will be required with the Process I application submittal. If you want to provide me with some more information I can let you know if additional landscaping/screening is required. What is the current use of the building? Will the structure be attached to the building? Office and Maintenance shop It is my understanding that the improvement it is more like a carport structure vs. a canopy. The City's definition of a canopy is a permanent, rigid, roof -like structure that projects from a building as a shelter, with no habitable space above it. Can you verify that it's more of a carport/tent like structure, a description of the improvement. This structure is a canopy cover for a carwash for washing company vehicles. Is the proposed structure going to be used for outdoor storage? If so, is material stored visible from a right of way? I was incorrect in the description I gave you, there will be no storage and it is on the back side of the building out of site from the ROW Will the proposed structure take up any parking or landscaping? No, it is,within 2 feet of the existing building. Please let me know if you have any questions. Best, Becky Chapin Associate Planner AI- # P3,0" or-WI-gD0 0 t�# 33325 8` Avenue South Federal Way, WA 98003-6325 Phone:253-835-2641 Fax: 253-835-2609 www.citVoffederalway.com