Loading...
23-100719I.4 7 -1 r y Building - Single Family City of Federal Way Permit #:23-100719-00-SF Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Inspection Request Line: (253) 835-3050 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: THE WOODLANDS AT REDONDO CREEK LOT 11 Project Address: 1931 S 301ST CT Parcel Number: 952651 0110 Project Description: BLUEBEAM - Construction of a 1860 square foot 2-story single family residence with a 75 square foot covered entry and 'a 371 square foot attached garage. Includes plumbing and mechanical. Owner Applicant Contractor Lender SSHI LLC DBA D R HORTON JESS BOSANCUD R HORTON D R HORTON OWNER IS LENDER 11241 SLATER AVE NE SUITE 12C 11241 SLATER AVE NE SUITE 120 11241 SLATER AVE NE SUITE 120 KIRKLAND WA 98033 KIRKLAND WA 98033 KIRKLAND WA 98033 Census Category: 101 - New Single Family House Includes: #1 #2 93 #4 Occupancy Class: R-3 Construction Type: Type V - B Occupancy Load: Floor Area (sq. ft.) 1,860.00 Additional Permit Information New / Additional Sq. Feet - 1st Floor..... ................ 973 New / Additional Sq. Feet - 2nd Floor.................... 887 New / Additional Sq. Feet - 3rd Floor ........:...:.:...... 0 Occupancy #1 - Area (Sq. Feet)...„......................... 1860 New / Additional Sq. Feet - Basement .................... 0 Basic Plan?................ ..................................... No Occupancy #1 - Construction Type ......................... Type V - B New / Additional Sq. Feet - Deck ........................... 0 New / Additional Sq. Feet - Garage........... ............. 371 Mechanical to be Included?..................................... Yes Plumbing Work Valuation? ..................................... 20000 Mechanical Work Valuation9.................................. 15000 Number of Stories ................................................... 2 New / Additional Sq. Feet - Other........................... 75 Plumbing to be Included? ........................................ Yes New / Additional Sq. Feet - Total.......................... 2306 Will Certificate of Occupancy be Issued? ............... Yes Occupancy #1 - Use ................................................ Residence (1 or 2 family) Comprehensive Plan Designation ........................... SF - High -Density Zoning Designation ................................................. RS 5.0 Residential Total Valuation: 339,465.89 Mechanical Fixtures Fans 5 Furnaces 1 Gas Piping 1 — -- -- Plumbing Fixtures Bathtubs 2 Dishwashers 1 Laundry Washer Outlets 1 Lavatories 4 Showers 2 Sinks 1 Water Closets 3 Water Heaters 1 Hose Bibbs 2 CONDITIONS: No part of the main structure may extend into the side yard setback. Eaves/awnings may extend up to 18 innhae in+n +hP rrrrnirerl vnrd - emmnlianee with FWRC 19.125.160. PERMIT EXPIRES Monday, 4 September, 2023 Permit Issued on Wednesday, March 8, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. is Owner or agent: Date: 1 --- City of Federal Way Certificate of occupancy This Certificate issued pursuant to the requirements of Section 111 of the International Building Code or Section R110 of the International Residential Code is certifying that at the time of issuance, this structure was in compliance with the various ordinances of the City regulating building construction or use. This certificate is valid ONLY when endorsed by City staff. Tenant Name: THE WOODLANDS AT REDONDO CREEK LOT Permit # 23-100719-00-SF Address: 1931 S 301ST CT Includes: # 1 #2 #3 #4 Occupancy Class: R-3 Construction Type: Type V - B Occupancy Load: Floor Area (sq. ft.) 1,860.00 Owner Name: SSHI LLC DBA D R HORTON Owner Address: 11241 SLATER AVE NE SUITE 120 KIRKLAND WA 98033 Date The priority focus in the reOejO and inspection made by the City prior to issuance of this Certificate was on those matters which experience has shown most severely affect the health and safety of the general public. Although the City has made as complete a review and inspection as is reasonably possible (within budgetary time and personnel limitations), the City neither guarantees nor warrants to the owner/occupant or to any otherperson that this Certificate evidences strict compliance with each and every ordinance or regulation of the City or the State of Washington affecting the construction or use of said structure or the land upon which it is situated. Such compliance is the responsibility of the owner and / or occupant of the premises. f _4%, CITY OF Federal Way THIS CARD IS TO REMAIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 23 100719 00 Address: 1931 S 301ST CT Project: SSHI LLC dba D R HORTON FEDERAL WAY WA 98003 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. Q SWM Precon Site Mtg (4400) ❑ Site Assessment (Erosion) (4365) Q Footings/Setback (4110) Approved To be done PRIOR to breaking ground Approved to place concrete By Date By Date By V Date Q Foundation Wall (4115) ❑ Drainage/Downspout (4040) © Plumbing Groundwork (4190) Approved to place concrete Approved to backfill Approved to cover By Date s j '2 By ] Date r� By Date ❑ Slab/Concrete Floor (4255) ❑ Underfloor Framing (4285) Floor Sheathing (4105) Approved to place concrete Approved to sheath floor Approved to install flooring By Date By G Date By - 0 Date fz 90 Shear Walls (4245) Approved to install siding By Date Mechanical Rough -in (4165) Approved By Date Tltks 15 Interim Erosion Control (4370) Approved By Date a Insulation (4150) Approved to install wallboard By (�) Date . Jlq 7 7Final- Mechanical(4065) Approved A 1 El Roof Sheathing (4220) Rough Plumbing (4230) Approved to install roofing Approved By Date d=/ J6. BY To Date Gas Piping (4125) ❑ Fire/Draft Stops (4095) Approved to release tes Approved By J C Date i I By G Date Prior to scheduling a Framing inspection; Q Framing (4120) Electrical, Plumbing & Mechanical Rough -in Approved to insulate and Fire/Draft Stop inspections must be signed- off and approved. IBC 109.3.4 By Date 1 19 Gypsum Wallboard Nailing (4130) Approved to install mud & tape By G Date lI to-L 22 Final - Plumbing (4075) Approved By Date 13 y By Date �1I L 2t] Final Erosion Control (4375) Approved By Date 23 Final - Building (4050) Approved By `' Cj Date Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date I I By Date By Date j Buildifig Division CITY OF 33325 Eighth Avenue South 4::kFederal Way Federal Way, Fax 98835-3325 Phone 253 decal Way, Fax 25 8003-6325 CORRECTION NOTICE ADDRESS. �' (�. -� 1 <3} Cl 1 PERMIT#: IF YOU HAVE QUESTIONS CALL a (253) 835-ZZ777 WHEN CORRECTIONS HAVE BEEN MADE, CALL (253 35-3050 FOR RE -INSPECTION. SEE BACK OF CARD FOR DETAILS. NOTE: ELECTRICAL CORRECTIONS ARE REQUIRED TO BE MADE WITHIN 15 DAYS. 2 - �Fzi. DATE INSPECTOR DO NOT REMOVE THIS NOTICE Page of CITY OF Federal Way Building Division 33325 Eighth Avenue South Federal Way, WA 98003-6325 Phone 253-835-2607 Fax 253-835-2609 CORRECTION NOTICE ADDRESS: �Gl � a1 �� PERMIT#: 1(a6Tlq `Np 1 IVO a oil IF YOU HAVE QUESTIONS CALL �' irC�`ti (253) 835- WHEN CORRECTIONS HAVE BEEN MADE, CALL (253) 835-3050 FOR RE -INSPECTION. SEE BACK OF CARD FOR DETAILS. NOTE: ELECTRICAL CORRECTIONS ARE REQUIRED TO BE MADE WITHIN 15 DAYS. BATE INSPECTOR DO NOT REMOVE THIS NOTICE Page of CITY OF Building Division � 33325 Eighth Avenue South Federal Way, WA 98003-6325 FederaI Way Phone 253-835-2607 Fax 253-835-2609 CORRECTION NOTICE ADDRESS: S - �?01 St- Ch PERMIT#: ?-7- I o©7I g-a6 61, IF YOU HAVE QUESTIONS CALL (253) 835- SIC717 WHEN CORRECTIONS HAVE BEEN MADE, CALL (253) 83 3050 FOR RE -INSPECTION. SEE BACK OF CARD FOR DETAILS. NOTE: ELECTRICAL CORRECTIONS ARE REQUIRED TO BE MADE WITHIN 15 DAYS. DATE INSPECTOR DO NOT REMOVE THIS NOTICE Page , of